Loading...
HomeMy WebLinkAboutProposal or ContractPROPOSAUCONTRACT WILCO CONSTRUCTION INC. 10751 ORANGE AVE FT. PIERCE, FL 34945 PH 772-460-6928 FAX 772-460-6929 SCC #131151026 PROPOSAL SUBMITTED TO: SALLY COUSWO 10701 S OCEAN DR LOT 714 JENSEN BEACH. FL 34957 PHI1772-341.8296 EMAILSMCOUSINO@COMCAST.NET WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: BATTER PILE AND SLA CONCRETE SEAWALL VENTURE III LOT 714 1. FURNISH AND INSTALL UP TO 11 L FT OF BATTER PILE AND SLAB TYPE CONCRETE SEAWALL 2. EXISTING WALL AND COMPONENTS TO REMAIN 3. NEW PANELS TO BE 10 X 12 X 8" WITH ifs REBAR SET AT 1' +/- ON CENTER EACH WAY (CAST ON SITE) 4. NEW TOP CAP TO BE 14" X 28" WITH 5 PCS 05 REBAR CONTINUOUS AND $13 TIES SET AT 2' +I- ON CENTER 5. PILINGS TO BE 12" X 12" PRESTRESSED CONCRETE X UP TO 20' LONG AND DRIVEN VERTICAL AT EACH PANEL SEAM AND BATTERED (ANGLED 4 TO 1 +l-) AT MID PANEL (THIS WILL TIE WALL BACK - IN LIEU OF UPLAND ANCHORS) 6. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO A MINIMUM CAPACITY OF 5 TONS EACH A. WALL COST- 9500.08 PER L FT. I i NOTES: 1. WILCO CONSTRUCTION CARRIES U.S.L. S H WORKERS COMPENSATION INSURANCE AS PER FEDERAL REGULATIONS FOR MARINE CONSTRUCTION 2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED 3. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPEISOD, ADDITIONAL FILL DIRT COSTS, ROCK AND/OR HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION, DOCK WORK, DREDGING, AND/OR HANDRAILS 4. ROCK AND/OR HARD SUBSTRATE IF ENCOUNTERED REQUIRING REMOVAL THEN EXTRA CHARGES (AT COST) WILL APPLY 5. IN THE EVENT THAN EXCESSIVE DEBRIS (WOOD, CONCRETE, TREES, ETC) ARE UNEARTHED REQUIRING DISPOSAL THEN ADDITIONAL FEES WILL APPLY (DISPOSAL COSTS) 6. WATER SUPPLY REQUIRED 7. FLOWABLE FILL BEHIND OLD WALL IF REQUESTED/REQUIRED EXTRA B. PROPERTY MARKERS TO BE PROVIDED BY OWNER PRIOR TO COMMENCEMENT OF WORK 9. EMPTY LOT WITHIN COMMUNITY REQUIRED FOR CASTING OF CONCRETE PANELS ANDIOR LOADING - UNLOADING OF REQUIRED MATERIALS (TO BE OBTAINEDINEGOTIATED BY OWNER PRIOR TO OUR ARRIVALfCOMMENCEMENT OF WORK) 10. ASSOCIATION APPROVALS FOR WORK TO BE PERFORMED TO BE OBTAINED PRIOR TO OUR ARRIVALICOMMENCEMENT OF WORK PAYMENTS AS FOLLOWS: 5 % OF CONTRACT UPON SIGNING, 25 % OF CONTRACT 2 WKS -/- PRIOR TO COMMENCEMENT OF WORTS 25% OF CONTRACT UPON PANELS CAST, 25%OF CONTRACT UPON PANELS IN PLACEAND BALANCE UPON.TOP CAP IN PLACE AND CLEANUP DATE AUTHORIZED SIGNATURE: i 1/29/2020 Ir��1lT1�? �� RON EVERLY PROPOSAL/CONTRACT AND UNDERSTAND ITS TERMS AND CONDITIONS AND ACCIEPT THE SAME INCLUDING THOSE ON THIS FORM. WILCO IS AUTHORIZED TO DO THE WORK SPECIFIED IN THE CONTRACT ONLY. PAYMENT MADE AS STATED ABOVE ALL INVOICES ARE PART OF THIS PROPOSALICONTRACT. DATE: .1I3�:z r�6 PAGE OF