HomeMy WebLinkAboutProduct Approval Fwd: Material description: Mule-Hide TPO(c)Reinforced 60 mil roofmg system Page 2 of 3
Permitting NEMO l etc.
ST. Lurie County, Ctif±tarevf,utherFtotlon,ir324ss
u.. . ..__._-
353 C ristlatt Street;Unit 413
Oxford,:CT_6478
{203);262-9245
ENGINEER EVALUATE TEST: CONSULT.
EVALUATIONREPORT
Mule Hide Products tc.Jnc, Evaluation::Report M15060:06.69-R6
1395;Prince Hall Drive,Suite A FL1277.2 R&
gelolt lNl 53511-5481 Date,of Issuance:06/24/2009:
(608)36$.3111: Revision 6:'0081-1610
scoRE:
This Evaluation:Report is; slued,under Rule 61G20.3 and`the;,applicable riles and regulatidns governing the.use of
construction materials'in the-State of Florida.:The documentation:aubmitted'has been reviewed by Robert Nieminen,
P.E.:for use of ihevroduct:under the Florida Building Code: The product described has been evaluated for
compliance with the;6th Edition:(2017)Florida Building Code.sections noted herein.
DESMP,ndm,Mule-HidetRO-t:Single Ply Roof Systems
LABELING; Labeling shall:be•in accordance with the requirements of the:Accredited Quality Assurance Agency noted;
herein.
manNuEo Comptitrtta-This Evaluation Report'isvalid.until such time•as the named products).changes,the.referenced
Quality Assurance documentation changes,or provisions:tf the.Code thatrelate to the product change Acceptance of
this Evaluation Report.bylhe;namedclient constitutes agreementto natifyRabert NieminenP E::ofi.;any changes io the
produ..cd(sl,the C6ality Assurance or the production facility location{s). IVEMO I etc.requires;a complete reviLw'Of this
Evaluation Report relative to updated Code requirements with:each'Code Cycle.
Mild isEmpa:=The Evaluatidn`R;eport number preceded:by the:.tivords 'NEMO.s etc Evaluated`,'may be displayed'in:
advertising literature:,lfany portion of the Evaluation Report is displayed,then it shalt be done In its entirety:
INS?EGTIdN Upon request;a copyof this entire EvaluatioFi: Report shall be•provided:,ia the:user'by-the manufacturer or
its disiributors:and shall W available for inspection at the job site at the reoti0t.6f'the Building Official.
this Evaluation Report"consists of pages 1 through s,plu02-pages.of Apperi t:
Prepared by:
Roberti M Nieminen P.E- ttiefaamsleseala
ppraringwasauthorized'4yRols�t
Florida RegistrationNo.59166,Florida DCA ANE1983 �ar ±i e klerninen 6 an olp3aj2D2�Tlsis dcxs n6t mai an
�';`°!«,:H+'�� elesuonicokyslgneddoa+meht:
CEBTIrI[ATION DFINDEPENDENLE:
1. NE.Mo ETCx°LLC does not have,nordoes it intend to acquire or will.it:acquire,a.financial.interest'in any company manufacturing or
distdibuting,products iteualuates,
2: 'NEMO ETG:LLC is rlDt owned,;operated or controlled'by.any company mand6cturi€ig or distributing products it evaluates:
3. Robgrt:Niemmen P.E.,:.oes,not have nor will acquire,.a fnanaat riterest in any company.maniifactdring or distributing,products"for
,tvhi,ch the.evatuation re'podt aee being issued.
4. Ra6ert Nieminen P.E;:dues not hive,nor will acquire,'a financial interest in any.other entity Involved-in the,appioval procas of the
product
S. Tt isis a building code evaluation:Neither NEMOIetc.notRobertNieminen P.E,are,in_anyway the Desigher of Record for:any,project
an wltich this Evaluation:Report;:arpreviousversionsthereof is/was.used:for:permittingar design guidance finless retained"specifically.
fda.'that purpose.
02419 J4EMo ETC, C
REVIEWED FOP
CODE COMPLIA
FILEtIE COU v
m
�...,w>..�....-yi x.�x..s�-• «
c�jj D 53
https://mail.aol.com/webmail-std/en-us/PrintMessage 5/8/2020
Fwd: Mule-Hide TPO(c) installation Page 1 of 1
From: mismithpbg@aol.com,
To: boblinda21 @aol.com,
Subject: Fwd:Mule-Hide TPO(c)installation
Date: Fri,May 8,2020 10:42 am
Print this e-mail, also.
Thank you,
Margaret I. Smith
702-232-5958
-----Original Message----
From: Thor Lewis<thorsmountain1@icloud.com>
To: mismithpbg@aol.com
Sent:Thu, May 7, 2020 7:22 pm
Subject: Mule-Hide TPO(c) installation
Mule-Hide TPO(c) reinforced 60 mil
Scope of application:
-seams will be fastened with 2 inch barbed plates and 1 1/2 x 1/4 inch deck screws every 6 inches
-overlapping 5 inch seams will be welded
-termination bar will extend 1 inch over the edge and fastened through the TPO membrane every 6 inches with
1 1/2 x 1/4 inch deck screws
-2 inch barbed plates and 1 1/2 x 1/4 inch deck screws will be fastened around all penetrations
-all exposed fasteners will have a 9 x 9 inch TPO cover weld
-all penetrations will have TPO flashing details and any pipes will be terminated with circle clamps and TPO
caulking
https://mail.aol.com/webmail-std/en-us/PrintMessage 5/8/2020