HomeMy WebLinkAboutCertificate of Termite TreatmentPlanning &Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION. SOIL TREATMENT
PERMIT #:SLC2001-0573 JOB ADDRESS: 5096 Margaret Ann Lane
BUILDER/CONTRACTOR: Design Concrete
PEST CONTROL CONTRACTOR: Patrick Exterminating
PEST CONTROL LICENSE #: 4684
We, the undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Square feet if area treated: 30
Percentage of solution: .25
Date of Treatment: 3 11� —
Footing
le Treatment
Re -Treat
—Driveway
V` Treatment
Re -Treat
x Other Carport footers
1� Treatment
^Re -Treat
Chemicals used: Cypermethrin
Total gallons used:
3
Time of Treatment: 3/11/202Q @11:00
,Slab
1" Treatment
Re -Treat
Pools
Is'Treatment
Re -Treat
Per et or Final Inspection
� t 0" F�/l1/2020
Signature of Exterminator Date
Note: There must be a completed form for each required treatment orre-treatment and this form must be on the Job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged.
FBC104.2.6 Cerb'fieate of Protective Treatment for prevenb'on of termites, A weather rasfstant jdbsite posting board
shall be provided to receive duplicate Treatment Certfrcates as each. required protective treatment is completed,
providing a copy for the person the permit is issued to and another copy for the bulldl#ig permit flies The Treatment
celtlAcate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentrab'onand number of gallan.5 used, to establish a veritable record of
protective treatment. if the soil chemical barrier method for termite prevention is used, final exterior+ treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
uP1ri..d