Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract
2 1 -1 DocuSlgn Envelope ID: 14A13808-8AO5 , y,8FD0-0CAD350445E9 I ' r o13 S U N PRNN SOLAR ENERGY SPECIALISTS CONTRACT PHOTOVOLTAIC ARRAY INSTALLAMON Date: 1/30/2020 Carl Palmer This Contract r0onhac") is hereby entered into by and between Carl Palmer (herelr f collectively referred to as "Owner), and Marc Jones Construction Ll-C, doing business as Sunpm Solar (Heremaf- ter referred to as `6unj ro".), 8937 champions Way Job Address Port St Lucie r FL (Cr7y) (State) We, Owners, hereby contract with Sunpm, for the following described work, and authorize Sunpro to fumM all necessary material, labor and workmanship to install, construct, and place improvements accordmg to the specifications, terms and conditions hereinafter described, aVon our residence. This contract document represent the entire agreemerd of both parties and supersedes any prior oral or written agreement. Any changes to this Contract must be approved by Sunpro in writing. Both parties agree that no verbal agreements will be recognized SCOPE OF WORK Instafi a photovoltaic solar system (the`System)at the Owner's residence comprised of the following components; Major System Components Photovoltaic Panels Qty- 40 Model: LG 335 Inverters Qty— 40 Model: Enphase IQ7 the purchase of any Enphase microinverter vmll include the installation of the Envoy energy management system with lifetime free online monitoring access provided by Enphase. Racking and Mounting Equipment Unnac Solar Mount rail system with PV Qutctmnount fleshing system Initialed by OwneE Contracto S Sunmo Solar 655450-1012 v gownproxorn DocuSign Envelope ID:14A13B08-8A05-< 3FDo-OCAD350445E9 w' p Solar Array Installation � ���•'� DUTIES OF SUNPRO - Sunpro shall obtain all county and city permits necessary for the system to be installed. - Furnish current general liability and workers compensation insurance Upon request . install System to comply with all applicable codes and wind zone requirements, including 180 mph wind zone- - Sunpro shall remove all construction debris and leave the project in a broom clean condiifion. - Once homeowner has paid in full, Sunpro will issue all product & labor warranties and a power production guarantee to the Owner based on shade analysis performed at the time of the system installation. Sunpro will also complete the Monitoring system if applicable and va assist the Owner with entering into an Interconnect Agreement between Owner and the applicable utility company. OWNER -The Owner veil have no control over or charge of installation means, methods, techniques, sequences, procedures, or for safety precautions and programs in connection with the installation of the System, since these are solely Surip ids responsibility. -Owner is responsible for obtaining any approvals necessary from then Homeowners Association. -Owner wn1) provide access point for Enphase envoy to connect to home in lemet service through a wired connection. This is typically done through the homes muter. Owner will provide WiFI internet access to take advantage of Enphase's monitoring system- - Owner recognizes that Sunpro Solar is not qualified to offer any tax or legal advice. Owner should consult with a CPA or a qualified tax advisor to ensure owner receives any local, slate or federal incentives that fray be available- - Owner acknowledges that the federal incentive for costs associated with qualified solar property is in the form of a nonrefundable TAX CREDIT QINKNOWN CONDITIONS 2d3 Sunpro is not responsible for conditions that are encountered at the installation site which are concealed physical conditions or unknown physical conditions of an unusual mire, which caller naturally from those ordinarily found to exist Sunpro is not responsible for existing electrical service deficiencies that mayor may not be code compliant Existing electrical service components, i ncudmg but not limited to, breaker boxes/panels, disconnects, meters, fuse boxes, wiring, conduit and all other necessary components to energize an existing structure are not the responsibility of Sunpro. At the sole discretion of Sunpro. Sunpro may cancel this Contract due to n any conditions encountered that impact the performance, installation or code requirements of the System's installation, or iiany other conditions that impact the safe and effective installation of the System. ARBITRATION AND LEGAL Any controversy or claim arising out of or relating to this Contract, or the breach thereof, shall be settled by arbitration administered by the American Arbitration Association under its Construction Industry Arbitration Rules, and judgment on the award rendered by the arb-i rator(s) may be entered in any court having jurisdiction thereof. in the event of any arbitration or litigation relating to this Contract, the prevallmg party shall be entitled to reasonable attorney fees, costs and expenses If any amounts due tinder this contract are not paid when due, any such unpaid balances shall be charged irderesi at the rate of 1112 % per month which is an annual percentage rate (APR) of 18 `.b per year. CLASSACTION WAIVER Arbitrahon shall proceed solely on an individual basis without the right for any Claims to be arbitrated on a class action basis or on bases involving Damns brought in a purported representative capacity on behalf of other: The arbitrator's authority to resolve and make written awards is limited to Claims between Owner and Sunpro alone. Claims may not be joined or consolidated unless agreed to in writing by all parties. Initialed by.Owm IL Con r Si' SunproSolar 866450-1012 w .gmnproxom DocuSign Envelope ID: 14A13B08-8A05- BFDO-OCAD350445E9 Solar Array Installation PAYMENTTERMS Total Contract Price: $ Rebate: CustomerFinal Price: $ Contract is contingent upon Owners approval for financing: © YES FnancePartner. Dividend Loan Years: 20 Years i SUNPR souae�u,�rss 50,499.00 6,000.00 44,499.00 ❑ NO Loan Interest Rate: 4_99 CASH TEAMS Draw 1: Initial down payment at contract signing $ 0.00 Draw 2: 2nd Payment upon start of work $ 0.00 Draw 3: 3rd Payment upon completion of work* (_��a): $ 0.00 3013 *Foal payment for the solar energy system is due immediately upon passing of inspection and before utility tie-in. Contract Contingencies: You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction_ See the attached notice of cancellation form for an explanation of this righL �D..V° `by. 1/30/2020 C'--. Ira AAGDYt Samantha Moore Sunpm Agent Print ature Carl Palmer Print Name Owner's Signature Print Name Sunpra Solar 885-450-1012 w .gosunpro:cam Date 1/30/2020 Date Date License AL#06642, AZ #323436, AA #M9555, FL#ECt3DD1242, LAW49417, MS 92i374, NM 9395254. Nc #0-32923, OK #1865Q.