HomeMy WebLinkAboutUnderlayment NOADEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)
BOARD AND CODE ADMINISTRATION DIVISION
NOTICE OF ACCEPTANCE (NOA
Boral Roofing LLC.
7575 Irvine Center Drive, Suite 100
Irvine, CA 92618
SCOPE:
MIAMI-DADE COUNTY
PRODUCT CONTROL SECTION
1 1805 SW 26 Street, Room 208
Miami, Florida 33175-2474
T (786) 315-2590 F (786) 315-2599
w,,Nw.miamidade.gov/econonry
This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The
documentation submitted has been reviewed and accepted by Miami -Dade County RER - Product Control Section to be
used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ).
This NOA shall not be valid after the expiration date stated below. The Miami -Dade County Product Control Section
(In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this
product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted
manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or
suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance,
if it is determined by Miami -Dade County Product Control Section that this product or material fails to meet the
requirements of the applicable building code.
This product is approved as described herein, and has been designed to comply with the Florida Building Code
including the High Velocity Hurricane Zone of the Florida Building Code.
DESCRIPTION: BORAL TileSeal
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and following
statement: "Miami -Dade County Product Control Approved", unless otherwise noted herein.
RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change
in the applicable building code negatively affecting the performance of this product.
TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the
materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product,
for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section
of this NOA shall be cause for termination and removal of NOA.
ADVERTISEMENT: The NOA number preceded by the words Miami -Dade County, Florida, and followed
by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then
it shall be done in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and
shall be available for inspection at the job site at the request of the Building Oficial.
This new NOA consists of pages 1 through 4.
The submitted documentation was reviewed by Alex Tigera.
NOA No.: 18-0502.03
Expiration Date: 08/02/23
Approval Date: 08/02/18
T3___ I -r e
ROOFING COMPONENT APPROVAL
Category: Roofing
Sub -Category: Underlayment
Material: SBS
PRODUCTS DESCRIPTION:
NOA No.: 18-0502.03
Expiration Date: 08/02/23
Approval Date: 08/02/18
Test
Product
Product
Dimensions Specification
Description
BORAL TileSeal
36" x 36' rolls TAS 103
SBS self -adhering asphalt sheet material with a
36" x 72' rolls ASTM D1970
white glass re -enforced polyester surfacing fabric;
for use as an underlayment in sloped roof
assemblies.
Boral Citadel Plus
36" x 72' rolls ASTM D1970
SBS self -adhering asphalt sheet material with a
poly film -facer; for use as a mid -ply underlayment
in sloped roof assemblies.
MANUFACTURIGN LOCATION:
1. Brentwood, NH.
2. Houston, TX.
EVIDENCE SUBMITTED:
Test Agency
Test Identifier
Test Name/Report Date
PRI Construction Materials
OCF-356-02-04
ASTM D1623 07/25/18
Technologies, LLC.
OCF-356-02-02
TAS 103 07/24/18
OCF-356-02-01
ASTM D1970 07/26/18
OCF-424-02-04
ASTM D1623 07/25/18
OCF-424-02-01
ASTM D1970 07/25/18
OCF-424-02-03
TAS 103 07/25/18
Trinity ERD
BRLRF-SC16810.11.17
ASTM D 1876 11/28/17
NOA No.: 18-0502.03
Expiration Date: 08/02/23
Approval Date: 08/02/18
APPROVED ASSEMBLIES:
Deck Type 1: Wood, non -insulated
Deck Description: 15/32" or greater plywood or wood plank
System E(1): Anchor sheet mechanically fastened deck, membrane adhered.
Base Sheet: One or more plies of ASTM D226 Type Il or ASTM D2626 with a minimum 4" head lap and a
6" end lap mechanically fastened to deck with approved nails and tin caps 6" o.c. at the laps
and two staggered rows 12" o.c. the field of the roll.
Ply Sheet Apply one layer of Boral Citadel Plus over Base sheet as per current approval.
(Optional):
Membrane: One or more plies of BORAL TileSeal Underlayment with a minimum 3" head lap and
minimum 6" end lap. Place the first course of membrane parallel to the eave, rolling the
membrane to obtain maximum contact. Remove the release membrane as the membrane is
applied. Vertical strapping of the roof with BORAL TileSeal Underlayment is acceptable. All
end laps and laps without black selvage area shall be sealed under lap using an SBS modified
mastic.
Note: When used in Tile roof systems BORAL TileSeal Underlayment shall be back nailed to
deck with approved annular ring shank nails and tin caps at a maximum 12" o.c. at the side
laps. No nails or tin caps shall be exposed.
Surfacing: Approved for Adhered Roof Tile using TILE BOND or AH -160, Mechanically Fastened Roof
Tile, Metal Roofing, Wood Shake & Shingles, and Asphaltic Shingle assemblies.
NOA No.: 18-0502.03
Expiration Date: 08/02/23
Approval Date: 08/02/18
LIMITATIONS:
1. Fire classification is not part of this acceptance.
2. This acceptance is for prepared roofing applications. Minimum deck requirements shall be in compliance with
applicable building code. BORAL TileSeal underlayment shall be installed in strict compliance with applicable
Building Code.
3. BORAL TileSeal underlayment shall be applied to a smooth, clean and dry surface with deck free of irregularities.
4. BORAL TileSeal underlayment shall not be applied over an existing roof membrane as a recover, but may be
applied over a roofing Base/Anchor sheet underlayment.
BORAL TileSeal underlayment shall not be left exposed as a temporary roof for longer than 180 days of
application.
6. The standard maximum roof pitch for BORAL TileSeal underlayment shall be 6:12 when tiles are loaded directly
to the BORAL TileSeal underlayment; loading boards or battens are required on roof pitches greater than 6:12".
7. Refer to Prepared Roofing system Product Control Notice of Acceptance for listed approval of this product with
specific prepared roofing products.
8. Tiles shall be stored on battens on roof pitches greater than 6:12".
9. BORAL TileSeal underlayment may be used with any approved roof covering Notice of Acceptance listing
BORAL TileSeal underlayment as a component part of an assembly in the Notice of Acceptance. If BORAL
TileSeal underlayment is not listed, a request may be made to the Authority Having Jurisdiction (AHJ) or the
Miami -Dade County Product Control Department for approval provided that appropriate documentation is
provided to detail compatibility of the products, wind uplift resistance, and fire testing results.
10. All nails in the deck shall be carefully checked for protruding heads. Re -fasten any loose decking panels. Sweep
the deck thoroughly to remove any dust and debris prior to application.
11. When applying the membrane in the valley, start at the low point and work to the high point, rolling the membrane
from the center outward in both directions. For ridge applications, center the membrane and roll from the center
outward in both directions.
12. Roll or broom the entire membrane surface so as to have 100% contact with the surface, giving special attention to
overlap areas.
13. Flash vent pipes, stacks, chimneys and penetrations in compliance with Roof Assembly current Product Control
Notice of Acceptance and applicable Building Code.
14. All protrusions or drains shall be initially taped with a 6" piece of underlayment. This target piece shall be pressed
in place and formed around the protrusion to ensure a tight fit. A second layer of BORAL TileSeal underlayment
shall be applied over the underlayment, and sealed using an SBS modified mastic.
15. All products listed herein shall have a quality assurance audit in accordance with the Florida Building Code and
Rule 61G20-3 of the Florida Administrative Code.
16. All membranes or packaging shall bear the imprint or identifiable marking of the manufacturer's name or logo, city
and state of manufacturing facility, and the following statement: "Miami -Dade County Product Control Approved"
or the Miami -Dade County Product Control Seal as shown below
MIAMI•DADE COUNTY
...W `�
END OF THIS ACCEPTANCE
NOA No.: 18-0502.03
Expiration Date: 08/02/23
Approval Date: 08/02/18
n..._.. A ..r A