Loading...
HomeMy WebLinkAboutRevision Form LOT 1 OFFICE USE ONLY: DATE FILED: _____________________________ PERMIT # _______________________________ REVISION FEE: ___________________________ RECEIPT # ______________________________ ______________________________________________________________________________________________ PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982-5652 (772) 462-1553 APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION LOCATION/SITE ADDRESS: ___________________________________________________________________________________ ___________________________________________________________________________________ DETAILED DESCRIPTION OF PROJECT REVISIONS: ___________________________________________________________________________________ ___________________________________________________________________________________ CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: ______________________ ST. LUCIE CO CERT. #: ____________ BUSINESS NAME: _________________________________________________________________ QUALIFIERS NAME: ________________________________________________________________ ADDRESS: _______________________________________________________________________ CITY: _______________________ STATE: _______________ ZIP: _______________________ PHONE (DAYTIME): ________________________ FAX: _____________________________ OWNER/BUILDER INFORMATION: NAME: ____________________________________________________________________________ ADDRESS:__________________________________________________________________________ CITY: _____________________________ STATE: __________ ZIP: __________________ PHONE (DAYTIME: ___________________________ FAX: _____________________________ ARCHITECT/ENGINEER INFORMATION: NAME: ____________________________________________________________________________ ADDRESS: _________________________________________________________________________ CITY: _____________________________ STATE: ____________ ZIP: ___________________ PHONE (DAYTIME): ___________________________ FAX: ____________________________ SLCCC: 9/23/09 Revised 06/30/17 64 ' - 1 0 " 16 ' - 2 " 1' - 0 " 6' - 0 " AHU 1 WH ACCU #1 STORAGE 9' Clg 12'-8" x 11'-2" GARAGE 12'-10" Clg 49'-4" x 38'-10" BONUS STORAGE ROOM 9' Clg 33'-6" x 14'- 10" LOBBY Volume Clg 20'-10" x 15' ELEVATOR MECH 1 9' Clg UP ACCU #2 73'-0" 2'-8"50'-8"16'-0" 69'-4" 44'-0"20'-4" 1'-0" 6'-0" 8"4'-8"8" 7'-10"4"7'-6"1'-0"2'-0" 64 ' - 1 0 " 41 ' - 1 0 " 23 ' - 0 " 13 ' - 4 " 23 ' - 6 " 1' - 0 " 21 ' - 4 " 8" 5'-2"14'-6" 33'-6"8" 4'-0" 15'-9"23'-9" 1'-4"32'-10"1'-4"14'-6"8" 2'-8"8"4'-0"8'-4"3'-10"20'-6"1'-0"4'-4" 8" 14 ' - 1 0 " 8" 2' - 8 " 4" 1' - 0 " 10 ' - 0 " 1' - 0 " 10 ' - 4 " 8" 7'-4" 27 ' - 4 " 8" 10 ' - 3 " 11 " 3' - 1 0 " 8" 8' - 4 " 18 ' - 4 " 8" 9' - 1 0 " 16 ' - 0 " 1' - 6 " 8" 5' - 0 " 8" 8" 14 ' - 1 0 " 2' - 6 " 3' - 6 " 5' - 2 " 4" 5' - 8 " 3' - 1 0 " 3'-8" 16'-0"3'-8" 4" 7" 7" 001 003 002 007 010 009 012 013 008 2 1 7 6 210 8" 209 1 2 3 4 5 10 11 12 13 14 15 16 17 LOWER STAIR DETAILS 11'-0" FLOOR TO FLOOR 19 RISERS @ 6.95" EACH 11" TREADS w/ 1" BULLNOSE 21'-4" 2'-2"18'-2" 1'-0" POOL ABOVE NON-HABITABLE AREA BELOW ELEVATED DECK 004 005 ELEV EQUIP RE-CIR PUMP 4'-6" POOL EQUIP cen vac 4"8" 2'-4"1'-0"4'-0" 4" 3 4 006 46 " UP ACCU #3 AHU 2 4'-10"7' - 1 0 " CHASE ABV 4" 011 014 015 STORAGE 9' Clg POOL STORAGE 9' Clg 3" 4"4'-2"4'-4" 4' - 1 0 " 3' - 4 " 4" 6' - 4 " 8" 10 ' - 1 0 " 4" 5' - 0 " 206 31'-0" 6.5" 6.5" 6.5" 6.5" 6.5" 6.5" 6.5" 6" 9 13121110 8 7 6 5 4 3 2 1 4'-0"12'-0" 4' - 0 " 8' - 0 " 3' - 8 " 7" 7" 7" 7"9' - 8 " NOTE: EQUIP. TO BE ELEVATED ON PEDESTALS/STANDS ABOVE DFE (DESIGN FLOOD ELEVATION) OF NAVD 16.4 NOTE: EQUIP. TO BE ELEVATED ON PEDESTALS/STANDS ABOVE DFE (DESIGN FLOOD ELEVATION) OF NAVD 16.4 6' - 8 " 8" 4' - 8 " 4' - 4 " 1' - 2 " 26 ' - 8 " 8" 4'-4"6'-0"14'-6"8"16'-10" 3'-10"4" 016 4" COATS 9' Clg 4' - 8 " 3' - 3 " 4' - 2 " 1' - 4 " 4' - 2 " 3' - 3 " BALCONY GUARD 214 214 214 214 214 214 214 214 214 215 1 DRIP DRY 1 NOTE: INTERIOR FRAMED WALLS ON THIS LEVEL TO BE CONSTRUCTED PER D3 ON SHEET A801 FOR BREAKAWAY CONSTRUCTION 1 216 216 214 1 1 214 214 3 3 200 SERIES KEYNOTES MIRROR200 - BUILT-IN CABINETRY201 - TEMPERED GLASS SHOWER ENCLOSURE 202 - .. 203 - OPEN SHELVES 204 - CUSTOM CLOSET INTERIOR 205 - 206 - 207 - CURB FOR SHOWER 208 - ADJACENT WALLS TO HAVE MIN R-11 INSUL & MIN 1/2" GYP BD ON GARAGE SIDE FOR GARAGE SEPARATION 209 - T.S. COLUMN IN WALL211 - MIN 5/8" TYPE 'X' GYP BD FOR GARAGE CLG BELOW HABITABLE ROOMS 210 - 212 - 213 - 214 - TROUGH FOR POOL INFINITY EDGE DRAPERY POCKET T.S. COLUMN IN DECORATIVE COL/POST 42" HIGH CMU WALL 8"x16" ENGINEERED SMART FLOOD VENT PROVIDING 200 SF OF FLOOD COVERAGE 215 -MIN R-20 SPRAY APPLIED OPEN CELLED FOAM INSULATION AT GARAGE CEILING 1 216 -16"x8" WALL LOUVER FOR FLOOD VENTING THRU INTERIOR SPACES BOT OF VENT @ 8" A.F.F. DETAIL AREA CALCULATION 1) 1ST FLOOR LIVING 2) 2ND FLOOR LIVING 3) LOBBY BALCONY 1 BALCONY 2 BONUS STORAGE COVERED ENTRY GARAGE OUTDOOR LIVING 2585 SF 1263 SF 390 SF 82 SF 200 SF 699 SF 68 SF 1877 SF 356 SF 7520 SF LIVING AREA CALCULATION 1) 1ST FLOOR LIVING 2) 2ND FLOOR LIVING 3) LOBBY 2585 SF 1263 SF 390 SF 4238 SF GARAGE LEVEL WINDOW SCHEDULE MARK WD HGT SIZE TYPE ELEV HEAD HT NOTES GARAGE LEVEL DOOR SCHEDULE MARK WD HGT SIZE TYPE NOTES FLOOD VENT CALCULATION 8"x16" ENGINEERED FLOOD VENTS THAT PROVIDE 200 SF OF FLOOD COVERAGE GARAGE 1877 SF/200 = 9.3 = 10 VENTS LOBBY & STORAGE AREAS 1089 SF/200 = 5.4 = 6 VENTS BELOW POOL DECK AREA 1066 SF/200 = 5.3 = 6 VENTS THE DESIGN OF THE FLOOD VENT OPENINGS WILL PROVIDE FOR EQUALIZATION OF HYDROSTATIC FLOOD FORCES ON EXTERIOR WALLS BY ALLOWING FOR THE AUTOMATIC ENTRY AND EXIT OF FLOODWATERS AS SPECIFIED IN SECTION 2.7.2.2 OF ASCE 24. PER FBC R322.2.2 FOOT NOTE 2.1 THE BOTTOM OF EACH OPENING SHALL BE NOT MORE THAN 1 FOOT ABOVE THE HIGHER OF THE FINAL INTERIOR FLOOR AND THE FINISHED EXTERIOR GRADE IMMEDIATELY BELOW THE OPENING NOTE: DESIGN FLOOD ELEVATION IS AT 16.4 NAVD. PER FBC R322.1.8 BUILDING MATERIALS AND INSTALLATION METHODS USED FOR FLOORING & INTERIOR AND EXTERIOR WALLS AND WALL COVERINGS BELOW THE DESIGN FLOOD ELEVATION (DFE) SHALL BE FLOOD DAMAGE RESISTANT MATERIALS THAT CONFORM TO THE PROVISIONS OF FEMA TB-2. MECHANICAL, ELECTRICAL, & PLUMBING SYSTEMS BELOW DFE ARE TO BE DESIGNED & INSTALLED TO PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC LOADS AND STRESSES PER FBC R322.1.6 PER ASCE 24-05 ELEVATOR COMPONENTS LOCATED BELOW THE DFE SHOULD BE CONSTRUCTED OF FLOOD DAMAGE-RESISTANT MATERIALS AND DESIGNED TO RESIST PHYSICAL DAMAGE DURING FLOODING. IF AN ELEVATOR CAB PROVIDES ACCESS TO AREAS BELOW THE DFE IT MUST BE EQUIPPED WITH CONTROLS THAT PREVENT THE CAB FROM DESCENDING INTO FLOODWATERS 1 AC Q U A V I S T A L O T # 1 VE N E T I A N A D M I N I S T R A T I O N L L C 4. 2 0 . 2 0 2 0 ob No. 1802011 IBO GS 4.17.2018 ENG REV'S GS 8.6.2018 1 1st Bldg Comments GS 3.1.2019 2 As built roofing GS 4.20.2020 A200GARAGE LEVEL PLAN SCALE: 1/4" = 1'-0" WPGF GF 4-WAY WALL SWITCH DIMMER WALL SWITCH PUSH BUTTON SWITCH WEATHER PROOF GFCI OUTLET G.F.C.I. PROTECTED OUTLET DUPLEX OUTLET - HALF SWITCHED DUPLEX FLOOR OUTLET 3-WAY WALL SWITCH WALL SWITCH D ELECTRIC METER ELECTRIC PANEL 220 VOLT RECEPTACLE DUPLEX OUTLET DISCONNECT CENTRAL VAC. HOSE OUTLET PULL CORD FIXTUREPC KEYPAD THERMOSTAT INTERCOM SPRINKLER TIMER MOTION DETECTOR kp ST i T ELECTRICAL LEGEND DOUBLE CAT 5e CABLE tv CV C5 RECESSED ADJUSTABLE FIXTURE VAPOR PROOF RECESSED FIXTUREVP UNDER CABINET FIXTURE FLOOD/SECURITY LIGHTS FLOURESCENT LIGHT FIXTURE CEILING MOUNTED J-BOX RECESSED LIGHT FIXTURE CJ CEILING FAN WALL MOUNTED J-BOX CEILING MOUNTED FIXTURE WALL MOUNTED FIXTUREWF WJ CF EXHAUST FAN SMOKE DETECTOR SINGLE OUTLET PHONE JACKPH VIDEO OUTLET AHU 1 WH ACCU #1 STORAGE 9' Clg GARAGE 12'-10" Clg BONUS STORAGE ROOM 9' Clg LOBBY Volume Clg ELEVATOR MECH 1 9' Clg UP ACCU #2 ELEV EQUIP RE-CIR PUMP POOL EQUIP cen vac UP ACCU #3 AHU 2 STORAGE 9' Clg POOL STORAGE 9' Clg COATS 9' Clg 10x8 WALL LOUVER NRD 8x6 12"x12" DIRECTIONAL SUPLY AIR GRILL 400 CFM FAN CONTROlLED BY GARAGE CO SENSOR 10x8 WALL LOUVER 8x6 WF WF L2 D D CF CF D GF GF GF GF GF GF CFCF CF WP G F TO UPPER FLOOR SWITCH WP G F WF WF L5 L5 L5 WF L2 D CF GF WPGF CF L6 WF L3 WF L3 WF L3 CF HARDWIRE w/ SWITCH 1 NOTE: ELECTRIC, MECHANICAL, & PLUMBING SYSTEM COMPONENTS AT THIS LEVEL ARE NOT TO BE MOUNTED ON OR PENETRATE THROUGH WALLS THAT ARE DESIGNED TO BREAK AWAY UNDER FLOOD LOADS NON-BREAKAWAY STRUCTURAL CONCRETE COLUMN TYP. 11 D GF MOUNT FIXTURE TO COLUMN MOUNT VAC & RECEPTACLES TO COLUMN MOUNT SWITCHES & RECEPTACLE TO CMU SHEAR WALL MOUNT FIXTURE TO BEAM/SLAB ABV NOT BREAKAWAY WALL LT BBQ DRWA RE F . OVENS COOKTOP w/ HOOD ABV MASTER BEDROOM Coffer Clg 10'-6"/11' ELEVATOR PWDR 10' Clg MSTR WIC 11' Clg LIBRARY 11' Clg WIC 10' Clg UTIL 10' Clg BATH 6 10' Clg KITCHEN Coffer Clg 11'/11'-4" DINING 11' Clg PANTRY 10' Clg BALCONY 1 OUTDOOR LIVING 11' Clg GREAT ROOM Coffer Clg 11'/11'-4" UP DN SITTING 11' Clg WINE WALL ELEVATED DECK DN OPTIONAL POOL/SPA SUN SHELF SPA MSTR BATH Coffer Clg 10'-6"/11' a/c chase 22 " x 3 6 " A . A . WF WF WF WF L1 L1 L1 L1 L1L1 L1L1 L2 L2 L2 L2 WPGF WPGF CF CF CF GF tv @ +60" w/ BACKING FOR TV MOUNT CF VP GF TO UPPER FLOOR SWITCH tv @ +60" (VERIFY HT.) w/ BACKING FOR TV MOUNT TO LOWER FLOOR SWITCH CF CF GF GF GF VP WF GF CF CF GF GF GF GF GF GF GF CFCF CF tv @ +60" (VERIFY HT.) w/ BACKING FOR TV MOUNT VERIFY LOCATION TO POOL LIGHTS WF L5 L8 L8 L8 GF CF 1 1 1 5 MOUNTING EXTERIOR LIGHTING FIXTURE SCHEDULE SYMBOL FIXTURE NAME BULB WATT & TYPE QUANTITY HEIGHT0 FLR 2 FLR TOTAL MOUNTING WALL 6'-6"L2 SAGA STEP LIGHT (HORIZ LOUVER) SG-R-1LED-HDL-AML (4) 1w AMBER LED PER FIXTURE WALL ABV STEPS (SEE ELEV'S) L3 L4 4 -6 --3 TEKA ARCADE SERIES 20" OR 26" LOUVERED WALL MOUNT WALL 8'-6"L5 1 -4 2 3 3 1 FLR 8 5w AMBER LED MR16 CEILING IN CEILINGL1-8- L6 H36LVTAT-3011-TBZBB (BRONZE) CEILING H36LVTAT-3011-SNBB (NICKEL) L7 NOTE: PER 62B-33.0155(1)(n) ALL WINDOWS AND GLASS DOORS VISIBLE FROM ANY POINT ON THE BEACH MUST BE TINTED TO A TRANSMITTANCE VALUE (LIGHT TRANSMISSION FROM INSIDE TO OUTSIDE) OF 45% OR LESS THROUGH THE USE OF TINTED GLASS OR WINDOW FILM VERIFY FIXTURE FINISHES WITH OWNER/INTERIOR DESIGNER VERIFY FIXTURES WITH DEP SUBMITTAL INTELLIBRITE LED 26W -TURTLE EDITION BELOW WATER LINE L8 3 -3-PENTAIR INTELLIBRITE 5G SeaGull 8313901EN-10 WALL SCONCE 9w AMBER LED A19 (1) 10w LED HINKLEY 1665TT LED CLG FLUSH MOUNT (1) 8w LED CEILING @ CEILING--11 AC Q U A V I S T A L O T # 1 VE N E T I A N A D M I N I S T R A T I O N L L C 5. 1 9 . 2 0 2 0 ob No. 1802011 IBO GS 4.17.2018 ENG REV'S GS 8.6.2018 1 1st Bldg Comments GS 3.1.2019 2 As built roofing GS 4.20.2020 3 relocated flood vents GS 5.14.2020 4 flood resistant details GS 5.18.2020 5 relocate electric panels GS 5.19.2020 E201 GARAGE LEVEL ELECTRIC PLAN SCALE: 3/16" = 1'-0" 1ST FLOOR ELECTRIC PLAN SCALE: 3/16" = 1'-0" 64 ' - 1 0 " 16 ' - 2 " 1' - 0 " 6' - 0 " AHU 1 WH ACCU #1 STORAGE 9' Clg 12'-8" x 11'-2" GARAGE 12'-10" Clg 49'-4" x 38'-10" BONUS STORAGE ROOM 9' Clg 33'-6" x 14'- 10" LOBBY Volume Clg 20'-10" x 15' ELEVATOR MECH 1 9' Clg UP ACCU #2 73'-0" 2'-8"50'-8"16'-0" 69'-4" 44'-0"20'-4" 1'-0" 6'-0" 8"4'-8"8" 7'-10"4"7'-6"1'-0"2'-0" 64 ' - 1 0 " 41 ' - 1 0 " 23 ' - 0 " 13 ' - 4 " 23 ' - 6 " 1' - 0 " 21 ' - 4 " 8" 5'-2"14'-6" 33'-6"8" 4'-0" 15'-9"23'-9" 1'-4"32'-10"1'-4"14'-6"8" 2'-8"8"4'-0"8'-4"3'-10"20'-6"1'-0"4'-4" 8" 14 ' - 1 0 " 8" 2' - 8 " 4" 1' - 0 " 10 ' - 0 " 1' - 0 " 10 ' - 4 " 8" 7'-4" 27 ' - 4 " 8" 10 ' - 3 " 11 " 3' - 1 0 " 8" 8' - 4 " 18 ' - 4 " 8" 9' - 1 0 " 16 ' - 0 " 1' - 6 " 8" 5' - 0 " 8" 8" 14 ' - 1 0 " 2' - 6 " 3' - 6 " 5' - 2 " 4" 5' - 8 " 3' - 1 0 " 3'-8" 16'-0"3'-8" 4" 7" 7" 001 003 002 007 010 009 012 013 008 2 1 7 6 210 8" 209 1 2 3 4 5 10 11 12 13 14 15 16 17 LOWER STAIR DETAILS 11'-0" FLOOR TO FLOOR 19 RISERS @ 6.95" EACH 11" TREADS w/ 1" BULLNOSE 21'-4" 2'-2"18'-2" 1'-0" POOL ABOVE NON-HABITABLE AREA BELOW ELEVATED DECK 004 005 ELEV EQUIP RE-CIR PUMP 4'-6" POOL EQUIP cen vac 4"8" 2'-4"1'-0"4'-0" 4" 3 4 006 46 " UP ACCU #3 AHU 2 4'-10"7' - 1 0 " CHASE ABV 4" 011 014 015 STORAGE 9' Clg POOL STORAGE 9' Clg 3" 4"4'-2"4'-4" 4' - 1 0 " 3' - 4 " 4" 6' - 4 " 8" 10 ' - 1 0 " 4" 5' - 0 " 206 31'-0" 6.5" 6.5" 6.5" 6.5" 6.5" 6.5" 6.5" 6" 9 13121110 8 7 6 5 4 3 2 1 4'-0"12'-0" 4' - 0 " 8' - 0 " 3' - 8 " 7" 7" 7" 7"9' - 8 " NOTE: EQUIP. TO BE ELEVATED ON PEDESTALS/STANDS ABOVE DFE (DESIGN FLOOD ELEVATION) OF NAVD 16.4 NOTE: EQUIP. TO BE ELEVATED ON PEDESTALS/STANDS ABOVE DFE (DESIGN FLOOD ELEVATION) OF NAVD 16.4 6' - 8 " 8" 4' - 8 " 4' - 4 " 1' - 2 " 26 ' - 8 " 8" 4'-4"6'-0"14'-6"8"16'-10" 3'-10"4" 016 4" COATS 9' Clg 4' - 8 " 3' - 3 " 4' - 2 " 1' - 4 " 4' - 2 " 3' - 3 " BALCONY GUARD 214 214 214 214 214 214 214 214 214 215 1 DRIP DRY 1 NOTE: INTERIOR FRAMED WALLS ON THIS LEVEL TO BE CONSTRUCTED PER D3 ON SHEET A801 FOR BREAKAWAY CONSTRUCTION 1 216 216 214 1 1 214 214 3 3 200 SERIES KEYNOTES MIRROR200 - BUILT-IN CABINETRY201 - TEMPERED GLASS SHOWER ENCLOSURE 202 - .. 203 - OPEN SHELVES 204 - CUSTOM CLOSET INTERIOR 205 - 206 - 207 - CURB FOR SHOWER 208 - ADJACENT WALLS TO HAVE MIN R-11 INSUL & MIN 1/2" GYP BD ON GARAGE SIDE FOR GARAGE SEPARATION 209 - T.S. COLUMN IN WALL211 - MIN 5/8" TYPE 'X' GYP BD FOR GARAGE CLG BELOW HABITABLE ROOMS 210 - 212 - 213 - 214 - TROUGH FOR POOL INFINITY EDGE DRAPERY POCKET T.S. COLUMN IN DECORATIVE COL/POST 42" HIGH CMU WALL 8"x16" ENGINEERED SMART FLOOD VENT PROVIDING 200 SF OF FLOOD COVERAGE 215 -MIN R-20 SPRAY APPLIED OPEN CELLED FOAM INSULATION AT GARAGE CEILING 1 216 -16"x8" WALL LOUVER FOR FLOOD VENTING THRU INTERIOR SPACES BOT OF VENT @ 8" A.F.F. DETAIL AREA CALCULATION 1) 1ST FLOOR LIVING 2) 2ND FLOOR LIVING 3) LOBBY BALCONY 1 BALCONY 2 BONUS STORAGE COVERED ENTRY GARAGE OUTDOOR LIVING 2585 SF 1263 SF 390 SF 82 SF 200 SF 699 SF 68 SF 1877 SF 356 SF 7520 SF LIVING AREA CALCULATION 1) 1ST FLOOR LIVING 2) 2ND FLOOR LIVING 3) LOBBY 2585 SF 1263 SF 390 SF 4238 SF GARAGE LEVEL WINDOW SCHEDULE MARK WD HGT SIZE TYPE ELEV HEAD HT NOTES GARAGE LEVEL DOOR SCHEDULE MARK WD HGT SIZE TYPE NOTES FLOOD VENT CALCULATION 8"x16" ENGINEERED FLOOD VENTS THAT PROVIDE 200 SF OF FLOOD COVERAGE GARAGE 1877 SF/200 = 9.3 = 10 VENTS LOBBY & STORAGE AREAS 1089 SF/200 = 5.4 = 6 VENTS BELOW POOL DECK AREA 1066 SF/200 = 5.3 = 6 VENTS THE DESIGN OF THE FLOOD VENT OPENINGS WILL PROVIDE FOR EQUALIZATION OF HYDROSTATIC FLOOD FORCES ON EXTERIOR WALLS BY ALLOWING FOR THE AUTOMATIC ENTRY AND EXIT OF FLOODWATERS AS SPECIFIED IN SECTION 2.7.2.2 OF ASCE 24. PER FBC R322.2.2 FOOT NOTE 2.1 THE BOTTOM OF EACH OPENING SHALL BE NOT MORE THAN 1 FOOT ABOVE THE HIGHER OF THE FINAL INTERIOR FLOOR AND THE FINISHED EXTERIOR GRADE IMMEDIATELY BELOW THE OPENING NOTE: DESIGN FLOOD ELEVATION IS AT 16.4 NAVD. PER FBC R322.1.8 BUILDING MATERIALS AND INSTALLATION METHODS USED FOR FLOORING & INTERIOR AND EXTERIOR WALLS AND WALL COVERINGS BELOW THE DESIGN FLOOD ELEVATION (DFE) SHALL BE FLOOD DAMAGE RESISTANT MATERIALS THAT CONFORM TO THE PROVISIONS OF FEMA TB-2. MECHANICAL, ELECTRICAL, & PLUMBING SYSTEMS BELOW DFE ARE TO BE DESIGNED & INSTALLED TO PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC LOADS AND STRESSES PER FBC R322.1.6 PER ASCE 24-05 ELEVATOR COMPONENTS LOCATED BELOW THE DFE SHOULD BE CONSTRUCTED OF FLOOD DAMAGE-RESISTANT MATERIALS AND DESIGNED TO RESIST PHYSICAL DAMAGE DURING FLOODING. IF AN ELEVATOR CAB PROVIDES ACCESS TO AREAS BELOW THE DFE IT MUST BE EQUIPPED WITH CONTROLS THAT PREVENT THE CAB FROM DESCENDING INTO FLOODWATERS 1 AC Q U A V I S T A L O T # 1 VE N E T I A N A D M I N I S T R A T I O N L L C 4. 2 0 . 2 0 2 0 ob No. 1802011 IBO GS 4.17.2018 ENG REV'S GS 8.6.2018 1 1st Bldg Comments GS 3.1.2019 2 As built roofing GS 4.20.2020 A200GARAGE LEVEL PLAN SCALE: 1/4" = 1'-0" 64 ' - 1 0 " 16 ' - 2 " 1' - 0 " 6' - 0 " AHU 1 WH ACCU #1 STORAGE 9' Clg 12'-8" x 11'-2" GARAGE 12'-10" Clg 49'-4" x 38'-10" BONUS STORAGE ROOM 9' Clg 33'-6" x 14'- 10" LOBBY Volume Clg 20'-10" x 15' ELEVATOR MECH 1 9' Clg UP ACCU #2 73'-0" 2'-8"50'-8"16'-0" 69'-4" 44'-0"20'-4" 1'-0" 6'-0" 8"4'-8"8" 7'-10"4"7'-6"1'-0"2'-0" 64 ' - 1 0 " 41 ' - 1 0 " 23 ' - 0 " 13 ' - 4 " 23 ' - 6 " 1' - 0 " 21 ' - 4 " 8" 5'-2"14'-6" 33'-6"8" 4'-0" 15'-9"23'-9" 1'-4"32'-10"1'-4"14'-6"8" 2'-8"8"4'-0"8'-4"3'-10"20'-6"1'-0"4'-4" 8" 14 ' - 1 0 " 8" 2' - 8 " 4" 1' - 0 " 10 ' - 0 " 1' - 0 " 10 ' - 4 " 8" 7'-4" 27 ' - 4 " 8" 10 ' - 3 " 11 " 3' - 1 0 " 8" 8' - 4 " 18 ' - 4 " 8" 9' - 1 0 " 16 ' - 0 " 1' - 6 " 8" 5' - 0 " 8" 8" 14 ' - 1 0 " 2' - 6 " 3' - 6 " 5' - 2 " 4" 5' - 8 " 3' - 1 0 " 3'-8" 16'-0"3'-8" 4" 7" 7" 001 003 002 007 010 009 012 013 008 2 1 7 6 210 8" 209 1 2 3 4 5 10 11 12 13 14 15 16 17 LOWER STAIR DETAILS 11'-0" FLOOR TO FLOOR 19 RISERS @ 6.95" EACH 11" TREADS w/ 1" BULLNOSE 21'-4" 2'-2"18'-2" 1'-0" POOL ABOVE NON-HABITABLE AREA BELOW ELEVATED DECK 004 005 ELEV EQUIP RE-CIR PUMP 4'-6" POOL EQUIP cen vac 4"8" 2'-4"1'-0"4'-0" 4" 3 4 006 46 " UP ACCU #3 AHU 2 4'-10"7' - 1 0 " CHASE ABV 4" 011 014 015 STORAGE 9' Clg POOL STORAGE 9' Clg 3" 4"4'-2"4'-4" 4' - 1 0 " 3' - 4 " 4" 6' - 4 " 8" 10 ' - 1 0 " 4" 5' - 0 " 206 31'-0" 6.5" 6.5" 6.5" 6.5" 6.5" 6.5" 6.5" 6" 9 13121110 8 7 6 5 4 3 2 1 4'-0"12'-0" 4' - 0 " 8' - 0 " 3' - 8 " 7" 7" 7" 7"9' - 8 " NOTE: EQUIP. TO BE ELEVATED ON PEDESTALS/STANDS ABOVE DFE (DESIGN FLOOD ELEVATION) OF NAVD 16.4 NOTE: EQUIP. TO BE ELEVATED ON PEDESTALS/STANDS ABOVE DFE (DESIGN FLOOD ELEVATION) OF NAVD 16.4 6' - 8 " 8" 4' - 8 " 4' - 4 " 1' - 2 " 26 ' - 8 " 8" 4'-4"6'-0"14'-6"8"16'-10" 3'-10"4" 016 4" COATS 9' Clg 4' - 8 " 3' - 3 " 4' - 2 " 1' - 4 " 4' - 2 " 3' - 3 " BALCONY GUARD 214 214 214 214 214 214 214 214 214 215 1 DRIP DRY 1 NOTE: INTERIOR FRAMED WALLS ON THIS LEVEL TO BE CONSTRUCTED PER D3 ON SHEET A801 FOR BREAKAWAY CONSTRUCTION 1 216 216 214 1 1 214 214 3 3 200 SERIES KEYNOTES MIRROR200 - BUILT-IN CABINETRY201 - TEMPERED GLASS SHOWER ENCLOSURE 202 - .. 203 - OPEN SHELVES 204 - CUSTOM CLOSET INTERIOR 205 - 206 - 207 - CURB FOR SHOWER 208 - ADJACENT WALLS TO HAVE MIN R-11 INSUL & MIN 1/2" GYP BD ON GARAGE SIDE FOR GARAGE SEPARATION 209 - T.S. COLUMN IN WALL211 - MIN 5/8" TYPE 'X' GYP BD FOR GARAGE CLG BELOW HABITABLE ROOMS 210 - 212 - 213 - 214 - TROUGH FOR POOL INFINITY EDGE DRAPERY POCKET T.S. COLUMN IN DECORATIVE COL/POST 42" HIGH CMU WALL 8"x16" ENGINEERED SMART FLOOD VENT PROVIDING 200 SF OF FLOOD COVERAGE 215 -MIN R-20 SPRAY APPLIED OPEN CELLED FOAM INSULATION AT GARAGE CEILING 1 216 -16"x8" WALL LOUVER FOR FLOOD VENTING THRU INTERIOR SPACES BOT OF VENT @ 8" A.F.F. DETAIL AREA CALCULATION 1) 1ST FLOOR LIVING 2) 2ND FLOOR LIVING 3) LOBBY BALCONY 1 BALCONY 2 BONUS STORAGE COVERED ENTRY GARAGE OUTDOOR LIVING 2585 SF 1263 SF 390 SF 82 SF 200 SF 699 SF 68 SF 1877 SF 356 SF 7520 SF LIVING AREA CALCULATION 1) 1ST FLOOR LIVING 2) 2ND FLOOR LIVING 3) LOBBY 2585 SF 1263 SF 390 SF 4238 SF GARAGE LEVEL WINDOW SCHEDULE MARK WD HGT SIZE TYPE ELEV HEAD HT NOTES GARAGE LEVEL DOOR SCHEDULE MARK WD HGT SIZE TYPE NOTES FLOOD VENT CALCULATION 8"x16" ENGINEERED FLOOD VENTS THAT PROVIDE 200 SF OF FLOOD COVERAGE GARAGE 1877 SF/200 = 9.3 = 10 VENTS LOBBY & STORAGE AREAS 1089 SF/200 = 5.4 = 6 VENTS BELOW POOL DECK AREA 1066 SF/200 = 5.3 = 6 VENTS THE DESIGN OF THE FLOOD VENT OPENINGS WILL PROVIDE FOR EQUALIZATION OF HYDROSTATIC FLOOD FORCES ON EXTERIOR WALLS BY ALLOWING FOR THE AUTOMATIC ENTRY AND EXIT OF FLOODWATERS AS SPECIFIED IN SECTION 2.7.2.2 OF ASCE 24. PER FBC R322.2.2 FOOT NOTE 2.1 THE BOTTOM OF EACH OPENING SHALL BE NOT MORE THAN 1 FOOT ABOVE THE HIGHER OF THE FINAL INTERIOR FLOOR AND THE FINISHED EXTERIOR GRADE IMMEDIATELY BELOW THE OPENING NOTE: DESIGN FLOOD ELEVATION IS AT 16.4 NAVD. PER FBC R322.1.8 BUILDING MATERIALS AND INSTALLATION METHODS USED FOR FLOORING & INTERIOR AND EXTERIOR WALLS AND WALL COVERINGS BELOW THE DESIGN FLOOD ELEVATION (DFE) SHALL BE FLOOD DAMAGE RESISTANT MATERIALS THAT CONFORM TO THE PROVISIONS OF FEMA TB-2. MECHANICAL, ELECTRICAL, & PLUMBING SYSTEMS BELOW DFE ARE TO BE DESIGNED & INSTALLED TO PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC LOADS AND STRESSES PER FBC R322.1.6 PER ASCE 24-05 ELEVATOR COMPONENTS LOCATED BELOW THE DFE SHOULD BE CONSTRUCTED OF FLOOD DAMAGE-RESISTANT MATERIALS AND DESIGNED TO RESIST PHYSICAL DAMAGE DURING FLOODING. IF AN ELEVATOR CAB PROVIDES ACCESS TO AREAS BELOW THE DFE IT MUST BE EQUIPPED WITH CONTROLS THAT PREVENT THE CAB FROM DESCENDING INTO FLOODWATERS 1 AC Q U A V I S T A L O T # 1 VE N E T I A N A D M I N I S T R A T I O N L L C 4. 2 0 . 2 0 2 0 ob No. 1802011 IBO GS 4.17.2018 ENG REV'S GS 8.6.2018 1 1st Bldg Comments GS 3.1.2019 2 As built roofing GS 4.20.2020 A200GARAGE LEVEL PLAN SCALE: 1/4" = 1'-0"