HomeMy WebLinkAboutProposalk
PROPOSALICONTRACT
WILCO CONSTRUCTION INC.
10751 ORANGE AVE
FT. PIERCE, FL 34945
PH 772-460-6928 FAX 772-460-6929
SCC # 131151026
W W W.WILCOMARINECONSTRUCTION.COM
PROPOSAL SUBMITTED TO: DESCRIPTION OF JOB:
KATHY PAPARONE REPLACEMENT WOODEN DOCK
81 AQUA RA DRIVE WITH NEW ADDITION
JENSEN BEACH, FL 34957
(609)457-7674
ENTAIL: kathvoaoarone(dhotmall.com
_ WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR:
1. FURNISH AND INSTALL:1 PC UP TO 468 SO FT WOODEN DOCK, 5 FT WIDE X 8 FT LONG APPROACH, 4FT X 8 FT LONG LOWER DOCK
ACCESS, 18 FT WIDE X 22 FT LONG TERMINAL END
2. MATERIALS TO BE 8 "DIA.X (OF UP TO) 20 FT LONG, 2.5 CCA MARINE TREATED TIMBER PILINGS, .60 MIN. TREATED PINE STRINGER;
(2" X 8" CROSS STRINGERS, 2" X 8" RUNNING STRINGERS), (2" X6")TROPICAL 91 DECKING, ALL FASTENERS TO BE
304 STAINLESS STEEL HARDWARE (5/8" ALL THREADED BOLTS, 112" LAG BOLTS AND 010 X 3" DECKING SCREWS)
3. UP TO 12 PCS OF 20 FT LONG, 4 PCS OF 30 FT LONG PILINGS INCLUDED- LONGER/ADDITIONAL(I_F REQUIRED) EXTRA
4. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO PROPER CAPACITIES
5. ALL NEW PIUNG TO BE POLY VINYL WRAPPED IN THE TIDAL RANGE- INCLUDED
6. FOUR PILING TO BE LEFT AT 8 FT ABOVE DECK ELEVATION FOR FUTURE TIKI HUT ROOF (ROOF BY OTHERS) POSITION: T.B.D.
6. DEMOLITION AND DISPOSAL OF EXISTING DOCK AND PILING - INCLUDED
COST: $20 888.00
NOTES:
1. WILCO CONSTRUCTION CARRIES U.S.L. 8 H WORKERS COMPENSATION INSURANCE AS PER FEDERAL REGULATIONS FOR
MARINE CONSTRUCTION
2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED
3. PERMITS.P'rAHS,EItGIHEEBING AND ALL ASSOCIATED COSTS APPLIED OP CISTv',IOED L`Y149LC0 CiJi-0S-i F:UL"i lOid 11 !C ln'ILL SE
PAID BY THE CUSTOi•BER AE h4! ELCTRs. COST
4. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPEISOD, ADDITIONAL FILL DIRT COSTS, ROCK AND10R
HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION, DREDGING, HANDRAILS
AND/OR ANY OTHER WORK, NOT STATED ABOVE
5. ROCK AND/OR HARD SUBSTRATE BREAKING/PUNCHING - IF REQUIRED TO INSTALL PILINGS EXTRA
6. PRICE BASED ON EQUIPMENT IN THE IMMEDIATE AREA
7. WATER SUPPLY REQUIRED
0. ALL PROPOSAL PRICE QUOTES ARE VAUD FOR 30 DAYS, UNLESS OTHERWISE NOTED,
PAYMENTS AS FOLLOWS: 55A OF CONTRACT UPON SIGNING, 30 % OF CONTRACT 2 WKS +/- PRIOR TO COMMENCEMENT OF WORK,
30%OF CONTRACT UPON PILINGS IN PLACE, 30% OF CONTRACT UPON DECKING IN PLACE AND BALANCE UPON FINAL INSPECTIONICLEAN UP
DATE: OCT. 30. tors AUTHORIZED SIGNATURE
John Hudson
I HAVE READ THIS PROPOSAUCONTRACT AND UNDERSTAND ITS TERMS AND CONDITIONS AND ACCEPT THE SAME INCLUDING THOSE ON THE
REVERSE SIDE OF THIS FORM. WILCO IS AUTHORIZED TO DO THE WORK SPECIFIED IN THE CONTRACT ONLY. PAYMENT MADE AS STATED
ABOVE. ALL INVOICES ARE PART OF THIS PROPOSAUCONTRACT.
DATE: 1 1 k-A SIGNATURE: `v \