Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Plans
ELECTRICAL SYMBOL LEGEND 110V RECEPTACLE LD FUSE DISCONNECT QUAD-PLEX RECEPTACLE EW1 ELECTRICAL CIRCUIT BREAKER C HALF -CONTROLLED RECEPTACLE WITH Dg FACTORY INSTALLED DISCONNECT FACTORY IMPRINTED AND PERMANENT LABELING/MARKING SYMBOL, 0 ELECTRICAL PANEL 8 WP 4.V WATER PROOF WITH WR TYPE RECEPTACLE ELECTRICAL METER ll GROUND FAULT CIRCUIT 4Y GFI .INTERRUPTER B LIGHTING CONTROL TIME CLOCK/PANEL RECEPTACLE MOUNTED ABOVE COUNTER VERIFY MOUNTING HEIGHT WITH TELEPHONE BOARD OWNER/ARCHITECT PRIOR TO ROUGH IN ® SPECIAL PURPOSE OUTLET (VERIFY) $ SWITCH FLOOR RECEPTACLE. WITH ® COVER PLATE, FLUSH WITH FLOOR $3 3-WAY SWITCH (1 CEILING RECEPTACLE $4 4-WAY SWITCH ®FLOOR RECEPTACLE/TELE/FAX/DATA $o DIMMER. SWITCH WITH COVER PLATE, FLUSH WITH FLOOR'. MANUAL MOTOR STARTER. FLOOR TELE/FAX/DATA PORT WITH COVER PLATE, FLUSH WITH FLOOR .PUSH BUTTON A TELE/FAX/DATA PORT 31E31E CR SENSOR DOOR OPENER/CARD READER** BY.OTHERS (V CEILING TELE/FAX/DATA PORT 3E3IE ,. �A ALARM BY. OTHERS 31E31E T[IV TELEVISION JACK IG ISOLATED GROUND O. JUNCTION BOX _ ASW ABOVE SHOW. WINDOW - POWER POLE CM CEILING MOUNTED [liP RECESSED JUNCTION BOX FOR AC ABOVE COUNTER SYSTEM FURNITURE POWER UC UNDER COUNTER OT/D RECESSED JUNCTION BOX FOR SYSTEM FURNITURE TELEPHONE/DATA AFF ABOVE FINISHED FLOOR EF EXHAUST FAN VIF VERIFY IN FIELD Or THERMOSTAT TGB _rr TELEPHONE GROUND BAR 0 REMOTE ALARM TEST STATION lE) EXISTING - COORDINATE REPLACING COVER PLATES W/ OWNER/ARCH ©DD SMOKE DUCT DETECTOR (RE) RELOCATED EXISTING - COORDINATE REPLACING COVER PLATES W/ ` l STEP DOWN. TRANSFORMER OWNER/ARCH NO SYMBOL NEW ® CENTRAL CONTROL PANEL .31E NOTE ALL SYMBOLS MAY NOT BE USED FOR TI�{IS PROJECT 3E 5IE PROVIDE 1" C WITH PULL WIRE UNLESS OTHERWISE NOTED. STUB UP 6" ABOVE CEILING, NOTES: RECEPTACLES ARE TO BE MOUNTED AT 18" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. SWITCHES ARE TO BE MOUNTED AT 48" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED, CONTRACTOR GENERAL CONDITIONS NOTES 1.. RFI'S: CONTRACTOR SHALL SUBMIT RFI'S WITH HIS PROPOSED SOLUTION IN A TIMELY MANNER. CONTRACTOR RECOGNIZES THE CONSULTANT SHALL REQUIRE UP TO 5 WORKING DAYS TO RESPOND. 2. SUBMITTALS AND PRODUCT DATA: CONTRACTOR SHALL PREPARE A SUBMITTAL SCHEDULE FOR APPROVAL BY THE A/E. CONTRACTOR RECOGNIZES THE CONSULTANT SHALL REQUIRE UP TO 10 WORKING DAYS TO REVIEW SUBMISSIONS. ALL SUBMITTALS, PRODUCT DATA, SHALL BE CLEARLY STAMPED AND INDICATED APPROVED BY THE CONTRACTOR PRIOR TQSUBMISSION TO THE CONSULTANT. 3. SHOP DRAWINGS: CONTRACTOR SHALL PREPARE A SHOP DRAWING SCHEDULE FOR APPROVAL BY THE A/E. CONTRACTOR RECOGNIZES THE CONSULTANT SHALL REQUIRE UP TO 10 WORKING DAYS TO REVIEW SHOP DRAWINGS. ALL SHOP DRAWINGS, SHALL BE CLEARLY STAMPED AND INDICATED APPROVED BY THE CONTRACTOR PRIOR TO SUBMISSION TO THE CONSULTANT. 4. LAYOUT. AND COORDINATION DRAWINGS: CONTRACTOR SHALL PREPARE SCALED COMPREHENSIVE COORDINATED LAYOUT DRAWINGS. PROVIDE SECTIONS., GENERAL ARRANGEMENTS, ELEVATIONS INCLUDING ALL DISCIPLINES FOR HIS PROPOSED LAYOUT AND ROUTING PRIOR TO FABRICATION. SUBMIT TO OWNER AND A/E FOR R CONFORMANCE. REVIEW AND GENERAL CONFRR PROVIDE DRAWINGS THAT DEMONSTRATE VIA R COORDINATED. ELEMENTS AND SYSTEMS WITH STRUCTURE THAT CLEARLY INDICATE PROPOSED SYSTEMS WILL FIT, FUNCTION AS INTENDED, BE. FREE OF INTERFERENCES AND CONFORM TO REQUIRED CODE AND MANUFACTURER WORKING AND MAINTENANCE CLEARANCES. 5. DEVIATIONS FROM BASIS FOR DESIGN SYSTEMS SHALL BE CLEARLY IDENTIFIED ON ALL SUBMISSIONS. 6. SUBSTITUTIONS: A: CONTRACTOR SHALL PREPARE REQUESTS WITH COMPLETE COORDINATION INFORMATION, INCLUDE ALL CHANGES REQUIRED IN OTHER ELEMENTS OF THE WORK TO ACCOMMODATE THE SUBSTITUTION INCLUDING WORK PERFORMED BY THE OWNER AND THE SEPARATE CONTRACTORS. B. PROVIDE COMPLETE SUPPORTING DATA QUALIFYING THE SUBSTITUTION COMPARED TO THE BASIS OF DESIGN SYSTEM. PROVIDE A DETAILED LIST OF ANY VARIANCES, PHYSICAL OR SPATIAL LAYOUTS, ELEVATIONS, ETC, TO THE BASIS OF DESIGN C. PROVIDE A. STATEMENT INDICATING THE EFFECT THE SUBSTITUTION WILL HAVE ON THE WORK .SCHEDULE IN COMPARISON TO THE SCHEDULE WITHOUT APPROVAL OF THE PROPOSED SUBSTITUTION, INCLUDE INFORMATION REGARDING THE EFFECT OF THE PROPOSED SUBSTITUTION ON THE CONTRACT TIME. D. PROVIDE. CERTIFICATION BY THE CONTRACTOR TO THE EFFECT THAT, IN THE CONTRACTOR'S OPINION, AFTER THOROUGH EVALUATION, THE PROPOSED SUBSTITUTION WILL RESULT IN WORK THAT IN EVERY SIGNIFICANT RESPECT IS EQUAL TO OR BETTER THAN THE WORK REQUIRED BY THE CONTRACT DOCUMENTS AND THAT IT WILL PERFORM ADEQUATELY IN THE APPLICATION INDICATED, E. CONSULTANT'S EXPENSES THAT ARE INCURRED DUE TO REVISIONS OR SUBSTITUTIONS REQUESTED BY THE CONTRACTOR OR APPROVED BY THE OWNER SHALL BE COMPENSATED TO THE CONSULTANT BY '.. THE CONTRACTOR. 7. AS -BUILT DRAWINGS: THE CONTRACTOR SHALL MAINTAIN AND PREPARE A COMPLETE AND ACCURATE SET OF AS-BUILTS DURING THE PROJECT AND ISSUE TO THE A/E AND OWNER AT PROJECTCLOSEOUT. DURING THE COURSE OF THE PROJECT, THE CONTRACTOR SHALL ISSUE SKETCHES OR SCALED DRAWINGS FOR FIELD CHANGES THAT ARE PROPOSED OR MADE WHICH'; VARY FROM THE BASIS OF DESIGN, CONSULTANT EXPENSES THAT ARE INCURRED DUE TO SERVICES OR REVISIONS REQUIRED BY BUILDING DEPARTMENT, OWNER, CONTRACTOR, AND MANUFACTURER SHALL BE COMPENSABLE TO THE CONSULTANT BY THE CONTRACTOR.: B. INSTALLATION, TESTING AND BALANCING, START UP, COMMISSIONING. AND PERFORMANCE TROUBLESHOOTING OFSYSTEMS- CONTRACTOR.RECOGNIZES HE IS SOLELY RESPONSIBLE FOR PERFORMANCE AND COMPLETION OF THESE SERVICES AS PART OF THE PROJECT REQUIREMENTS. DURING THE COURSE OF THE PROJECT, THE CONTRACTOR SHALL DOCUMENT THE SERVICES COMPLETED TO THE OWNER AND. A/E. CONSULTANT EXPENSES THAT ARE INCURRED DUE TO SUPPORTING SERVICES OR REVISIONS REQUIRED BY BUILDING DEPARTMENT, OWNER, CONTRACTOR, AND MANUFACTURER SHALL BE COMPENSABLE TO THE CONSULTANT BY THE CONTRACTOR. 9. CONTRACTOR/DELEGATED/SUCCESSOR ENGINEER - CONTRACTOR IS ASSIGNED TO PROVIDE DESIGN/BUILD SERVICED FOR SELECTED SYSTEMS. CONTRACTOR'S ENGINEER SHALL COMPLY WITH ALL FAC 611375 REQUIREMENTS. DELEGATED/SUCCESSOR ENGINEER SHALL SUBMIT SIGNED/SEALED DRAWINGS TO A/E, TO AGENCIES, RESPOND TO ALL RFI'S, AGENCY COMMENTS, AND BECOME THE DESIGNATED. SYSTEM ENGINEER OF RECORD. GENERAL ELECTRICAL NOTES 1. DO NOT SCALE THE. ELECTRICAL DRAWING. REFER TO THE ARCHITECTURAL PLAN AND ELEVATIONS FOR EXACT LOCATION OF ALL EQUIPMENT AND CONFIRM WITH OWNERS REPRESENTATIVES. CONTRACTOR SHALL REFER TO THE ENTIRE SET OF CONTRACT DOCUMENTS FOR PROJECT COORDINATION. 2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE EDITIONS CURRENTLY ADOPTED BY THE LOCAL AUTHORITIES HAVING JURISDICTION OF THE FOLLOWING: THE NATIONAL ELECTRICAL CODE (NFPA 70),. NFPA 72, NFPA 75, THE FIRE PREVENTION CODE INCLUDING NFPA 1 & NFPA 101, NFPA 110, AND THE FEB, AND THE FFPC 3. UNLESS OTHERWISE NOTED, ALL CONDUCTORS SHALL BE COPPER, WITH "THHN" INSULATION FOR SIZE #10 AND SMALLER. CONDUCTORS LARGER THAN #10 SHALL HAVE "THWN" INSULATION. ALL CONDUCTORS IN WET LOCATIONS MUST HAVE "THWN". INSULATION. ALL CONDUCTORS #10 AND SMALLER MAY BE SOLID, ALL CONDUCTORS #8 AND LARGER SHALL BE STRANDED. ALL CONDUCTORS MUST COMPLY WITH ARTICLE 310 OF THE N.E.C. 4. OUTLET BOXES SHALL BE PRESSED STEEL IN DRY LOCATIONS CAST ALLOY WITH THREADED HUBS IN WET LOCATIONS AND SPECIAL ENCLOSURES. FOR OTHER CLASSIFIED AREAS. S. DISCONNECT SWITCHES SHALL BE H.P. RATED, HEAVY DUTY, QUICK MAKE, QUICK BREAK, WITH. ENCLOSURES AS REQUIRED BY EXPOSURE. 6. THESE PLANS DO NOT SHOW EVERY MINOR DETAIL OF CONSTRUCTION, THE CONTRACTOR IS EXPECTED TO FURNISH AND INSTALL ALL ITEMS FOR A COMPLETE ELECTRICAL SYSTEM AND MEET ALL REQUIREMENTS NECESSARY FOR EQUIPMENT TO BE PLACED IN. PROPER WORKING ORDER. 7, THE ELECTRICAL SYSTEM SHALL BE COMPLETELY AND EFFECTIVELY GROUNDED AS REQUIRED IN ARTICLE250, NATIONAL ELECTRICAL CODE. THE GROUNDING SYSTEM'.. SHALL BE TESTED AND SHALL BE PROVIDED TO MEASURE A MAXIMUM OF 5 OHMS. PROVIDE A COPY OF.. THE TEST REPORT TO ENGINEER. & ALL MATERIALS SHALL BE NEW AND SHALL BEAR U.L. LABELS WHERE APPLICABLE. 9. ALL WORK SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR IN A FIRST CLASS WORKMANSHIP MANNER. THE COMPLETE SYSTEM SHALL BE FULLY OPERATIVE AND ACCEPTANCE BY ENGINEER/ARCHITECT MUST BE A CONDITION OF THE SUBCONTRACTOR. W. THE ELECTRICAL INSTALLATION SHALL MEET ALL STANDARD REQUIREMENTS OF POWER, LIGHT COMPANY, TELEPHONE COMPANY, AND BROADBAND PROVIDER. 11 CIRCUITS SHOWN ON PLANS ARE TO DETERMINE LOAD DATA AND PANEL SIZE. THE CONTRACTOR SHALL PROVIDE CIRCUITS TO SUIT JOB CONDITIONS, BALANCE LOADS ON EACH PHASE. 12. SEE NOTES ON PLANS FOR OTHER REQUIREMENTS: 13. FURNISH AND INSTALL LIGHTING FIXTURES AND LAMPS AS CALLED FOR ON PLANS, OR AS SELECTED BY OWNER. 14. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID INTERFERENCE WITH THE PROCESS OF CONSTRUCTION. 15. CORRECTIONS OF ANY DEFECTS SHALL BE COMPLETED WITHOUT ADDITIONAL CHARGE AND SHALL INCLUDE REPLACEMENT OR REPAIR OF ANY PHASE OF THE INSTALLATION WHICH MAY BE DAMAGED. 16. ALL REQUIRED INSURANCE SHALL BE PROVIDED FOR PROTECTION AGAINST PUBLIC LIABILITY OF PROPERTY DAMAGE FOR THE DURATION OF THE WORK. 17.. CHECK ALL EQUIPMENT FOR PROPER VOLTAGE, PHASE, AND CURRENT BEFORE CONNECTION TO CIRCUITS AND START UP. 1 18.. ELECTRICAL CONTRACTOR SHALL CHECK AND. VERIFY EQUIPMENT FURNISHED AGAINST THOSE SPECIFIED OR INTENDED AND REVISE BRANCH CIRCUITS AS MAY BE REQUIRED WITH PRIOR APPROVAL OF ENGINEER/ARCHITECT, 19.. ALL SYSTEMS AND ROUGH -IN SHALL BE CONCEALED IN FINISHED AREAS. COORDINATE WITH ARCHITECT. 20, THE ELECTRICAL PORTION OF THE. CONTRACT DOCUMENTS ARE COORDINATED WITH THE BASIS OF DESIGN EQUIPMENT SPECIFIED BY DIVISION 16 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS. WHERE THE CONTRACTOR'S DECISION TO SUBSTITUTE PRODUCTS OR MODIFY DESIGN REQUIRING A/E SERVICES,. THE A/E RESERVES THE RIGHT TO REQUEST COMPENSATION FROM THE CONTRACTOR FOR SAID SERVICES. 21. CONTRACTOR SHALL PROVIDE A CONTROLS TRADE SUBCONTRACTOR TO. DESIGN AND INSTALL ALL CONTROLS TO MEET THE PROJECT REQUIREMENTS.. AIR CONDITIONING EQUIPMENTAND CONTROLS SPECIFICATION 1 ELECTRICAL CONTRACTOR SHALL INSTALL ALL CONTROL RACEWAY (CONDUIT); WIRE INSTALLATION, CONNECTIONS ETC. IN ACCORDANCE WITH WIRING DIAGRAMS ON AIR EQUIPMENT. 2. A/C / ELECTRICAL PLANS OR DIAGRAMS FURNISHED BY MANUFACTURER OF THE EQUIPMENT, 3, ALL POWER WIRING FOR THE AIR CONDITIONING EQUIPMENT SHALL BE FURNISHED, INSTALLED AND CONNECTED UNDER THIS SECTION OF THE SPECIFICATION. 4. MECHANICAL CONTRACTOR SHALL PROVIDE MOTOR STARTERS FOR ALL AIR CONDITIONING EQUIPMENT,. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONNECTIONS. TO AIR. CONDITIONING EQUIPMENT PER MANUFACTURERS SPECIFICATIONS. 5. AIR CONDITIONING EQUIPMENT INCLUDES CONDENSER, COMPRESSOR AND FAN, FAN COIL UNITS, ELECTRICAL STRIP HEATER, THERMOSTAT, ETC,. UL LISTING AND NRTL CERTIFICATIONS NOTE CONTRACTOR/MANUFACTURER SHALL PROVIDE COMPLETE DOCUMENTATION AND CERTIFICATIONS FOR ANY EQUIPMENT THAT HE PROPOSES WITH A NRTL (NATIONALLY RECOGNIZED TESTING LAB) LISTING NO LABELING EQUIVALENT TO THE BASIS OF DESIGN UL LISTING. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONFIRM ACCEPTABILITY BY THE LOCAL AHJ AND AGENCIES FOR THE NRTL LISTING AND CERTIFICATION FOR THE PRODUCTS HE PROPOSES AND DEMONSTRATE SUCH AS PART OF THE PRODUCT DATA SUBMISSION AND INSTALLATION. WIRING NOTES 1. ABSOLUTELY NO FLEXIBLE CONDUIT IS PERMITTED IN DEMISING WALLS, FLEXIBLE CONDUIT IS PERMITTED FOR SHORT, FINAL CONNECTIONS ONLY W-O" OR LESS). ALL HOME RUNS IN EMT. 2 CABLE TYPES AC AND NM CABLES ARE NOT ACCEPTABLE. TYPE MC CABLE, ELECTRIC METALLIC TUBING (EMT) AND RIGID GALVANIZED CONDUIT ARE PERMITTED. FLEXIBLE CONDUIT IS NOT PERMITTED WITHIN DEMISING WALLS. 3. CONDUIT CONNECTIONS TO TRANSFORMERS, VIBRATING AND/OR ROTATING EQUIPMENT, SHALL BE MADE WITH FLEXIBLE METAL CONDUIT OR "SEALTIGHT.". j 4. TWO OR THREE CONDUCTORS SHARING THE SAME NEUTRAL SHALL HAVE PROTECTION DEVICES WITH TIES. DISCONNECTION SHALL BE ACCOMPLISHED BY A SINGLE MOVEMENT. FLORIDA BUILDING CODE 2017 CONFORMANCE 1 CONTRACTOR TO PROVIDE ALL LABOR AND. MATERIAL TO CONFORM TO FBC 2017 ENERGY COMPLIANCE, RELATED SECTIONS, AND STANDARDS. 2. OWNER SHALL PROVIDE SERVICES OF AN INDEPENDENT COMMISSIONING AGENT(CxA) TO PREPARE FUNCTIONAL TEST PROCEDURES (DOCUMENT SYSTEMS PERFORMANCE'; WITNESS CONTRACTOR TESTING), AS REQUIRED BY FBC FOR LIGHTING AND HVAC SYSTEMS: 3. CONTRACTOR SHALL PROVIDE SERVICES TO TEST, BALANCE AND COMMISSION THE SYSTEM VIA AN INDEPENDENT AGENT FOR THE MECHANICAL SYSTEMS ENERGY PERFORMANCE., 4.. CONTRACTOR TO PROVIDE COMPLETE CERTIFICATIONS AND CHECKLISTS AS REQUIRED BY FBC FOR HIS WORK RESPONSIBILITIES .. GENERAL DEMOLITION NOTES 1. CONTRACTOR TO EXERCISE EXTREME CAUTION WHEN RELOCATING WIRING DEVICES, EQUIPMENT AND LIGHTING FIXTURES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT OTHER WIRING DEVICES, EQUIPMENT, AND LIGHTING FIXTURES THAT MAY. BE CONNECTED ON THE SAMECIRCUIT REMAIN OPERATIONAL AND ACTIVE. 2. INFORMATION SHOWN ON THESE DOCUMENTS ARE DIAGRAMMATIC IN NATURE CONTRACTOR TO FIELD VERIFY ELECTRICAL CIRCUIT HOME RUNS TO ALL ELECTRICAL ITEMS SCHEDULED FOR DEMOLITION AND PERFORM THE WORK AS INTENDED AND DEPICTED ON THE DRAWINGS. 3. UPDATE ALL ELECTRICAL PANEL BOARD DIRECTORIES THAT ARE AFFECTED B THE DEMOLITION AND/OR. RENOVATIONS. DIRECTORIES SHALL BE TYPED. 4. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN, AND PROTECTED AREA. NOTIFY, OWNER WHEN ITEMS ARE READY TO BE REMOVED... 5. COORDINATE ANY. ALTERATION AND CHANGES TO THE ELECTRICAL SERVICE WITH THE LOCAL UTILITY. COMPANY. 6. PRE SCHEDULE ALL POWER INTERRUPTIONS WITH OWNER. GIVE OWNER 48 HOURS NOTICE PRIOR TO DISCONNECTING. POWER TO ANY PORTION OF THE BUILDING AND MAKE. ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL EQUIPMENT AS NEEDED AND REQUESTED BY OWNER 7. CONTRACTOR IS RESPONSIBLE. OF BECOMING FULLY INFORMED AS TO EXISTING CONDITIONS AT THE SITE. NEITHER THE OWNER NOR THE A/E MAKES ANY REPRESENTATION WARRANTY AS TO SITE CONDITIONS. 8. CONTRACTOR: SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE NATURE AND EXTENT OF THE WORK TO BE PERFORMED AND LOCAL CONDITIONS THAT MAY AFFECT THE WoFK. 9. DUE TO REMOVAL OR CORRECTION TO ANY WALLS OR OTHER CONSTRUCTION NECESSITATING CAPPING OF EXISTING ELECTRICAL WIRING DEVICES OR ANY OTHER ELECTRICAL EQUIPMENT INCLUDING RECONNECT OF SUCH EXISTING ITEMS IS CONSIDERED TO BE PART OF THE WORK UNDER THIS CONTRACT. ALL EXISTING OUTLETS SHOWN TO REMAIN WILL REMAIN ACTIVE. THE REWIRING SHALL BE INCLUDED UNDER THIS CONTRACT WITHOUT ADDITIONAL COST TO OWNER. 10. ALL WORK SHALL COMPLY WITH THE LATEST EDITION OF THE FOLLOWING CODES::.. NATIONAL ELECTRICAL CODE (NEC) NATIONAL FIRE PROTECTION AGENCY (NFPA) FLORIDA BUILDING CODE 11. WHERE CONDUIT IS INACCESSIBLE, REMOVE CONDUCTORS AND CUT. BACK CONDUIT FLUSH WITH SLAB OR WALL: PATCH OPENING TO MATCH EXISTING FINISH. WHERE EXISTING WIRING EXTENDS OUTSIDE OF .THE AREA BY NATURE OF THE ORIGINAL INSTALLATION, CONTRACTOR SHALL MOD FY EXISTING WIRING AS REQUIRED TO MAINTAIN CONTINUITY OF EXISTING CIRCUITRY SUCH THAT NO EIUIPMENT TO. REMAIN IS LEFT WITHOUT SERVICE. 12. THE CONTRACTOR IS TO GIVE THE OWNER AN OPPORTUNITY TO ACCEPT ANY ELECTRICAL ITEMS THAT WERE REMOVED FOR THEIR USE. SALVAGED MATERIALS, AND EQUIPMENT THE' OWNER DOES NOT WISH TO KEEP SHALL BECOME THE PROPERTY OF THE CONTRACTOR, AND SHALL B DISPOSED OF BY. THE CONTRACTOR, WITHOUT ADDITIONAL' COST TO THE OWNER, 13, CONTRACTOR SHALL PROVIDE. TEMPORARY POWER AND LIGHTING WHERE RE UIRED DURING DEMOLITION AND CONSTRUCTION SCOPE OF WORK. 14. THE EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE TAKEN FROM OR GINAL DRAWINGS PROVIDED BY THE OWNER AND FIELD INVESTIGATION. THE ACTUAL CONDITION MAY VARY, ALL. EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID, THE CONDITIONS SHON ARE INTENDED TO SHOW THE LOCATIONS OF THE EXISTING EQUIPMENT, AND IN NO WAY RELIEVES THE �CC,C,CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION REQUIRED TO COMPLETE. THE NEW W¢RK. FIELD. CONDITIONS SHALL GOVERN. 15. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHINITHE PROJECT AREA, IT IS INTENDED TO PROVIDE THE CONTRACTOR WITH A GENERAL KNOWLEDGE OF T E EXISTING CONDITIONS. WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT. SHOWN,ON THIS PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. THE CONTRACTOR IS. RESPONSIBLE FOR ALL REQUIRED. DEMOLITION WHETHER SHOWN ON THE PLANS OR NOT. 16, ALL CONDUITS SERVING OTHER SPACES OR FLOORS, THAT RUN THROUGH THE PROJECT. AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION, SO AS NOT TO CAUSE ANY DISRUPTIK N TO THESE OTHER SPACES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL CON UITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED AND PROVIDED WITH BONDING BUSHINGS IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE. 17. THE CONTRACTOR SHALL PHASE DEMOLITION WORK AS REQUIRED OR. DIRECTED BY THE OWNER. 18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR PATCHING ANY'',DAMAGE WHICH MAY OCCUR DURING DEMOLITION ACTIVITIES. REPAIRS TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED, AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTIO , MATERIAL, FIRE RATING, FINISH AND COLOR, 19. ALL WORK. SHALL BE PERFORMED BY A LICENSED ELECTRICAL CONTRACTOR AND SHALL BE COORDINATED WITH OTHER TRADES. VOLTAGE DROP NOTE THE CONTRACTOR, AS PART OF HIS PRICING AND BIDDING, SHALL INCLUDE ALL LABO , MATERIAL, EQUIPMENT. AND TERMINATIONS, INCLUDING FPL AND UTILITY REQUIREMENTS AND APPROVALS F R ALL CONDUCTORING AND TERMINATIONS, TO SATISFY THE PROJECT REQUIREMENTS. IT iS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND INCLUDE ALL HIS BRANCH CIRCUIT, FEEDER, AND SERVICE CONDUCTOR CC NDUITING AND WIRING LENGTHS AND ROUTING BASED ON. HIS PROPOSED INSTALLATION MEANS AND METHO S. WIRING LENGTHS, SHOWN AS THE BASIS OF DESIGN LENGTHS, ARE MERELY AN APPROXIMATION BY. THE CONS LLTANT. THE CONTRACTOR SHALL USE THOSE BASIS OF DESIGN CONDUCTOR LENGTHS AND WIRING SIZES AS THE, MINIMUM NOT LIMITED TO, REQUIREMENTS FOR THE PROJECT BIDDING. THE CONTRACTOR PRIOR TO BIDDING SHALL CONFIRM ALL HIS PROPOSED LENGTHS; MAKE ANY AND ALL ADJUSTMENTS AS MAY IMPACT THE ELECTRICAL SYSTEMS AND EQUIPMENT FOR CODE COMPLIANCE AND CONSTRUCTABILITY; AND DOCUMENT ALL PROPOSED CHANGES AND ADJUSTMENTS TO THE ARCHITECT AS PART OF HIS BID. RESPONSE. THE CONTRACTOR SHALL SUBMIT COMPLETE SCALED PROPOSED ROUTINGS FOR SERVICES AND FEEDERS, QUANTITIES AND CONDUf TORING, SECTIONS THRU BUILDING FOR RACKING, DUCTBANK CROSS SECTIONS FOR CLEARANCES AND COORDIN TED AS. FREE OF ALL INTERFERENCES, ETC. CONTRACTOR SHALL SUBMIT ALL DOCUMENTATION TO THE AR HITECT FOR REVIEW NO. LATER THAN 3 WEEKS AFTER NOTICE TO PROCEED. CLEARANCE NOTE ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED WITH NEC REQUIRED WORKING CLEARANCES. TYPICAL FOR ENTIRE PROJECT. ELECTRICAL SHEET INDEX SHEET# DESCRIPTION EO.1 ELECTRICAL NOTES, LEGEND AND SHEET INDEX E1.1 ELECTRICAL KEY PLAN PLAN & PARTIAL ELECTRICAL RISER FBC NOTE 1. CONTRACTOR SHALL COMPLY WITH FBC (C4082.51): PROVIDE OWNER WITH A RECORD SET DRAWING OF COMPLETE INSTALLATION DRAWINGS 2. CONTRACTOR SHALL COMPLY WITH FBC. 8.2. . C40 PROVIDE OWNER WITH OPERATIONAL MANUALS AND I 0 5 21 MAINTENANCE MANUALS..: FIRE RATING NOTE ALL DEVICES PENETRATING FIRE RATED WALLS SHALL BE PROVIDED WITH U.L. APPROVED FIRE RATED ASSEMBLIES. (EQUAL TO WALL FIRE RATING SEE ARCHITECTURAL DRAWINGS) COORDINATION NOTES CONTRACTOR TO COORDINATE ALL FINAL LOCATIONS, ANY TYPES OF ALL DEVICES, AND EQUIPMENT WITH ARCHITECT PRIOR TO BID AND ROUGH -IN. CONTRACTOR TO COORDINATE VARIOUS TRADES TO AVOID ABOVE CEILING CONFLICTS. EQUIPMENT/FEEDER REMOVAL NOTES SALVAGED MATERIALS EQUIPMENT AND FEEDERST SHALL BE DELIVERED TO THE OWNER A HIS PROPERTY AND STORED WITHIN THE BUILDING WHERE DIRECTED. ANY REMOVED MATERIALS OR EQUIPMENT WHICH THE OWNER DOES NOT WISH TO KEEP SHALL BE DISPOSED OF BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER. SCOPE OF WORK ..THE PROJECT CONSISTS OF AN EXISTING BUILDING. UPGRADING AND RELOCATING ELECTRICAL SYSTEMS - POWER. SCCR NOTE CONTRACTOR AND MANUFACTURER. SHALL PROVIDE ALL ELECTRICAL SYSTEMS FOR ALL EQUIPMENT, INCLUDING MECHANICAL AND PLUMBING EQUIPMENT WITH INTEGRAL DISCONNECTS, INTEGRAL BREAKERS,INTEGRAL MOTOR STARTERS, VFDs, CHILLER PANELS; PACKAGED UNIT PANELS, ETC., SHALL BE RATED WITH A SHORT CIRCUIT CURRENT RATING AT LEAST EQUAL TO THE IMMEDIATE. UPSTREAM ELECTRIC OVERCURRENT PROTECTIVE DEVICE SHORT CIRCUIT RATING, SEALING NOTE ; SEAL ALL CONDUITS EXTERNALLY WITH APPROVED SEALANTS PER ARCHITECTS SPECIFICATIONS, AND INTERNALLY WITH POLYWATER FST PER NEC 225.27, 300.5G, 3003A, 505.150-2. CD ❑ Z m W 7 _ _j m m T P N❑ J ^ ❑ C4 ' ❑ Z M-C4%o a Nmm. Lln -Mn v^NEB* Z m w m 00. O❑ z u N i. a- z N w w V m❑X ° zUOZ Rk C Q P W J J F F N JLjw ] ] w N C R z ul 2 N C]W.a N Q O m a z❑ w J ° a omm°oa13 Y❑ m w a Z N V g w Q J O wJ.0 UI W Z a ❑ W w wrcl-w� t7 ❑F U ZI UIIW p Q � W = L.J 6 W M Q = � LI O CO = oo Iy wamx ear.. 4l 5 j APR 21 2020 REVISION: Permitting Departm# DATE DESCRIPTIONSt, Lucie CiiuntY, f= .00 t` ISSUED FOR PERMIT y' i� _ Il' ` (i 1: € 04-13-20 SAFETY FLORIDA STATUTES: TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THE PLANS AND CIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE %SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH F.B.C. 2017 TION 110.8.4.4 AND CHAPTER 633, FLORIDA STATUTES. PERMIT SET: 04/13/20 PRIOR TO SUBMITTING THE BID, THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND INFORM THE ARCHITECT AND THE ENGINEER OF ANY DISCREPANCY BETWEEN THESE DOCUMENTS AND THE EXISTING CONDITIONS AND SHALL INCLUDE IN THE BID TO CORRECT THE SAME AS DIRECTED. THE ENGINEER AND THE ARCHITECT ARE NOT RESPONSIBLE FOR ANY ADDITIONAL COSTS RESULTING FROM VERIFIABLE EXISTING CONDITIONS DISCOVERED AFTER CONTRACT HAS BEEN AWARDED. NO CHANGES SHALL BE MADE TO THESE PLANS WITHOUT PRIOR APPROVAL FROM THE ENGINEER OF RECORD. ALL CHANGES SHALL BE SUBMITTED FOR REVIEW PRIOR TO INSTALLATION. NOT FOR BID UNTIL PERMIT HAS BEEN ISSUED. DRAWING TITLE: ELECTRICAL NOTES, LEGEND AND SHEET INDEX DATE: 12/19/19 SCALE: AS NOTED DRAWN BY: MM CHECKED`BY: SR PROJECT' NO, 19480 E0.1 r ELECTRICAL SERVICE NOTES I 1. ALL ELECTRICAL SERVICE EQUIPMENT SHALL HAVE MIN A.I.C. RATING OF RATED. LEGEND 65,000 AMPS. ALL EQUIPMENT POWER RISER KEYNOTES: LOCATED ON EXTERIOR Of BUILDING SHALL BE NEMA-3R ( INTERCEPT AND EXTEND AS REQUIRED. 2. ALL ELECTRICAL EQUIPMENT AND WIRE SHALL BE RATTED @ 75°C CONTINUOUS DUTY. — — - EXISTING ( CONTRACTOR TO REMOVE EXISTING CONNECTION 3. PRIOR TO CONSTRUCTION, THE ELECTRICAL CONTRACTOR SHALL FROM THE. TRANSMITTER BUILDING FEEDING THE a) VERIFY ALL EXISTING CONDITIONS IN FIELD NEW OFFICE/STUDIO BUILDING, b) COORDINATE THE ELECTRICAL SERVICE WITH FP&L REP':RESENTATIVE t) NOTIFY THE ENGINEER OF ANY CHANGES REQUIRED TO COMPLETE NEW CONSTRUCTION, X DEMOLITION 03 EXISTING 200A SERVICE TO BE ABANDONED. 4. ALL ELECTRICAL EQUIPMENT SHALL BE FIELD MARKED: TO WARN Of POTENTIAL ELECTRICAL ARC FLASH O CONTRACTOR TO VERIFY EXISTING PANEL HAZARDS, THE MARKING SHALL BE LOCATED SO AS TO BE CLEARLY VISIBLE BEFORE ANY EXAMINATION, AMPERAGE IS.200A, UPGRADE IF NECESSARY. ADJUSTMENT, SERVICING, OR MAINTENANCE OF THE EQUIPMENT. - 5. EACH DISCONNECT: SHALL BE LEGI8LY MARKED TO INDICATE THE UNIT IT IS FEEDING THE MARKING SHALL BE OF SUFFICIENT. DURABILITY TO WITHSTAND THE ENVIRONMENT INVOLVED. FEEDER SIZE KEY NOTES F) 1 A EXISTING 3# 3/0, 6 GND THWN CU IN 2-1/2" CONDUIT MIT). 1 B 3 # 3/0, 6 GND; THWN CU IN 2-1/2" CONDUIT (MATCH EXISTING - V.LF). (MAX DISTANCE FOR 2% VOLTAGE DROP =115' - TOTAL EXISTING AND NEW) 3 1 #2 CU GND 4 -3 # 3/0 THWN CU IN 2-1/2" (MAX DISTANCE FOR 2% VOLTAGE DROP =135 ) EXISTING FEEDERS. NOTE: THE GC SHALL COORDINATE EXACT PLACEMENT OF NEW ELECTRICAL SERVICE EQUIPMENT WITH EXISTING LANDSCAPING TO MAINTAIN REQUIRED CLEARANCES. FIELD VERIFY. OFFICE/STUDIO BUILDING 1 I S P D -1- i IL - I I I M II I 200 I 100KA I L_O 2P 200 I I 200 _IEXISTIN(6 1 I O 2P 200 1 PANEL I INEMA3RI CLASS 1 i 3 I NEMA3R L/RKJ FUSE' I (V.LF) O 100K AIC 1 6 1 MAIN SERVICE 1 GROUND BUS 4 1 1 ' WITH #2 CU TO LV SYSTEM; INTERSYSTEM BOND. COORDINATE �_ I 1 u'& TO EXISTING FPL TRANFORMER TO EXISTING FPL TRANFORMER -_STATION ENGINEER FOR BONDING AND GROUNDING REQUIREMENTS ___� 3 120/208V;3�,4W (V.I:F) Z— 120I208V,1�,3W (V.I:F1 i APR`212020 Perrr�itrl y " 9r S• F �Jt BOND TO EXISTING LJrlc C.W P & FOOTER STEEL RISER PROPOSED PARTIAL ELECTRICAL RISER NO. 1 NOT TO SCALE NOTE: CONTRACTOR SHALL PROVIDE THE TAP CONDUCTORING FOR THE OUTBOARD SPD AS NEUTRAL BUS SPD N OA OB 0C G RECOMMENDED BYTHE FUSIBLESWITCH MANUFACTURER TO RETAIN THE SWITCH NRTL INCOMING FEEDER --- CERTIFICATION AND ACCOMPLISHED INACODE - COMPLIANTMANNER.CONTRACTORSHALL - CONSULTTHEMANUFACTURERANDOBTAINHIS SAFETY GROUND DOCUMENTED SPECIFICATIONS AND INSTALLATION GUIDANCEPRIORTO ANY FABRICATION. SUBMITTOTHEA/EAND AHJ. TRANSIENT GROUND o MAIN BREAKER NEUTRAL CIRCUIT BREAKER SIZED PER PHASE A' SPD MANUFACTURER'S REQUIREMENTS. IF A CIRCUIT -- BREAKER IS NOT AVAILABLE, PHASE 'B' PROVIDE THE SPD WITH AN INTERNAL FUSED DISCONNECT. PHASE 'C' 1 y GROUND BAR (NOTE 3) PANEL .NIPPLE NOTES:. 1, ALL WIRING AND PHYSICAL SPACE SHALL BE PER SPD MANUFACTURER'S REQUIREMENTS.. 2, ALLOW ADEQUATE SPACE NEXT TO PANEL TO MOUNT THE SPD UNIT, 3. PROVIDE CONNECTION TO EQUIPMENT GROUND BAR AND CHASSIS, 4. WIRE LENGTH SHOULD BE AS SHORT AND STRAIGHT AS POSSIBLE WITH SPD UNIT ADJACENT TO THE CIRCUIT BREAKER TO WHICH ITIS CONNECTED; THE SOURCE BREAKER FEEDS END OF PANEL IN FIRST AVAILABLE POSITION AS CLOSE AS POSSIBLE TO NEUTRAL BAR. SPD CONNECTION I IVOTTO 3-PH DETAIL II SCALE SPD REQUIREMENTS AND SPECIFICATIONS SPD BASIS OF DESIGN MANUFACTURER IS: POWER SYSTEM INNOVATION CORPORATED (PSI); APPROVED MANUFACTURERS ARE: JOSLYN, PSI,. CURRENT: TECHNOLOGY, SQ-D, AND ACT COMMUNICATIONS, MUST COMPLY WITH U.L: 1449, 3RD OR CURRENT ADDITION AND MUST BE RATED PER MODE. ALL MAINS -. 200 kA, DISTRIBUTION 100kA, BRANCH 50kA, (ALL MODE PROTECTION). - CONTRACTOR MUST CONTACT SPD MANUFACTURER PRIOR TO START OF THE PROJECT AND OBTAIN ALL REQUIREMENTS. VENDOR MAY ADD TO AND/OR DELETE FROM, THE NOTED EQUIPMENT SHOWN ON THE PLANS.. CONTRACTOR MUST FULLY COMPLY WITH VENDOR REQUIREMENTS AND RECOMMENDATIONS. CONTRACTOR SHALL OBTAIN A SEPARATE PRICE FROM VENDOR AND SHALL INCLUDE IT IN THE BID, CONTRACTOR SHALL OBTAIN SERVICES OF A QUALIFIED AGENCY .TOMEASURE, VERIFY,. AND CERTIFY THE GROUND SYSTEM. PROVIDE REPORT TO OWNER AND ARCHITECT REQUIRED CLEARANCE AS PER DISCONNEC IS v Lr.l THE N.E.C. ELECTRICAL KEY PLAN N.T.S 'S KNOWLEDGEGINEER FIRE SAFETY FLORIDA STATUTES. TO THE BEST OF THE ENGINEER'S , THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH F.B.C. 2017 SECTION 110.8.4.4 AND CHAPTER 633, FLORIDA STATUTES. PERMIT SET: 04/13/20 PRIOR TO SUBMITTING THE BID` THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND INFORM THE ARCHITECT AND THE ENGINEER OF ANY DISCREPANCY BETWEEN THESE DOCUMENTS AND THE EXISTING CONDITIONS ANO SHALL INCLUDE IN THE BID TO CORRECT THE SAME AS DIRECTED. THE ENGINEER AND THE ARCHITECT, ARE NOT RESPONSIBLE FOR ANY ADDITIONAL COSTS RESULTING FROM VERIFIABLE EXISTING CONDITIONS DISCOVERED APTEIR CONTRACT HAS BEEN AWARDED. NO CHANGES SHALL BE MADE TO THESE PLANS WITHOUT PRIOR APPROVAL FROM THE ENGINEER OF RECORD. ALL CHANGES SHALL RE SUBMITTED FOR REVIEW PRIOR TO INSTALLATION. NOT FOR BID UNTIL PERMIT HAS BEEN ISSUED. 0 C7 � Z m m a EWEF— m cp N ° z �oNa° N �D R Nm m to VN 4I m ^ .��� Z N M, m m❑ m O m Q W w W 0 V m° X a i° °.i 4 F U J J W ❑E3 NJW I- J W m m Wad. O.. m I N F wow w ❑ z W < - U W�<_ Z Z Z g � in F a ❑ W J yN W Z E ❑ WW wrcrw m °,-U7mmW ® J 'y W = LLi M Q � � I-L ® O = a` L` W KEV1510N: # DATE DESCRIPTION A ISSUED FOR PEKMIT: 04-13-20 DKAWING TITLE: ELECTRICAL KEY PLAN AND PARTIAL ELECTRICAL RISER DATE: 12/19/19 SCALE: AS NOTED DKAWN BY: MM Gi1ECKED BY: SR PROJECT NO. 19480 Ell