HomeMy WebLinkAboutBuilding Plans; updated 5-11-20Southeastern Metals 24 ga 5v Crimp Metal roofing installed
per product approval FLU 11115.1 over rolyglass self adhered
roofing underlayment over 19/32" CDX plywood attached —
to trusses per sheeting attachment diagram on roof plan
24"
O.H.
5/8" thick smooth finished
stucco on all columns
Smooth finished stucco
capital and base
12
3 1 SLOPE
12
5 1 SLOPE
0
6-
0
■
0
Lo
M
12
SLOPE I 5
12
SLOPE 3
Southeastern Metals 24 ga 5v Crimp Metal roofing installed
per product approval FLS 11115.1 over POlyglass self adhered
roofing underlayment over 19/32" CDX plywood attached
to trusses per sheeting attachment diagram on roof plan
12
SLOPE 15
12
SLOPE 3
5/8" thick light textured Pre—Manufactured outlooker
OPEN stucco on typical concrete
, block construction p m 5/8" thick smooth
0 o finished stucco band
L E F T S I D E E L E V 4 T f O N
SCALE: 1/4" = 1'-0"
RIGHT S ELEV/4TION
SCALE: 1/9" = 1'-0"
Roofing installed
iss self adhered
)od attached
n roof plan
hed
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:57:19 -04'00'
0
N
v
LL
�
o 3
0o 0
Q v
U
N
1
AL
W
o
O
O
Z
W
W
O
z>")OD;o
QL
s
'
A-
03CA
�-
U
<
z
N
#
W
civ
'
UO
U
o �
IL
cr
�
U
�
„�3
Co
00
~
T
W
e� x
QL
SHEAT NO:
2.
OF 2.,
JOB NUMBER:
Iq-201
N
1
AL
W
o
O
O
Z
W
oo m
O
z>")OD;o
s
'
A-
03CA
�-
r r
<
z
N
#
1
civ
UO
i rte'
cr
W
U
�
„�3
Co
~
T
W
e� x
--4
U-
-tk+
�n
SHEAT NO:
2.
OF 2.,
JOB NUMBER:
Iq-201
I
m
Dryer VTw �fl
.4
Ila
:• •
2S,_4„ 29,_4„ 2S,_4„
12'-8" 12'-8" 14'-8"
42" high glass guard rail
F a shop drawings by mfg
N
r — — — — — — — — — — — — — i
I I
I I
I I
OFFICE I
I
0-
L ----L — — — — — —
-- -------
4'-O„
t
rF:_
LAUNDRY
BEDROOM
U2
I
BEDROOM
s$3
`I LO
at 40"
o.c. for walls u to 10'-0"* hi h. Space 32" o.c. for walls up
p10'-0"
DRYER
For walls over a special inspection is required by any licensed
WASHER
LOAD
-
LOAD
FRONT
= 2" x 4" non-bearing stud walls - see sections. Insulate
FRONT
t
rF:_
LAUNDRY
BEDROOM
U2
I
BEDROOM
s$3
`I LO
i
Ln
at 40"
o.c. for walls u to 10'-0"* hi h. Space 32" o.c. for walls up
p10'-0"
LOFT
For walls over a special inspection is required by any licensed
structural
engineer to review and approve the vert. steel installation in
-
in the wall cavity and into beam.
Owner Specified
= 2" x 4" non-bearing stud walls - see sections. Insulate
-I
with R-11 batts at bathrooms & between A/C and
GLASS
Non -A/C spaces
2'-2"
2" x 8" bearing stud walls - see sections. Insulate
SINGLE
BEDROOM
O
O
Linear Floor drain
2" x 12" bearing stud walls - see sections. Insulate
HUNG
with R-19 batts at bathrooms & between A/C and
1 3'-1"
Non -A/C spaces
SINGLE
* top of wall height is clear span of block to bottom of first structural beam
This applies to the garage area only in this case.
K
I
SLIDING PANEL DOOR
00
24'-0" x 10'-0"
�
M
00
GARAGE DOOR
0 ©0
2'-8" x 8'-0"
0 0
0
m
FRENCH DOOR
0
24'-0" x 8'-0"
POCKET SLIDING GLASS DOOR
42" high guard
rail
24 risers at 1 1/16" high
22 Treads at 11" deep
42"
high guard rail
0
�
Bench
®
_
mfg
0
shop
drawings by mfg
Lo
,
10,
42" high knee wall
with type I handrail at C-4
I
_
REAR
RCI
_
©
m
Rain
head
O
--
------
CO
--- ——36—hh------- — — ——
— — —
— —— — — —�
K
O O
Controls
H
Controls
F-------- i i--------�
D N—
i�l
mJ
—
-----
F I I I Rod ii Shelf �y
0
3'-Imp2"
O
Mirror
I
®
I
0
N
N
,
-
200 CFM
FAN
Owner specified
0
q'-0"CFM
.L Scones Mac
tub with Surround
r----
FAN
r
c�P1-=�, N.TO�F.LOl1R I
Rod E Shelf
H --------
—
Stack studs
in wall for
-
D
SGD Jamb
Attachment
1I
=
4
Doors to pocket
with short frame
0
- I L -----J I L-----� I
� — — — — — — — — — — — — —
— — — — — — — — —
L ---------J L--------� �r
o 0
E
00II I IE)i 1 110101100 0 00
0 0
0
®
_ ®
®
24'-O"
-2
BEDROOM
H
H
O
0
3' -II"
cn 12'-1" 12'-1" cn
3'-11"
O # 5
FRONT PORCH
Rod 6 Shelf
00 0o O
Provide motorized tv
projector to recess into ceiling
I
I
n
I
1_F_
O
_
u per mfg's specifications
C -I C -I -__Q
I
II'—Io"
— O
`
1IASTER BED
down rpprojection provideforrecessed roll
screen recessmfg
I
I
-
= I HERS
I u I l
H I S
I
-
per
specifications
I
I
r
I xa— I
I
-
L—
�I
I
—
— — — — — — — — — — — — — — — — — — — — —�
r----�
ttZU
----------J
— — — — — Rod 6. Shelf
I
ATTICI
I
FF
Rod it Shelf
i
Ln
I. I.
F
24 O"
I i i i I
I i i i I
Q 1
XI
I i i of I
---------------------
ROOF= BELOW
I I
EXT. WALL ,
J' -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
V__________________________________________________________________________________�I
SECO D FLOOF, �=/4
000
24' O"
42" high glass guard rail
shop drawings by mfg
I i i i I
I i i i I
I i i i I
QI
I i i I
XI
LI
I i i I
--------------------
I I
ROOF BELOW
� I I
I I
I I �
1 � -----EXT_ WALL -- - - - - - - - - - - - - - - - - - --
1 1
SEE CEILING PLANS FOR CEILING HEIGHTS AND DIMENSIONS SHEETS 6 t 1.
SCALE 3/16" = I' -O"
PROVIDE TANKLESS WH UNDER TUB SURROUND
FOR TUB ONLY. PROVIDE FOR ACCESS ON
TOILET SIDE OF TUB SURROUND FOR TUB EQ. AND WH
WALL SYMBOL LEGEND
�= CBS walls - Fill cells solid with concrete and (l) u5 bar vert.
at 40"
o.c. for walls u to 10'-0"* hi h. Space 32" o.c. for walls up
p10'-0"
LOFT
For walls over a special inspection is required by any licensed
structural
engineer to review and approve the vert. steel installation in
-
in the wall cavity and into beam.
HUNG
= 2" x 4" non-bearing stud walls - see sections. Insulate
-I
with R-11 batts at bathrooms & between A/C and
GLASS
Non -A/C spaces
2'-2"
2" x 8" bearing stud walls - see sections. Insulate
SINGLE
BEDROOM
4.
Non -A/C spaces
x 4'-2"
2" x 12" bearing stud walls - see sections. Insulate
HUNG
with R-19 batts at bathrooms & between A/C and
1 3'-1"
Non -A/C spaces
SINGLE
* top of wall height is clear span of block to bottom of first structural beam
This applies to the garage area only in this case.
K
I
SLIDING PANEL DOOR
L
24'-0" x 10'-0"
�
M
20'-0" x 8'-0"
GARAGE DOOR
Stair Info: 14'-I 1/4" A.F.F.
2'-8" x 8'-0"
20 MIN. FIRE RATED DOOR
#�
m
FRENCH DOOR
0
24'-0" x 8'-0"
POCKET SLIDING GLASS DOOR
42" high guard
rail
24 risers at 1 1/16" high
22 Treads at 11" deep
42"
high guard rail
0
�
®
shop drawings by
mfg
shop
drawings by mfg
42" high knee wall
with type I handrail at C-4
I
O
C-4
--
------
--- ——36—hh------- — — ——
— — —
— —— — — —�
K
O O
DN
F-------- i i--------�
D N—
— — — — — --
—
-----
F I I I Rod ii Shelf �y
JI
Mirror
q'-0"CFM
r----
FAN
c�P1-=�, N.TO�F.LOl1R I
Rod E Shelf
H --------
—
N
-
1I
- I L -----J I L-----� I
L ---------J L--------� �r
o 0
E
00II I IE)i 1 110101100 0 00
0 0
0
®
_ ®
®
BEDROOM
3' -II"
cn 12'-1" 12'-1" cn
3'-11"
O # 5
FRONT PORCH
00 0o O
O
C -I C -I -__Q
`
I. I.
F
24 O"
I i i i I
I i i i I
Q 1
XI
I i i of I
---------------------
ROOF= BELOW
I I
EXT. WALL ,
J' -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --
V__________________________________________________________________________________�I
SECO D FLOOF, �=/4
000
24' O"
42" high glass guard rail
shop drawings by mfg
I i i i I
I i i i I
I i i i I
QI
I i i I
XI
LI
I i i I
--------------------
I I
ROOF BELOW
� I I
I I
I I �
1 � -----EXT_ WALL -- - - - - - - - - - - - - - - - - - --
1 1
SEE CEILING PLANS FOR CEILING HEIGHTS AND DIMENSIONS SHEETS 6 t 1.
SCALE 3/16" = I' -O"
PROVIDE TANKLESS WH UNDER TUB SURROUND
FOR TUB ONLY. PROVIDE FOR ACCESS ON
TOILET SIDE OF TUB SURROUND FOR TUB EQ. AND WH
WALL SYMBOL LEGEND
�= CBS walls - Fill cells solid with concrete and (l) u5 bar vert.
at 40"
o.c. for walls u to 10'-0"* hi h. Space 32" o.c. for walls up
p10'-0"
to 15'-0"*
For walls over a special inspection is required by any licensed
structural
engineer to review and approve the vert. steel installation in
the footings,
in the wall cavity and into beam.
HUNG
= 2" x 4" non-bearing stud walls - see sections. Insulate
(3) 2'-6" x 3'-6"
with R-11 batts at bathrooms & between A/C and
GLASS
Non -A/C spaces
2'-2"
2" x 8" bearing stud walls - see sections. Insulate
SINGLE
with R-19 batts at bathrooms III between A/C and
4.
Non -A/C spaces
x 4'-2"
2" x 12" bearing stud walls - see sections. Insulate
HUNG
with R-19 batts at bathrooms & between A/C and
1 3'-1"
Non -A/C spaces
SINGLE
* top of wall height is clear span of block to bottom of first structural beam
This applies to the garage area only in this case.
K
Window Schedule
Mark
ESP aluminum windows with tint.
Size
mullions per
Window Description
I.
3'-I"
x 5'-3"
SINGLE
HUNG
2.
(3) 2'-6" x 3'-6"
FIXED
GLASS
3.
2'-2"
x 4'-2"
SINGLE
HUNG
4.
3'-1"
x 4'-2"
SINGLE
HUNG
5.
1 3'-1"
x C-4"
SINGLE
HUNG
- ALL Windows to be white
ESP aluminum windows with tint.
Provide muntin's and structural
mullions per
elevations. See
product approval chart for
window manufacturer information.
- ALL windows to withstand
Pressures stated
In Permit
Information Box on these
plans.
D
- ALL windows in bathrooms
to be tempered
E
- ALL windows within 18" of
finished floor to
be tempered
unless impact rated.
MDF
G
- verify all masonry/rough opening sizes prior
to ordering
windows.
2'-8" x 8'-0"
MDF -POCKET
Door Schedule
Mark
Size
Door Description
A
C -O" x 8'-0"
FRENCH DOORS
B
6'-0" x 9'-0"
CUSTOM FRENCH DOORS
C
3'-0" x 8'-O"
SOLID CORE - WOOD
D
3'-0" x 8'-0"
MDF
E
2'-8" x 8'-0"
MDF
F
2'-6" x 8'-0"
MDF
G
(2) 3'-0" x 8'-0"
MDF - Surface MTD Doors
H
2'-8" x 8'-0"
MDF -POCKET
J
2'-6" x 8'-0"
MDF -POCKET
K
8'-0" x 8'-0"
SLIDING PANEL DOOR
L
24'-0" x 10'-0"
POCKET SLIDING GLASS DOOR
M
20'-0" x 8'-0"
GARAGE DOOR
N
2'-8" x 8'-0"
20 MIN. FIRE RATED DOOR
P
3'-0" x 8'-0"
FRENCH DOOR
0
24'-0" x 8'-0"
POCKET SLIDING GLASS DOOR
- ALL exterior doors including garage doors to withstand
pressures stated In permit Information box on these plans.
- verify all masonry/rough opening sizes prior to ordering
windows.
- See product approval chart on these plans for exterior
door manufacturer information (including garage door)
Provide one exit door (swing type) that Is 3'-O" wlde
minimum and one emergency escape door (not shuttered).
If escape door has glazing then it must be impact resistant
and shall NOT be thru garage. This may be the same door
if it meets both criteria listed above.
.. °
N CV
O LL -
NC -4
� I
CV
QL
�CA
a � 3 V U
�C QUQ Tu
Q v U
0Z
U
WLL
U
o � �
co
U
0 73
n�
V �
Q� <
N
(L L w
w� 6°
O
zW �ILD 00�U o
< > NN O
ti I 4
Z
N C,4 #
Wch
~ w � X — -1
L U to LL +J
d)
J-1--1 v Q
.,--)
to
n�
�.l
mL
SHEET NO:
0
OF 21.
JOB NUMBER:
I9-207
I oOQ���Q��°°
O c
oa 0
R.
Digitally signed ° o o°®°���®�*°oo
by Daniel Braden d -moo �����®
/ °oma
Date: 2020.05.11 °�°°°°o°°° °°o c
°�� �0
�o.�QGD°p� . 0
09:56:14 -04'00'
O
O
C -I
F-42 C -I
I
F_ 0 _
o0
L
I SB -5
I
I
I
100
I
z I
I
I
I
I
I
I
Provide (3) filled cev'5'
for beam connection
above 1
I
I
L T
I
I
IRR
ump I
I
I
I
I
I
I
I
I
25,_0„ l'-4
F-60 C-1
F-42 r --- I -- 1 F-42 C-1 F-42 C-1
oJ-- I - -------------_O
------------------------------IOI
_g _8------------T-- -------_g---
TT.,
I
SB -5 L _ _ _ _ SB -5 - - - J SB-5ul
SB -5
SB -5
I
4" concrete slab with fibermesh OR p I
6"x6" #10/10 WWM on 6 mil Visqueen over - I
clean compacted termite treated fill `n
8" 32'-2" 23'-3"
Total height j
Charge Verify recess for
N SGE) track in field C-3 00
C-3
911. prior to placing slab 1
r- -------1 4AZ r - - - - - -- - I H.B. 1
-------------� I ` I I ------------------------------
-I --------------- �. +
�0 00 00 0 0 0 "I ;r -' _:�-------T----------------T------�- _- - - o 00 00 0 0 ©o
- - -
- -�-�- -1 I T -12A �_._� 1 �_�_ _
---------24S ------------- --1-- 1
I F -24S1 II1 F -q4 I I I I F-94 I--------- �-245 1 ---------- I I
I �Z -I- ------ -J '-- ------ -� I I
mW
1 0 1
1 28'_0„ N M,
S�_5 24'_0„ 1 SBS 28'_0„ N 1
tun - ----------1-----------1-- ---------- - - s.c.J. N1 1
Icv-
----------- - - - - --------------------+
U_ ° 1
ILL
o SB -I 1
I I I I I 1
� I I SLAB FFE = 28.38' NAVI� I I I S I
LL
I I
2�,_3„ 1 24,_2„ 2�,_3„ I o
w ---1----------- s.c.J.
------------------------ - ----- --------------------------
1 4" concrlete slab with fibermesh OR I co I I
1 61'x6" #10AP WWM on 6 mil Visqueen overt I I
*1F
colpatted termite treated fill I C-
SB74iF-48 SB-4SB 4center of footin SB41 F-48 L61
I �
61 01 �I �I 1 1 j -I
O O
1
N
� Slab Bar Schedule �
Mark
SIZE
x
Y
z
T e
Spacing
Notes
SB -I
#4
48"
T-12
Thicken slab edge to 12"w x 9"d with (2) 45 bar cont.
Standard
Upturn Bar
32" o.c.
Tie to vert. wall steel
16"d concrete monolithic footingwith (2) 45 rebar
transverse bars at 32" o.c. bottom)
continuous
SB -2
44
16"d concrete stem wall footing with (2) 45 rebar
transverse bars at 32" o.c. (bottom)
48"
48"
"Z" Bar
32" o.c.
Verify step depth
F -24S
SB -3
#4
F -25M
48"
24"
"Z" Bar
32" o.c.
Verify step depth
36"1 x I6"d concrete pad footing with 45 rebar
steel.
SB -4
44
94"
42"1 x 16"d concrete pad footing with 45 rebar
steel.
at 8" o.c. max. each
Flat Bar
32" o.c.
Center bar on center of
bearing wall
at 8" o.c. max. each
F-60
SB -5
44
48"
F-94
94"w x
bottom
Flat Bar
32" o.c.
Center bar on center of
bearing wall
SB -6
#4
48"
48"
"Z" Bar
32" o.c.
Verify "Z" an le in field
with slope in foundation
SB --1
44
12"
Flat bar
24" o.c.
Tie to vert. wall steel
ch
SB -8
44
12"
Flat bar
24" o.c.
Tie to vert. wall steel
� X-1
,�
Standard
Upturn Bari
32" o.c.
Tie to vert. wall steel
I
4
X
STANDARD SLAB BAR
Y Z
House Slab
Porch
V enf
each location Slab
"Z" BAR EQUAL OR UNEQUAL LEG
Verify
each location
x
BARS IN STEPS l J�,
x
N
STANDARD HOOK BAR
x
iv
—
STANDARD UPTURN HOOK BAR
CV
Pn;Pru Al AR A7ANr)6r2r) unnk RAP
(Where applicable — Flat bar also acceptable)
ALL SLAB BARS SHALL BE INSTALLED IN THE MIDDLE OF THE SLAB
TIE ALL STANDARD HOOKS TO VERT. STEEL IN WALLS UPTURN
Verify rough op ning
size for filled c II locations
L_-F-I6M-----
---- - - - - ------- - - - - ------- - - - - -- I 1
-- -------
-------- - - - - -
- --
0
j 4" concretf slab With fibermesh OR_36L I
--J 6"xC #10/10 WWM on 6 mil Visqueen over `t 0 r'
clean comp�cted termite treated fill 1 I o I
1 v7
10 1 1 cn !L I o
15 2 N
------F-?4S -- --1 F -24S ° F
v r F -116M ------- ------ -1- -------------� ----- - -- ----' O
I�------------
I--I------------------
N
co �r
r
I �
I O I
O O Oft kX
&aD O O O DO I -- -- ----XX
XX
-XX
XX
3M 0
- -'#�C
a.� W.H. W.S.
r----- - --- - -- �-----_ ---- - -- ---- - -----� I � d Ha fro
NCeilin Panel PaBnel PC el I
1 I I
water
F-36 l � � 'q -r -�-31 I �0� _ _ ,r_ _ _ _ _ I s.c.J.
— — — — — — .0 —
LO
I I 00 I40-__ 00 I I I
r n _AL_F- 65 — r�rn L -- - =I6S _� 11L
II F----- — ---------=t-- ---= --
FRONT FRONT I I N C Q. r O
F-2511 LOAD LOAD
— — — — — — — — — WAHER SDRYER
-T- - T +1 N a
0 1�
--- -a--- --- XF
----------
9 _ L�_
a
e I
� I 1
1
I O_
t6 I m
I 1
_NI`po
4" concrete slab 6th fibermesh OR i I N
4"x6" 410/10 WWM In 6 mil Visqueen over I—
— — sle�n �ompac3�d_,eemlte _"t€d LiLI — — — — — — rn
I�103
1 SLOPE 2" i o
I I
itjl 1
I I I
I I I
I I 1
I I I
IoI I
I I 1
I 1 22 l-8
l I F -36S I i
o
O I
101 I
I I F -16S I 0D
O------------------------- -- - - - - -• O I cv
1 1
O©----0--- O©—i i i-----0 00 -- 0 I
.B.
9,_0„
OWNER SPECIFIED
DRIVEWAY - SEE
SURVEY BY OTHERS
32'-O"
O O1 I IE)l 1 10 1
cli I I
- I I
I � I
IJ O 1
0 1
I 0 I F -36S 1
0 I
L_ �_
I ul
1 �I
I
S.C.J.
------ - - - - -- ------
O 1 4" concrete slab wits fibermesh OR
61'x6" #10/10 WWM on � mil Visqueen over
clean compacted ter ite treated fill
I m I I
LI I I
° N SLOPE 2" 1 O 1
I I
0
°1I f -
I I
o
1 jl 1
1 >L1o1
--- S-- -- —
I
I I I
I I I
I101
22,1 8„
r I I I
o I F -36S
I I
°p o I F -116S - - I I
O'-------------- 1 -------- - - - - -JOI
OD I I 1 O OO iiiiii00 O 00I
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ J
q,_0„
24'-O"
FOUNDATION FLAN
Column Schedule
Mark
Footing Schedule
C -I
Mark
C-2
Size and Description
C-3
T-8
Thicken slab edge to 8" x 8" with (1) 45 bar cont.
HSS 5" x 5" x 5/16"t tube steel column
T-12
Thicken slab edge to 12"w x 9"d with (2) 45 bar cont.
F -114M
16"w x
and 45
16"d concrete monolithic footingwith (2) 45 rebar
transverse bars at 32" o.c. bottom)
continuous
F-I6S
I6"w x
and 45
16"d concrete stem wall footing with (2) 45 rebar
transverse bars at 32" o.c. (bottom)
continuous
F -11M
16% x
22"d concrete stem wall footing - See detail on
sheet 0-1
F -24S
24% x
and 45
16"d concrete stem wall footing with (3) #5 rebar continuous
transverse bars at 32" o.c. (bottom)
F -25M
24"w x
22"d concrete monolithic footing see section E
on 0-4 for steel req.
F-36
36% x
bottom
36"1 x I6"d concrete pad footing with 45 rebar
steel.
at 8" o.c. max. each
F-42
42% x
bottom
42"1 x 16"d concrete pad footing with 45 rebar
steel.
at 8" o.c. max. each
F-48
48"w x
bottom
48"1 x 16"d concrete pad footing with 45 rebar
steel.
at 8" o.c. max. each
F-60
60"w x
bottom
60"1 x 16"d concrete pad footing with 45 rebar
steel.
at 8" o.c, max. each
F-94
94"w x
bottom
48"1 x 16"d concrete pad footing with 45 rebar
steel.
at 8" o.c. max. each
Column Schedule
Mark
Size and Description
C -I
16" x 16" concrete block column with (4) 45 bars vert. (One bar in each cell)
C-2
HSS 3.5" x 3.5" x 1/4"t tube steel column
C-3
8" wide concrete column - see detail on this sheet
C-4
HSS 5" x 5" x 5/16"t tube steel column
FOUNDATION NOTES: SCALE: I/4" = I' -O"
I. Any changes to plans must be submitted to the architect
for approval before proceeding with construction.
2. Contractor shall be responsible for verification of all notation and dimensions
prior to start of construction.
3. ALL Concrete used for slabs shall be 3,000 PSI concrete min., and
ALL Concrete used for vertical filled cells, continuous. tie beams etc.. to
shall be 3,000 P.S.I. concrete and/or 4,000 P.S.I. grout mix min.
4. Soil conditions assumed to be 2500 psf and stable. This shall be confirmed
bg soil borings which shall be provided In writing to this firm bg owner/ contractor
prior to start of ang construction.
5. Verifg all recess thickness at shower floors, all floor finishes as selected bg
owner, door sills � thresholds etc..., prior to placing ang slabs.
6. Contractor to provide filled cell with concrete and I #5 bar vert, at 48"
OX, max. Provide (1) filled cell On each Side of openings up to 5'-11" Wide.
Provide (2) filled cells on each side of openings from 6'-O" to 9'-11"
and Provide (3) filled cells on each side of openings from 10'-0" and up
Contractor to see plans for ang other condition used. Foundation Walls
shall have filled cells at 24" o.c. unless otherwise noted (see section)
7. Contractor to provide for Form Board Surveg - Form Board Surveg
to be provided to Truss Compang prior to truss construction
8. ALL Reinforcing steel shall be grade 60, meeting ASTM A-16 and
A-35 specifications. ALL Anchors to be A-301 steel.
9. Provide a minimum of 3" concrete protection at footings and
1-1/2" concrete protection at beams for ALL reinforcing bars.
10. Contractor to provide the Architect with truss shop drawings including
ALL truss cut sheets showing ALL truss reactions prior to START
OF FOUNDATION WORK for strap and footing size verification.
Termite Protection for New
Construction as per F.B.C. 181L1
CONTRACTOR TO REFERENCE F.B.C.
BUILDING 1816.1 FOR FURTHER REQUIREMENTS
Soil treatment used for subterranean termite prevention
Inside the foundation perimeter shall be done after all
excavation, backfilling and compaction is complete.
If soil area Is disturbed after Initial chemical soil treatment,
area shall be re -treated With a chemical soil treatment
Including spaces boxed or framed.
Treatment must be In accordance with the rules and laws
established bg the Florida Department of Agriculture and
consumer services.
Protective sleeves around piping penetrating concrete
slab on grade floors shall not be of cellulose -containing
materials and shall have a min. wall thickness of 0.010"
and shall be sealed within the slab using a non -corrosive
clamping device to eliminate the annular space between
Pipe and sleeve. NO 7ERMICIDES shall be applied
Inside the sleeve per FBC Plumbing 305.1.2
5-8-20
Soil compaction shall adhere to recommendations stated
in soil report bg KSM Engineering report # 200098.
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:55:33 -04'00'
� O
� N U
> L O
Q �`Q
}
� (z
z� p
d) �OONU
C 1 CV CV 1 N
ori Im1
`n CV CV pp
> I I I I I
CA m mmLo
a CV
' Jv
-0
Q 'q-
B V U
QUQ
Q
U
O
LL
0)
LL
LH
U
SHEET NO:
OP 21.
JOB NUMBER:
I�1-20�
'ou�Q........
oD
o°° O c
® SSL R. BRAD
o"
1� o° Aft 9770 °o
° 000
C �.(1°°°/o°
L0
N
ft
W
O
ZW
OC)
O
Lo OD U
O
<
Cv N
1.L
L
0c) OD IU
#
I
Z
CV CV
13
Uj
ch
~
w
� X-1
,�
4
.,--)
N
SHEET NO:
OP 21.
JOB NUMBER:
I�1-20�
'ou�Q........
oD
o°° O c
® SSL R. BRAD
o"
1� o° Aft 9770 °o
° 000
C �.(1°°°/o°
Soffit heigf
on 24" spa
counter anc
upper cabin
with final c+
by others
FfFS7 FL00F CEILlNG-; �=LAN
SCALE 3/16" = 1'-0"
ssed roll
s per mfg
FIELD VERIFY ALL DIMENSION AND INSTALL
ROPE LIGHT SO FIXTURE IS NOT VISIBLE
Scab 2" x to trusses
for molding installation
LED Rope Light
Owner specified crown
Drywall to rema1n cont.
and wrap around 2"x
TYF. COVE LIGHTING SECTION
NTS
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:54:57 -04'00'
SEE COLUMN CONNEC•
DETAIL A ON SHEET I
Provide owner specified tile on thinset
and 3*4 bars at 12'7' o.c. each
way top steel.
Southeastern Metals 24 ga 5v Crimp Metal Roofing Installed
per product approval FLtt 11175.1 over Polyyglass self adhered /
roofing underlagment over 19/32" CDX plgwood attached
to trusses per sheeting attachment diagram on roof plan
\PRE—ENGINEERED ATTIC STORAGE
TRUSSES AT 24"o.c. TYPICAL
( shop drawings bg manufacturer )
Bottom Chord to have min 201b live load.
MAXIMIZE STORAGE AREA OVER GARAGES
SECOND FLOOR FRAMING/LOUDER ROOF PLA\
TYPICAL NOTES:
— ALL Plywood sub—flooring to be saturated w/ Thompson IS
water seal immediately of ter Installation for leak protection.
- Overhangs at 2'-0" unless otherwise noted on this sheet
- Roof pitch at x:12 unless otherwise noted
- Truss shop drawings to be provided by manufacturer
- ,Aney changes to this plan Shall be submitted to the
architect for apbroyal In writing brlor to starting construction
O
L31 BI
12 2' -3
xAccess6'
i
"A"
Bars
2'-10"
(y
2'-8"
122'
with light
1'-6"
Q
2,tt3
Max
W
Max
-4"
I—
BI
2
Gravitg
2
2
Mark Unit
2'-8"
Cast -Crete Above Bottom Top
Size
2,43
Load
12
12 1 12
12
3'-2"
Specification Steel Steel
3 SLOPE
5 SLOPE SLOPE 5
SLOPE Is
5'-2"
L20 2'-0'
4'-0"
3 SLOPE
BI L200
,
1569
1642
2'-2'
L200 BI
B6
8" x 16°
N
2
#5
L31 2'-1.'
V-9"
BI
u5
w
1363
l'
-O"
6'-2"
o
2,45
#5
W
7'-10"
d)
T
;: O
2
4.000 psi
um mix
B8
g" x 12"
n
5'-1'
81`8-OBAT NO — 1
C4
1349
1011.
411
1_50 5'-0'
BI
8F8-OBAT NO — 1
d
BI
909
L8
1_40 G'-8"
BI ~
8F8-OB/IT NO — I
u5
d)
727
2
LSO T -O'
HE
A 2
45
1011
and 3*4 bars at 12'7' o.c. each
way top steel.
Southeastern Metals 24 ga 5v Crimp Metal Roofing Installed
per product approval FLtt 11175.1 over Polyyglass self adhered /
roofing underlagment over 19/32" CDX plgwood attached
to trusses per sheeting attachment diagram on roof plan
\PRE—ENGINEERED ATTIC STORAGE
TRUSSES AT 24"o.c. TYPICAL
( shop drawings bg manufacturer )
Bottom Chord to have min 201b live load.
MAXIMIZE STORAGE AREA OVER GARAGES
SECOND FLOOR FRAMING/LOUDER ROOF PLA\
TYPICAL NOTES:
— ALL Plywood sub—flooring to be saturated w/ Thompson IS
water seal immediately of ter Installation for leak protection.
- Overhangs at 2'-0" unless otherwise noted on this sheet
- Roof pitch at x:12 unless otherwise noted
- Truss shop drawings to be provided by manufacturer
- ,Aney changes to this plan Shall be submitted to the
architect for apbroyal In writing brlor to starting construction
O
Bar
Length
122" 54'
"A"
Bars
2'-10"
2'-8"
Window
1'-6"
Aece with ligh
End pu down stairs
2,tt3
Max
W
Max
-4"
2'-2"
Stressed BM Block
2
Gravitg
Uplift
3'-10"
Mark Unit
2'-8"
Cast -Crete Above Bottom Top
Size
2,43
Load
Load
Load
Width
3'-2"
Specification Steel Steel
ZI
12 12
12
5'-2"
L20 2'-0'
4'-0"
3 SLOPE
5 SLOPE SLOPE 5
SLOPE
1569
1642
2'-2'
L200 BI
B6
8" x 16°
Tie ncrete Beam
2
#5
L31 2'-1.'
V-9"
BI
u5
2561
1363
l'
-O"
6'-2"
Tie nBeam
2,45
#5
7'-10"
2
T
-O"
2,45
4.000 psi
um mix
B8
g" x 12"
L45 4'-5'
5'-1'
81`8-OBAT NO — 1
u5
1349
1011.
411
1_50 5'-0'
5'-8'
8F8-OBAT NO — 1
u5
1105
909
339
1_40 G'-8"
G' -e'
8F8-OB/IT NO — I
u5
d)
727
534
LSO T -O'
T -O"
8F8-OBAT NO — 1
45
1011
121
N
1_80 8'-0'
8'-8'
8F8-OBAT NO — I
u5
1.99
591
512
BI
�
8F8-OBAT NO — 1
w
535
BI
401
1_100 10'-0'
10'-8"
8F8-OBAT NO — 1
u5
582
BI =
452
TA
20
8FIL-IBAT NO ONE I u5 1
u5
L8
410 1
402
L120 12'-0'
Scale: 1/4" = 1'—O"
- ALL TRUSS TO TRUSS CONNECTIONS BY TRUSS MANUFACTURER
- Architect to review Truss Shop Drawings Prior
to construction for lagout and uplift verification
- Provide fire stop blocking at all floor trusses dividing the floor
area into 500 sq. ft. (Max.) spaces
Additional
45 bars
COVER
Precast Lintel
'`— --10
8F8-OBAT
Additional
- tt5 bars
CLEAR
COVER Ona Row of Beam
Block Above
rPrecast Lintel NLA7
�✓ � Haaiuonai � `i i
t----�
45 bars s----�
BFIL-IBAT 8FIL-IB/2T
NOTES:
I. MIN. COVERAGE OF STEEL - 1.5"
2. MIN. BEARING REQUIRED ® EA. END = 4"
S. STANDARD FOR REINF. STEEL = ASTM A615 GRADE
TYPICAL LINTEL SECTION
( PRECAST CONCRETE )
Lintel
Length
Bar
Length
Clear
Span
"A"
Bars
2'-10"
fastener
2'-8"
Window
1'-6"
Pre- Rows of
2,tt3
Max
Max
Max
-4"
2'-2"
Stressed BM Block
2
Gravitg
Uplift
3'-10"
Mark Unit
2'-8"
Cast -Crete Above Bottom Top
Size
2,43
Load
Load
Load
Width
3'-2"
Specification Steel Steel
2,43
5'-4"
(PLF)
5'-2"
L20 2'-0'
4'-0"
8F8-OB/IT NO — I
2,43
3069
1569
1642
2'-2'
4.000 psi
um mix
B6
8" x 16°
Tie ncrete Beam
2
#5
L31 2'-1.'
V-9"
8F8-OBAT NO — 1
u5
2561
1363
l'
-O"
6'-2"
Tie nBeam
2,45
#5
7'-10"
2
T
-O"
2,45
ALL reinforcing steel is grade 60.
111311
Bars
none
none
none
none
none
none
none
none
none
FLIP COLUMN CONNECTION
DETAIL A ON SHEET D-5
FOR THIS CONNECTION
Tgpical flooring over 15/32" COX plgwood screwed to
trusses or ,foists thru 23/32" COX plywood sub -floor.
nstall 15/32" plywood with #8 x 2.5" wood screws at 4" o.c.
max, spacing over 15 Ib felt. Install 23/32" COX plywood
screwed and glued to trusses or ,foists with tt8 x 2' screws
It 12" O.C.
ARE—ENGINEERED 24" DEEP FLOOR
TRUSSES AT 24" O.C. TYPICAL
'shop drawings by manufacturer)
See tgplcal section
for Wall finish notes
Ledger LGI �
see ledger schedule
TRUSS BRACING NOTES
Contractor to brace all top and bottom chords in Floor
and roof trusses in the following manner:
- install first row of truss bracing 34" from exterior walls
and spaces -12" o.c. thereafter top and bottom chords
- install bracing on any top or bottom chord which is longer
than 12' in clear span.
All truss bracing to be 2" x 4" wood and shall be attached to
top of bottom chord and on bottom of top chord of trusses.
•usses spaced per truss
nufactures plans
1pical splice
ttach bracing to truss chord
iing (2) IOd nails in all
cations
" x 4" wood bracing
STRAPPING SCHEDULE
HETA 20
HETA 20
SIMPSON HETA 20 hurricane
anchor at each truss supporting
Max. 1,810 lbs. uplift. Strap shall
have (9) IOd x 1 1/2" nails.
Area
LINTEL SCHEDULE
Meld
Top Steel
AMOUNT
fastener
Pressure
Window
I
Pre- Rows of
Stirrup
SIZE
Max
Max
Max
or D
Zone
Stressed BM Block
�"
Gravitg
Uplift
Lateral
Mark Unit
Lintel
Cast -Crete Above Bottom Top
Size
Size
Load
Load
Load
Width
Size
Specification Steel Steel
** Zone 3a
(PLF)
(PLF)
(PLF)
L20 2'-0'
T-10'
8F8-OB/IT NO — I
u5
3069
1569
1642
2'-2'
4.000 psi
um mix
B6
8" x 16°
Tie ncrete Beam
2
#5
L31 2'-1.'
V-9"
8F8-OBAT NO — 1
u5
2561
1363
111.3
2'-8'
8" x 16"
Tie nBeam
2
#5
2
#5
43
24"
4.000 psi
um mix
B8
g" x 12"
L45 4'-5'
5'-1'
81`8-OBAT NO — 1
u5
1349
1011.
411
1_50 5'-0'
5'-8'
8F8-OBAT NO — 1
u5
1105
909
339
1_40 G'-8"
G' -e'
8F8-OB/IT NO — I
u5
1011
727
534
LSO T -O'
T -O"
8F8-OBAT NO — 1
45
1011
121
534
1_80 8'-0'
8'-8'
8F8-OBAT NO — I
u5
1.99
591
512
L90 9'-0'
9'-8'
8F8-OBAT NO — 1
#5
535
530
401
1_100 10'-0'
10'-8"
8F8-OBAT NO — 1
u5
582
414
452
LIIO 10'-0'
ll' -8'
8FIL-IBAT NO ONE I u5 1
u5
1254
410 1
402
L120 12'-0'
12'-8'
8FIL-IB/IT NO ONE 1 u5 1
u5
1015
LOL
324
L140 14'-0'
14'-8'
BFIL-IBAT YES ONE 1 85 1
u5
1310
519
284
LILO I1.' -O'
IL' -8"
81`16-I15/2T YES ONE 1 u5 2
u5
950
500
194
LI80 IL' -O'
18'-8'
8FIL-IB/2T YES ONE 1 u5 2
u5 1
150
424
148
L200 IL' -O'
IS -8'
BFit.-IB/2T YES ONE 1 u5 2 1
u5 I
598
31.9
125
- ALL LINTELS SHALL BE MADE BY CAST -CRETE.
- LINTELS
SHALL
BE FILLED SOLID WITH 3000 PSI CONCRETE
- REFER TO
CAST -CRETE CATALOG FOR ALL INFORMATION
REGARDING
LINTEL CONSTRUCTION, HANDLING INFORMATION, AND SAFE
LOAD REQ.
REQUIREMENTS
- LINTELS
OVER
13' -II" LONG ARE TO BE PRESTRESSED.
- CONTRACTOR
TO VERIFY ALL LINTEL SIZES BASED ON FINAL
MASONRY
OPENING
SIZES
AND ADJUST LINTELS ACCORDINGLY PRIOR
TO ORDERING
ANY/ALL
LINTELS
FLIP COLUMN CONNECTION
DETAIL A ON SHEET D-5
FOR THIS CONNECTION
Tgpical flooring over 15/32" COX plgwood screwed to
trusses or ,foists thru 23/32" COX plywood sub -floor.
nstall 15/32" plywood with #8 x 2.5" wood screws at 4" o.c.
max, spacing over 15 Ib felt. Install 23/32" COX plywood
screwed and glued to trusses or ,foists with tt8 x 2' screws
It 12" O.C.
ARE—ENGINEERED 24" DEEP FLOOR
TRUSSES AT 24" O.C. TYPICAL
'shop drawings by manufacturer)
See tgplcal section
for Wall finish notes
Ledger LGI �
see ledger schedule
TRUSS BRACING NOTES
Contractor to brace all top and bottom chords in Floor
and roof trusses in the following manner:
- install first row of truss bracing 34" from exterior walls
and spaces -12" o.c. thereafter top and bottom chords
- install bracing on any top or bottom chord which is longer
than 12' in clear span.
All truss bracing to be 2" x 4" wood and shall be attached to
top of bottom chord and on bottom of top chord of trusses.
•usses spaced per truss
nufactures plans
1pical splice
ttach bracing to truss chord
iing (2) IOd nails in all
cations
" x 4" wood bracing
STRAPPING SCHEDULE
HETA 20
HETA 20
SIMPSON HETA 20 hurricane
anchor at each truss supporting
Max. 1,810 lbs. uplift. Strap shall
have (9) IOd x 1 1/2" nails.
Ke
Area
Edge
Meld
Top Steel
AMOUNT
fastener
Pressure
Zone
I
Bottom Steel
SIZE
Stirrup
SIZE
8d
ring
j Q
w 101,01% �������
4 VA OVA ♦����WA10% ♦ Q
E� A MA���OWWW�Ui�A�AOVA14
Zone
l � "AN ������������
•♦♦♦•♦♦♦•♦•♦•♦•♦•♦•Q♦INWEM,♦•♦•♦•♦•♦•♦♦
�"
6"
lid��►r••
ring
shank
�6 psf
Zone
3
�"
�"
8d
ring
shank
84 psf
** Zone 3a
6"
6"
#8
wood
screw
112.5 psf
4
#6
#3
10"
4.000 psi
um mix
B6
8" x 16°
Tie ncrete Beam
2
#5
2
#5
Ke
Area
Edge
Meld
Top Steel
AMOUNT
fastener
Pressure
Zone
I
Bottom Steel
SIZE
Stirrup
SIZE
8d
ring
shank
45 psf
Zone
2
�"
6"
8d
ring
shank
�6 psf
Zone
3
�"
�"
8d
ring
shank
84 psf
** Zone 3a
6"
6"
#8
wood
screw
112.5 psf
BE,4M SCHEDUL�z-
Mark
SIZE
(wxh)
BEAM
TYPE
Top Steel
AMOUNT
Top Steel
SIZE
Middle Steel
AMOUNT
Middle Steel
SIZE
Bottom Steel
AMOUNT
Bottom Steel
SIZE
Stirrup
SIZE
Stirrup
Spacing
Concrete
Strength
BI
(2) rows of beam block filled solid with concrete and (1) #5 bar cont. in each row
`1.000 pal
um mix
B2
W16x36 Steel Beam 5OKS1
B3
W24x55 Steel Beam 5OKS1
B4
16" x 24"
crete
Tie nBeam
4
48
3
45
4
48
#3
10"
4.000 psi
um mix
B5
16" x 16"
Tie ncrete Beam
4
#5
4
#6
#3
10"
4.000 psi
um mix
B6
8" x 16°
Tie ncrete Beam
2
#5
2
#5
#3
8"
4,000oumo psi
B1
8" x 16"
Tie nBeam
2
#5
2
#5
43
24"
4.000 psi
um mix
B8
g" x 12"
Fie ncreteBeam
2
45
2
45
#3
8"
4.000 psi
Um mix
B9
8" x 16"
iTie ncreteBeam
2
45
2
46
#3
6"
4,000 psi
um mix
BIO
(1) row of beam block filled solid with concrete and (1) #5 bar cont.
BII
(2) 2" x 12" SYP 42 HEADER
B12
1(3) 1.15" x 16" LVL 2.OE Fb = 2600 psi — LAMINTAED WOOD BEAM
SEE BEAM DETAILS ON SHEET D-5
Typical Mooring on 3/4" CDX plywood sub -flooring
screwed and glued to floor trusses. ALL plywood
sub -flooring to be saturated with Thompson's
water seal Immediately after Installation for leak protection
base board Provide Simpson H2.5 strap
Q� at each floor ,foist to ledger connection
18" deep Top Chord Bearing
floor trusses at 24 o.c. typical
5/8" Drgwall
see beam schedule
3" mineral wool batts
Floor Truss to Block LUall /ttachment Detail
nts
Tgpical Flooring on See wall Section
/Floor Joists for Details
( see framing plan ) � �f�_
-----T---T ---� 'C ---Z\ T-- T
----------------------------\\� '--------
5/8" drgwall 1/2" COX plywood nailed to ,foists with bd
nails at 6" o.c. edges t 12" o.c. intermediate
DR AFTSTOPPING DETAIL
scale 3/4" = 1'-0"
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:51:48 -04'00'
T H R U
12
3 SLOPE
— S E C T
12
SLOPE
o N U
- S E C T I O N u 2
5CALE: I/9" = I'—O"
12
---+�------*�-----'�,-___ SLOPE 3
LL -� -
rte, I --
I �
I II II
I II II i
I II II ,
; II II
I II II
II II ,
II II
I II II ,
— ——r-�T-------T-------iT-------ir-------iT-------iT-------iT
II II II II II II
, II II II II II II II
\
°
O
A V T F— R
Ir��
�
U
II II II II
I I I I I I I
, II II II II II II II
II
I I
II
II �___
(Y
O
II
II II
I
_ _
-Tr_,_
I II II II II II II II
II
II II
- S E C T I O N u 2
5CALE: I/9" = I'—O"
12
---+�------*�-----'�,-___ SLOPE 3
LL -� -
rte, I --
I �
I II II
I II II i
I II II ,
; II II
I II II
II II ,
II II
I II II ,
— ——r-�T-------T-------iT-------ir-------iT-------iT-------iT
II II II II II II
, II II II II II II II
\
B Q
I II II II II II II II
II II II II II II II
II II II
Ir��
�
U
II II II II
I I I I I I I
, II II II II II II II
II
I I
II
II �___
(Y
II II II II II II II
II
II II
I
_ _
-Tr_,_
I II II II II II II II
II
II II
II - _
-,T___
-
, II II II II II II II
I II II II II II II II
C__u-------u-------u-------u-------u-------u-------u-------u-------u-------u--_----u-------u-------u--------i
II
II
II II II II _ _
II II II II II � - _ _
LJ LJ LJ LJ LJ
LJ LJ
H
L--------------------------------------------------------
-----------
---------------------�J
I
I
I
---------------------------------------------------------------
i -- i
I I III III III III III III III III
____
Ir, _. -
III III
I�____ �.�
III III
Irr_____�
III III I I ,
I I III __ III III _____ III III III III _____ III
III III
III ___ III
III III I I
-=---�1j-----jq i�==---
I III III III III III III III
IF-----.yi--_--
III I II
III III
_-
1---=-
III III I
4
r r
________s______ -s___4
_-___-ro In--__ -ro In.-- o
� I III III III III III III III III
I ll
III III
1 ---=-
III III
I 11
III III I I I
I I III III III III III III III III
III III
III III
III III I I I
SII
II i i III II III II III II III
III =�
II III
III jl
II III
III
II III
SCALE: 1/4" = 1'-0"
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:50:57 -04'00'
'J
(a
B Q
4--) N
�
U
SHEET NO:
T3-1
OF 13.
JOB NUMBER:
I9-201
fo�.o��0000aoo 000 �G�
o
o�
® *P -L R. BRAD
o
® _ 0
o
?� a AVS 9760 4�
0
a
a o
N
rn
(Y
W
Z
W
z
W
Ln ao
CA IN
06 00
<
p—
r r
z
0000
#$
1
N N
a-
-Q
�3
~W�x-1
N
SHEET NO:
T3-1
OF 13.
JOB NUMBER:
I9-201
fo�.o��0000aoo 000 �G�
o
o�
® *P -L R. BRAD
o
® _ 0
o
?� a AVS 9760 4�
0
a
a o
Filled Cell Masonry Column With One
45 From Footing To Beam.
Conc. FIII To Be 3000 PSI
See Floor Plan For Location
Single Filled Cell Column
NTS
Filled Cell Masonry Column With One
#5 From Footing To Beam Each.
Conc. FIII To Be 3000 PSI
See Floor Plan For Location
Double Filled Cell Column
NTS
S1
Bond E
(1) 95 bar
1n filled cell
ff.T.9171101-MVIR W...
2" x 6" FT wood secured With
1/2"dia. x 6" expansion anchors
with 2" sq. washer at 16" o.c.
-D Hook
(1) U5 bar vert.
1n filled cell
&s in Bond Beam H�iaht
overhead door track secured to wood
jamb per manufacturer's product approval
ALL GARAGE DOORS AS SPECIFIED IN PRODUCT
APPROVAL ON THESE PLANS. DOORS TO MEET
WIND PRESSURE STATED IN PERMIT INFO BOX ON
THESE PLANS
Garaae Door Jamb Detail
T 4" concrete slab with fibermesh OR
�I
I `� I S 6"x6" 410/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
48"
Thicken edge to 8"x8"
with concrete and
one #5 bar continuous
4" concrete slab with fibermesh OR
6"x6" #10/10 WWM on 10 mil Visqueen over
clean compacted termite treated fill
GRADE
m
T-8 FOOTING DETAIL
SCALE 1/2" = I' -O"
Recess for garage door - verify
depth with door MFG prior to
placing slab
Thicken edge to 12"x8" 4" concrete slab with fibermesh OR
with concrete and 6"x6" 410/10 WWM on 10 mil Visqueen over
Two 45 bar continuous clean compacted termite treated fill
GRADE
T-12 FOOTING DETAIL
SCALE 1/2" = 1'-O"
SEE TYPICAL
SECTIONS
MAX HEIGHT = 48"
O j
NO ROOF LOAD
TO BE PLACED HERE
Southeastern Metals 24 ga 5v Crimp Metal Roofing Installed
per product approval FLU 11115.1 over Polyglass self adhered 12
roofing underlayment over 19/32" CDX plywood attached 3 ISLOPE
to trusses per sheeting attachment diagram on roof plan
Simpson HTS strap at each truss
suppporting Max. 1450 lbs, uplift
(2�f) IOd x 1 1/2" nails in each strap
Galt' -Alum Metal drip on
I" x 8" Fascia on
2" x 6" Sub -Fascia 24"
O.H.
5/8" thick stucco on 3/8" hi -rib lath 7
attached to horizontal and vertical wood
framing with nails or staples to provide
no less than 1-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
42" high glass railing - shop drawings
provided by MFG. Railings
shall comply with FBC R312.1
Min. 2" clear gap below
bottom rail for porch drainage
Galv. drip on 2" x 8"
Fascia.
Stucco expansion ,joint
Simpson HETA 20 or equal
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails
( 24" o.c.) supporting Max.
1810lbs. uplift
Smooth finished stucco
capital and base
Smooth finished stucco
capital and base
C-1
double plate for door attachment
B12
Build down kneewall height as needed
using 2" x SYP 42 studs with Simpson
SP straps connecting all plate to studs.
Screw plate to trusses using (2) 1*10 x 3.25"
wood screws into each truss.
Size SP strap accordingly to each
stud size used
WALL BEYOND
Tile on torch Down
Step per framing plan
slope top chord
I" for drainage
V
Verify girder thickness and adjust
6, location so door can be installed
on exterior side
12
5 SLOPE
PRE-ENGINEERED ROOF TRUSSES
AT 24"O.C. TYPICAL
(shop drawings by manufacturer)
-20 Spray foam insulation
12" min I
5/8" drywall with smooth finish See light cove detail
on sheet 6
1/2" drywall over I" x furring
strips at 16 o.c. with R-5 rigid
insulation on typical 8" Block walls
All drywall is per FBC 102.3.1 and
shall meet all pertaining ASTM codes.
Mortar to be Tye "r' only.
Provide Dur -0 at air wet
areas (ex. showers, tubs etc...)
See Door Schedule
For Sizes
Drywall return
Typical flooring over 15/32" CDX plywood screwed to
trusses or ,joists thru 23/32" CDX plywood sub -floor.
Install 15/32" plywood with 48 x 2.5" wood screws at 4" o.c.
max. spacing over 15 Ib felt. Install 23/32" CDX plywood
screwed and glued to trusses or ,joists with #8 x 2' screws
at 12" o.c.
R-20 spray foam insulation
l PRE-ENGINEERED 16" DEEP FLOOR
- TRUSSES AT 24" O.C. TYPICAL
(shop drawings by manufacturer) �[
5/8" thick stucco on 3/8" hi -rib lath I
attached to horizontal and vertical wood
framing with nails or staples to provide
no less than 1-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
OFEN
Verify SGO recess with
door MFG prior to
slab placement
Step per foundation plan
Slope per slab plan
I11 iiia_
BEYOND
O
6-
12
-SLOPE 5
R-20 Spray foam in
PRE-ENGINEERED ROOF TRUSSES
AT 24"O.C. TYPICAL
(shop drawings by manufacturer)
5/8" drywall with smooth finish
I" x 3" PT furring
horizontal fire stop
1/2" dr wall over I" x furring
strips at 16" o.c. with R-5 rigid —
insulation on typical 8" Block walls
All drywall is per FBC 102.3.1 and
shall meet all pertaining ASTM codes.
Mortar to be Tye 01M11 only.
Provide Dur -0- at al
r wet
areas (ex. showers, tubs etc...)
See Door Schedule
For Sizes
Pour curb as needed for
fixed door installation
No additional steel req. if cur
height is less than 6". If over
I��i4Ntensirhstalltfil6n#0'.balf hmraonLl
12
SLOPE 3
IP •
C-1
Southeastern Metals 24 ga 5v Crimp Metal Roofing Installed
per product approval FL9 11115.1 over Polyglass self adhered
roofing underlayment over 19/32" CDX plywood attached
to trusses per, sheeting attachment diagram on roof plan
PRE-ENGINEERED 24" DEEP FLOOR
- ff-1
v
TRUSSES AT 24" O.C. TYPICAL O.
I/2 drywall over I" x furring
(shop drawings by manufacturer) 1
strips at 16" o.c. with R-5 rigid
insulation on typical 8" Block walls
All drywall is per FBC 102.3.1 and
shall meet all pertainingg ASTM codes.
"M"
1
a
3" mineral wool batts insulation at AC Space
i
i
Mortar to be Ty e only.
Provide Dur -O - lock
O
'
"
N
N
at alr wet
I/2 dr wall over I x furring
areas (ex. showers, tubs etc...)
Pre -cast Lintel
N
'. ....
strips at 16" o.c. with R-5 rigid
insulation on typical 8" Block walls
1 O O
See Roof plan for
details
fid:---=•_-
All drywall is per FBC 102.3.1 and
shall meet all pertaining ASTM codes.
"M"
Mortar to be Tye only.
Provide Dur -O -lock at al wet
16„
areas (ex. showers, tubs etc...)
areas
See Window Schedule
For Sizes
0
N
O
O
See Door Schedule
-
_
For Sizes
low
- ff-1
Section at rear Covered Porch
Typical Flooring on
4" concrete slab with fibermesh OR
6"x6" 1*10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
T -12A
Scale : 1/2" = 1'-0"
Simpson HETA 20 or equal
hurricane 0 x l/each
nais
( 24" o.c.) supporting Max.
1810lbs. uplift
I Galy-Alum Metal drip on
I" x 4" Drip on
I" x 8" Fascia on
2" x 6" Sub -Fascia
24"
O.H. Pre -Manufactured outlooker
5/8" thick stucco on 3/8" hi -rib lath
attached to horizontal and vertical wood
—fl framing with nails or staples to provide
no less than 1-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
42" high glass railing - shop drawings
provided by MFG. Railings
shall comply with FBC 8312.1
Min. 2" clear gap below
bottom rail for porch drainage
Slope Slab 1/2" toward street
6" Concrete slab with 95 bars
at 8" o.c. each way bottom steel
and 4,4 bars at 12" o.c. each
way top steel.
C-1
See Door Schedule
For Sizes
Typical Flooring on
4" concrete slab with fibermesh OR
6"x6" 410/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill T-8 -8
Step per foundation plan
/� Slope per slab plan
a a
F -2-4S _
BEYOND
Section at Covered Front F orch
-2 Scale : 1/2" = l' -O"
Smooth finished stucco
capital and base
Smooth finished stucco
capital and base
.. O
N � �
O r LL
N N
� N i -
AC �
QN
U
�r
� N Q (V W
Q
v U
W
n` U
V
W
U
O
U QO
N
� QJ
N
Q� <
N
OL (V w
Ul L o O
O
Z W oo til O
< > < N� O
OD 00
U
< <
Z0000
CV CA #*
0 CA CA
~O rr� cr
�73 wUm
~ LQ X-1
L U �LL
LL
N
4-3
q3
-Q
m�
J-1--1
SHEET NO:
D — 2.
OF 21,
JOS HUMBER:
19-207
Digitally signed o o°®���� �'®��
o°
by Daniel Braden a AR 9770
Date: 2020.05.11 0-0°°
09:49:44 -04'00' nam
"board
5sing
)re -hung pocket door
Typical Pocket Door ED&tai
Southeastern Metals 2-4 ga 5v Crimp Metal Roofing Installed
per product approval FLU 11115.1 over Polyglass self adhered
roofing underlayment over 19/32" CDX plywood attached
to trusses per sheeting attachment diagram on roof plan
Simpson HETA 20 or equal 12
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails 31 SLOPE
( 24" o.c.) supporting Max.
1810lbs. uplift
23'-O" T.O.B.
A.F.F. - - - �
Galt' -Alum Metal drip on k ;�
I" x 4" Drip on � l
I x 8 Fascia on 24"
2" x 6" Sub -Fascia
O.H.
5/8" thick stucco on 3/8" hi -rib lath
attached to horizontal and vertical wood
framing with nails or staples to provide
no less than 1-3/4" penetration into -
horizontal wood framing and 3/4" penetration O
into vertical wood framing members
5/8" thick smooth finished
stucco on typical concrete
block construction
Fill cell with concrete and
(1) 45 bar vert. (typical).
Max. spacing shall not exceed S E D
32" unless otherwise noted
see foundation plan notes For
spacing at openings
45 bar vert. w/
30" overlap
at each filled cell
14'-0" = Second Floor
A.F.F.
0
N
Sl AT SIDE WALLS
RUNNING FRONT
TO BACK
5/8" thick light textured
stucco on typical concrete
block construction
Fill cell with concrete and
(1) #5 bar vert. (typical).
Max. spacing shall not exceed
32" unless otherwise noted
see foundation plan notes For
spacing at openings
1*5 bar vert. w/
30" overlap
MAX HEIGHT = 48"
a Grade
>
o
LL �a
N
O
i
N
F -2-4S
NTS
R-20 Spray foam insulation
12
5 SLOPE
Typical Interior
PRE-ENGINEERED ROOF TRUSSES
AT 24"O.C. TYPICAL
(shop drawings bg manufacturer)
5/8"thick drywall finished
per room schedule
Typical Wall Reinforcement
see detail on sheet 0-2
1/2" drywall over I" x furring
strips at I(V o.c. with R-5 rigid
insulation on typical 8" Block walls
All drywall is per FBC 102.3.1 and
shall meet all pertaining ASTM codes.
Mortar to be Tye 11M71 only.
Provide Dur -O -Rock at alr wet
areas (ex. showers, tubs etc...)
Owner specified baseboard
Typical flooring over 15/32" CDX plywood screwed to
trusses or Joists thru 23/32" CDX plywood sub -floor.
Install 15/32" plywood with #8 x 2.5" wood screws at 4" o.c.
max. spacing over 15 Ib felt. Install 23/32" CDX plywood
screwed and glued to trusses or ,foists with 48 x 2" screws
at 12" o.c.
3" mineral wool sound batts
PRE-ENGINEERED 24" DEEP FLOOR
TRUSSES AT 24" O.C. TYPICAL
(shop drawings bg manufacturer)
5/8" thick drywall finished
per room schedule
Typical Wall Reinforcement
see detail on sheet 0-2
STORAGE
1/2" drywallover I" x furring
strips at 16„ o.c. with R-5 rigid
insulation on typical 8” Block walls
All drywall is per FBC 102.3.1 and
shall meet all pertainin�g ASTM codes.
Mortar to be Tyge "11" only.
Provide Dur -O -Rock at all wet
areas (ex. showers, tubs etc...)
Owner specified baseboard
Typical Flooring on
4" concrete slab with fibermesh OR
6"x6" 410/10 WWM on 6 mil Visqueen over
clean compacted termite treated Fill
� TYPICAL TWO-STORY SECTION
o -3J Scale : 1/2" = l' -O"
HOUSE SLAB
N
m
Sum Wallboard
ood casing
wood Suck
Note:
all doors
to be prehung
Door [D&tai
NTS
#5 bar vert.
at filled cell Typical Masonry Wall
3/B
El 10 ��p ❑0❑❑❑
6"
Control Joint Extend ,joint reinforcing
at 30'-0" max. into concrete column
PLAN VIEW PLAN VIEW
AT ALL/ANY CONTROL JOINTS
Typical Masonry Wall
N
m
32"
32"
Provide Prefabricated Provide Prefabricated
"T" Joint Reinforcing "L" Joint Reinforcing
at ALL T -intersections at ALL Corners
PLAN VIEW PLAN VIEW
AT ALL 'T' MTERSECTIONS AT ALL CORNERS
TYPICAL CONCRETE BLOCK WALL REINFORCING
TO BE DUR-O-WAL DA3200 LADUR JOINT
REINFORCEMENT IN STANDARD WEIGHT (9GA) WITH A
HOT DIPPED GALVANIZED FINISH. REINFORCING SHALL
BE PLACED IN ALL CONCRETE BLOCK WALLS AT
16" O.C. VERTICAL OR EVERY OTHER COURSE OF BLOCK
TYfi ICAL MAS0NRY WALL
REINFORCING DETAILS
NTS
stucco finish
see elevations for notes
2" x 8" stud wall
two studs under header
two on outside
Tubical Window Jamb
Stucco fmii
see elevate
for notes
Stucco
j to opening framing
-ers product approval
t=ram& Wall
SITS
(3) 2" x 12" SYP 42
'attach window toopen ng framing
er manufacturers product approval
'ywall return
Jlndow - verify rouh
)pening size manuf acurer
Irble sill
� ' drywall
Window H&ader and Sill d&tail 5) Frain& l.Uall
Scale 1 — 1/2" = 1'-0"
Southeastern Metals 24 ga 5vCrimp Metal Roofing Installed
per product approval FLU 11115.1 over Polyglass self adhered R-20 Spray foam insulation
roofing underlayment over 19/32" CDX plywood attached
to trusses per sheeting attachment diagram on roof plan 12
5 1 SLOPE
Simpson HETA 20 or equal
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails
( 24" o.c.) supporting Max.
1810lbs. uplift
Galt' -Alum Metal drip on
I" x 4" Drip on
I" x 8" Fascia on
2" x 6" Sub -Fascia
BI --
24"
5/8" thick stucco on 3/8" hi -rib lath
attached to horizontal and vertical wood /
framing with nails or staples to provide
no less than I-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
5/8" thick light textured
stucco on typical concrete
block construction
#5 bar vert. w/
30" overlap -
at each filled cell
Grade
T -
TYPICAL
12
3 SLOPE
REM
PRE-ENGINEERED TRUSSES
at 24"o.c. TYPICAL
( shop drawings by manufacturer )
5/8" thick drywall finished
per room schedule
Typical Wall Reinforcement
see detail on sheet D-2
0 _� 1/2" drywall„ over 1" x furring
O 1 strips at 16 o.c. with R-5 rigid
o - = insulation on typical 8" Block walls
All drywall is per FBC 102.3.1 and
shall meet all pertaining ASTM codes.
Mortar to be Ty"1"ipe " only.
Provide Dur -O -Rock at al?wet
areas (ex. showers, tubs etc...)
Fill cell with concrete and
(1) 45 bar vert. (typical).
Max. spacing shall not exceed
32" unless otherwise noted
see foundation plan notes for
spacing at openings
T IV 4" concrete slab with fibermesh OR
"x6" #10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
SLO E 2"
TWO-STORY SECTION
Scale : 1/2" = I' -O"
0
�r
O
v -
1 5/8" x 3 5/8"
Top track 5/8" drywall ceiling on
truss bottom cord
One row of bracing
mid -span min.
Ll
0
5/8" drywall on
N 1 5/8" x 3 5/8" x 22 ga stud
metal studs at 16" o.c.
1 5/8" x 3 5/8" bottom track on
2" x 4" P.T. bottom plate
4" concrete slab with fibermesh OR
Typical baseboard 6"x6" 1*10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
Typical Interior Non—b&dring Partition
Scale: 1/2" = 1'-0"
Contractor to install studs
under EACH TRUSS
as shown
Simpson HTS -20 at each truss _
truss with (24) IOd x 1 1/2" nails
in each strap withstanding
1,450 lbs max_ uplift
5/8" drywall
ceiling
(2) 2" x 4" top plate
Strap each stud to plate using Simpson
SP4 strap with (6) 10d x 1 1/2"
nails in each strap
1/2" drywall on (2) 2" x 4" SYP 42
studs at 24" o.c. nail studs together using
(2) 10d nails at 18" o.c. vert.
One row of 2" x 4" blocking
at mid -span of studs
Strap each stud to plate using Simpson
SP4 strap with (6) IOd x 1 1/2"
nails in each strap
2" x 4" p.t. bottom plate with
1/2" exp anchor at 24" o.c. and
min. 8" embedment with 2" washer
'61
Typical baseboard
6"
4" concrete slab with fibermesh OR
6"x6" 410/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
See foundation plan for footing
size and steel req.
24" MAX
NO TRUSS SHALL SET
ON CLEAR SPAN OF
TOP CHORD
TYfi ICAL 2"x-4" STUD INTERIOR BEARING FARTITION
Max. Uplift Continuous load path = 1,450 lbs, from truss to footing.
Max. Gravity load on each pair of studs = 2,500 lbs.
Scale: 1/2" = l' -O"
.O
N CA
O r LL
N N
Q N -0
0 1 U0 U
�NoU(VOUJ
Q
v U
n` U
V
U
C___ f—
LL
�, m
U �
S__ -bt+-
Q� <
N
n�'c w MUl L -:5o O
O
ZW oo M O
' N N O
U
ZNN 0000 <CA #
cr
7
~ LQ x-1
N
< �=I!
4-3
Q3
-Q
m9__
J-1--1
SHEET NO:
OF 21,
JOS HUMBER:
oT
Digitally signed o o ®� RAD 4
so
by Daniel Braden AR 9770 °oma
09:49:22 -04 00
window unit
Attach windoi
er manufactu
2" x 8" stud wall
two studs under header
two on outside
Tubical Window Jamb
Stucco fmii
see elevate
for notes
Stucco
j to opening framing
-ers product approval
t=ram& Wall
SITS
(3) 2" x 12" SYP 42
'attach window toopen ng framing
er manufacturers product approval
'ywall return
Jlndow - verify rouh
)pening size manuf acurer
Irble sill
� ' drywall
Window H&ader and Sill d&tail 5) Frain& l.Uall
Scale 1 — 1/2" = 1'-0"
Southeastern Metals 24 ga 5vCrimp Metal Roofing Installed
per product approval FLU 11115.1 over Polyglass self adhered R-20 Spray foam insulation
roofing underlayment over 19/32" CDX plywood attached
to trusses per sheeting attachment diagram on roof plan 12
5 1 SLOPE
Simpson HETA 20 or equal
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails
( 24" o.c.) supporting Max.
1810lbs. uplift
Galt' -Alum Metal drip on
I" x 4" Drip on
I" x 8" Fascia on
2" x 6" Sub -Fascia
BI --
24"
5/8" thick stucco on 3/8" hi -rib lath
attached to horizontal and vertical wood /
framing with nails or staples to provide
no less than I-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
5/8" thick light textured
stucco on typical concrete
block construction
#5 bar vert. w/
30" overlap -
at each filled cell
Grade
T -
TYPICAL
12
3 SLOPE
REM
PRE-ENGINEERED TRUSSES
at 24"o.c. TYPICAL
( shop drawings by manufacturer )
5/8" thick drywall finished
per room schedule
Typical Wall Reinforcement
see detail on sheet D-2
0 _� 1/2" drywall„ over 1" x furring
O 1 strips at 16 o.c. with R-5 rigid
o - = insulation on typical 8" Block walls
All drywall is per FBC 102.3.1 and
shall meet all pertaining ASTM codes.
Mortar to be Ty"1"ipe " only.
Provide Dur -O -Rock at al?wet
areas (ex. showers, tubs etc...)
Fill cell with concrete and
(1) 45 bar vert. (typical).
Max. spacing shall not exceed
32" unless otherwise noted
see foundation plan notes for
spacing at openings
T IV 4" concrete slab with fibermesh OR
"x6" #10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
SLO E 2"
TWO-STORY SECTION
Scale : 1/2" = I' -O"
0
�r
O
v -
1 5/8" x 3 5/8"
Top track 5/8" drywall ceiling on
truss bottom cord
One row of bracing
mid -span min.
Ll
0
5/8" drywall on
N 1 5/8" x 3 5/8" x 22 ga stud
metal studs at 16" o.c.
1 5/8" x 3 5/8" bottom track on
2" x 4" P.T. bottom plate
4" concrete slab with fibermesh OR
Typical baseboard 6"x6" 1*10/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
Typical Interior Non—b&dring Partition
Scale: 1/2" = 1'-0"
Contractor to install studs
under EACH TRUSS
as shown
Simpson HTS -20 at each truss _
truss with (24) IOd x 1 1/2" nails
in each strap withstanding
1,450 lbs max_ uplift
5/8" drywall
ceiling
(2) 2" x 4" top plate
Strap each stud to plate using Simpson
SP4 strap with (6) 10d x 1 1/2"
nails in each strap
1/2" drywall on (2) 2" x 4" SYP 42
studs at 24" o.c. nail studs together using
(2) 10d nails at 18" o.c. vert.
One row of 2" x 4" blocking
at mid -span of studs
Strap each stud to plate using Simpson
SP4 strap with (6) IOd x 1 1/2"
nails in each strap
2" x 4" p.t. bottom plate with
1/2" exp anchor at 24" o.c. and
min. 8" embedment with 2" washer
'61
Typical baseboard
6"
4" concrete slab with fibermesh OR
6"x6" 410/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
See foundation plan for footing
size and steel req.
24" MAX
NO TRUSS SHALL SET
ON CLEAR SPAN OF
TOP CHORD
TYfi ICAL 2"x-4" STUD INTERIOR BEARING FARTITION
Max. Uplift Continuous load path = 1,450 lbs, from truss to footing.
Max. Gravity load on each pair of studs = 2,500 lbs.
Scale: 1/2" = l' -O"
.O
N CA
O r LL
N N
Q N -0
0 1 U0 U
�NoU(VOUJ
Q
v U
n` U
V
U
C___ f—
LL
�, m
U �
S__ -bt+-
Q� <
N
n�'c w MUl L -:5o O
O
ZW oo M O
' N N O
U
ZNN 0000 <CA #
cr
7
~ LQ x-1
N
< �=I!
4-3
Q3
-Q
m9__
J-1--1
SHEET NO:
OF 21,
JOS HUMBER:
oT
Digitally signed o o ®� RAD 4
so
by Daniel Braden AR 9770 °oma
09:49:22 -04 00
Southeastern Metals 2-f ga 5v Crimp Metal Roofing installed
per product approval FLU 11115.1 over POlyglass self adhered
roofing underlayment over 19/32" COX plywood attached
to trusses per sheeting attachment diagram on roof plan
Simpson HETA 20 or equal
hurricane anchor at each truss
with (10) IOd x 1 1/2" nails
( 24" o.c.) supporting Max.
1810lbs. uplift
Galt' -Alum Metal drip on
I" x 4" Drip on
I" x 8" Fascia on
2" x 6" Sub -Fascia 24„
O.H.
5/8" thick stucco on 3/8" hi -rib lath
attached to horizontal and vertical wood 1
framing with nails or staples to provide
no less than 1-3/4" penetration into
horizontal wood framing and 3/4" penetration
into vertical wood framing members
Smooth finished stucco —
capital and base
5/8" thick smooth finished
stucco on typical concrete
block construction
C-1
im
12
5 SLOPE
12
3 SLOPE
R-20 Spray foam insulation
1/8" thick li ht textured stucco installed per
over ype 22 paper bac=
wire lath nailed to substrate through one layer of —"
ASTM D Type 2 felt paper using 8d nails. Substrate
to be 19/32' COX Plywood nailed at 6" o.c. in field
and edges with IOd ring shank nails into studs.
Provide stucco stop
flashing and counter
f lashing
Strap stud over bottom plate to
floor truss using Simpson
LSTA 18 flat strap filling all nail
nail holes with IOd nails
R-20 Spray foam insulation
PRE-ENGINEERED ROOF TRUSSES
AT 24"O.C. TYPICAL
(shop drawings by manufacturer
R-19 kraft faced batts insulation
2" x 8" SYP #2 studs at 16" o.c. max.
2" x 8" bottom plate
Owner specified baseboard
Typical flooring over 15/32" CDX plywood screwed to
trusses or ,foists thru 23/32" CDX plywood sub -floor.
Install 15/32" plywood with 48 x 2.5" wood screws at 4" o.c.
max. spacing over 15 Ib felt. Install 23/32" COX plywood
screwed and glued to trusses or ,foists with 48 x 2' screws
at 12" o.c.
PRE-ENGINEERED 24" DEEP FLOOR
TRUSSES AT 24" O.C. TYPICAL
(shop drawings by manufacturer)
5/8" thick drywall finished
Strap stud over top plate to
floor truss using Simpson
LSTA 18 flat strap filling all nail
nail holes with IOd nails
5/8" thick drywall finished
per room schedule
Southeastern Metals 2-4 ga 5v Crimp Metal Roofing installed
per product approval FLU 11115.1 over Polyglass self adhered
roofing underlayment over 19/32" COX plywood attached
to trusses per sheeting attachment diagram on roof plan
per room schedule
Girder Truss - see shop drawings
S �ct�on at LU orks-hop Ceiling T rdnsition
Scale : 1/2" = 1'-0"
PRE-ENGINEEREO ROOF TRUSSES Provide Simpson HTS 20 12
AT 24"O.C. TYPICAL
(shop drawings by manufacturer) strap at each truss filling
all nail holes with IOd x 1.5" 3 FSLOPE
nails.
R-20 Spray foam insulation
} Galy-Alum Metal drip on
See coffer detail on sheet 6. /8" thick drywall finished
\,5/8" thick drywall finished I x 4 Drip on
per room schedule I" x 8" Fascia on per room schedule
2" x 6" Sub -Fascia (2) 2" x 8" top plate strapped to each stud
using Simpson SP8 filling all nail holes with
IOd x 1.5" nails.
5/8" thick stucco on 3/8" hi -rib lath
attached to horizontal and vertical wood Bedroom # 3
framing with nails or staples to provide
1/2" drywall over I" x furring no less than 1-3/4" penetration into
strips at W' o.c. with R-5 rigid OFFICE horizontal wood framing and 3/4" penetration 1/2" drywall finished per room schedule
insulation on typical 8" Block walls into vertical wood framing members
All drywall is per FBC 102.3.1 and R-19 kraft faced batts insulation
shall meet all pertaining ASTM codes. O 1/8" thick light textured stucco installed per O 2" x 8" SYP 42 studs at 16" o.c. max.
Mortar to be Tye "l"I" only. 1 ASTM C 926 over ASTM D type 2 paper backed
Provide Dur -O -Rock at atwet a wire lath nailed to substrate through one layer of
areas (ex. showers, tubs etc...) ASTM D Type 2 felt paper using 8d nails. Substrate 2" x 8" bottom plate
to be 19/32' COX Plywood nailed at 6" o.c. in field
and edges with IOd ring shank nails into studs. Owner specified baseboard
Owner specified baseboard
Provide stucco stop
Typical flooring over 15/32" COX plywood screwed to flashing and counter Typical flooring over 15/32" CDX plywood screwed to
trusses or ,foists thru 23/32" CDX plywood sub -floor. flashing trusses or ,foists thru 23/32" COX plywood sub -floor.
Install 15/32" plywood with 48 x 2.5" wood screws at 4" o.c. Install 15/32" plywood with 48 x 2.5" wood screws at 4" o.c.
max. spacing over 15 Ib felt. Install 23/32" COX plywood max. spacing over 15 Ib felt. Install 23/32" COX plywood
screwed and glued to trusses or ,foists with 48 x 2' screws Strap stud over bottom plate to screwed and glued to trusses or ,foists with #8 x 2" screws
at 12" o.c. floor truss using Simpson at 12" o.c.
LSTA 18 flat strap filling all nail
nail holes with IOd nails
PRE-ENGINEERED 24" DEEP FLOOR ; - PRE-ENGINEERED 24" DEEP FLOOR
R-20 Spray foam insulation TRUSSES AT 24" O.C. TYPICAL R-20 Spray foam insulation Oi TRUSSES AT 24" O.C. TYPICAL
(shop drawings by manufacturer) N (shop drawings by manufacturer)
.. I �0000000mmJ--)
PRE-ENGINEERED ROOF TRUSSES
T- -r- -' „ O AT 24"O.C. TYPICAL
5/8" thick stucco on 3/8" hi -rib lath 3 mineral wool batts insulation (shop drawings by manufacturer) 3 mineral wool batts insulation
attached to horizontal and vertical wood L 5/8" thick dr wall finished N 5/8" thick dr wall finished
framing with nails or staples to provide y y
no less than 1-3/4" penetration into per room schedule per room schedule
horizontal wood framing and 3/4" penetration Strap stud over top plate to
into vertical wood framing members floor truss using Simpson Girder Truss - see shop drawings
�j LSTA 18 flat strap filling all nail P 9
nail holes with IOd nails
Simpson HETA 20 or equal 8 recast lintel - see schedule (2) 2" x 4" SYP #2 top plate
hurricane anchor at each truss P
with (10) IOd x 1 1/2" nails and framing/roof plan for locations
( 24" o.c.) supporting Max.
1810lbs. uplift R-13 Kraft faced batts
Provide one layer of 30# felt I/2" drwall over I" x furring 2" x 4" blocking
between truss and beam strips a 16" o.c. with R-5 rigid 5/8" thick drywall finished 2" x 4" nailer
insulation on typical 8" Block walls per room schedule
All drywall is per FBC 102.3.1 and See typical bearing wall detail
shall meet all pertaining ASTM codes. - 1 for stud count and spacings
Mortar to be Type "M" onlyy. O N
\ / Provide Dur -O -Rock at atwet ' —
C O Y E F E D Stucco return areas (ex. showers, tubs etc...) N_ SEE GARAGE SECTION FOR
F O F C CEILING HEIGHTS U t I I t
—� 1—I D
See window Schedule I� oom
For Sizes
Garage
Fill sill course solid
with concrete for window
attachment
Tin cell cap
Step per foundation plan
Slope per slab plan
Section at iZear Covered Porch
Owner specified baseboard
Typical Flooring on
4" concrete slab with fibermesh OR
6"x6" 410/10 WWM on 6 mil Visqueen over
clean compacted termite treated fill
\35-6 Slab Bar
at 32" o.c.
F -2-4S
Scale : 1/2" = 1'-0"
See typical bearing wall detail
for bottom plate, attachments
and strapping
45 bar cont
N
24"
Oulner specified baseboard
Typi al Flooring on
4" concrete slab with fibermesh OR
6"x6 410/10 WWM on 6 mil Visqueen over
clear compacted termite treated fill
(2) 44 temperature bars
\(3) 45 bars cont. and 45 transverse
bars at 32" o.c.
Section at Curage/Utility Rm.
Scale : 1/2" = 1'-0"
Digitally signed
by Daniel Brader
J0Date: 2020.05.11
09:49:04 -04'00'
.. O
N � �
o r LL
N N
� N i-
QL �
N ,
o' 00 U
�r
� N Q (V w
Q
v U
W
U
W
� U
0 f—
�, m
U QO
W
(VI I I <
N
w
w :::5o O
O
Z W 00 crl O
' N N O
06 Go
U
0000
1 Z N NCA CA
##
� ~ O rr� cr
73 Q� LLJ U cel
~ LQ X-1
L._. U IL +, LL
mN
4-3
W
73
J-1--1
SHEET NO:
D
OF 21,
JOS HUMBER:
19-207
%P_L R. BRAD
--- ---
� ' FBF; 9770 V
�•� FRED ARG,���
N
2„ 2„
/8" dia. nelson studs
rewelded to plate
/8" thick embed plate
10"
< j
Preweld 3/8" thick flanges
to steel column - verify web
thickness and provide
1/8" each side for field tolerance
Pre -drill I" dia. holes with
3/4" dia. thrubolts
,7--�,E10-XX
E10 -XX
Girder truss GRH
loading:
Uplift = 10.8 k
Gravity = 11.4 k
8"
2" 2,
Girder truss GRK
-• • loading:
�• • Uplift = 9.4 k
Gravity = 9.8 k
—• • E10 -XX
SECOND FLOOR GIRDER CONNECTION
3-4-20
Preweld 3/8" thick flanges
to embed plate - verify web Pre -drill I" x 1.25" short slot holes
thickness and provide for 3/4" x 2" bolts
I/8" each side for field tolerance
N 3-4-20 Preweld 3/8" thick flanges
E10 -XX
/" to steel column — verify web
10"
POUR KNOCK OUT EMBED PLATE
SOLID WITH CONCRETE
6" embed
thickness and provide
1/8" each side for field tolerance
block wall to center of column — field verify
Gravity Load
1-1 11
%z"" "2" at this connection: 20 kips 26'-11" beam length - field verify
N
GG
vv
dd
m atr th sy connection: 20 kips
FILLED CELLS - SEE FLOOR PLAN
FOR LOCATION
• iy
m —
•
W24X55 W24X55
E70 -XX
1/2" gap between beam and
post - field verify all measurement of post
prior to ordering steel
CONNECTION TO BLOCK WALL
Total Column Load:
Uplift = 22.2 k
Gravity = 53.2 k
16" x 16" x 4"d recess for
secondary pour to conceal bolts
5/8" thick plate
3 E10 -XX
16
C-4 Column
3-4-20 -o
u�
PROVIDE SHOP DRAWINGS
FOR STEEL CONNECTIONS O >
N �LL
1
� 4.5"
y2„ 3-4-20
2 Typical eac
I ___r z Beam lenght = 23'-9"
field verif
m Gravity Load
• I • L at this connection: 12 ki s
• I I • N WILX36
0
I/2" gap between beam and i >
post - field verify all measurement
of post prior to ordering steel
3-4-20
C-4 Column
See base detail below
I" leveling grout
Footing - see foundation plan
STEEL COLUMN DETAIL
3–�f-20
��r•011
�
Pre -drill 3/4" dia. holes for
5/8" dia. bolts
3/4" thick base plate
n C-4
/I 6
BASE PLATE DETAIL
C-4 Column CONNECTION
LL
PLATE
STEEL
STEEL SHALL BE SO KS
LL
BOLTS
TO BE
A32S
/4
Scale 1" = 1'-0"
Top Bar
Bottom E
R„
3-6-20
W16X36 STEEL BEAM
50 KSI STEEL
(3) 2" x 10" ledger
Hang truss on ledger using Simpson
WNP 416 hanger with (2) IOd nails into 2
ledger and truss.
max gravity = 3,000 lbs
2" Clear
Typical -
Top Bar --
Stirrup
Bottom Bar
BS/B13
BEAM
Check spacing with final
truss shop drawings and install
2 so bolts fall between trusses
D/ o U10 LnruuoiLs
N
LEDGER BOLT SPACINGS DET
PRE -DRILL STEEL BEAMS (3) 2" x 10" ledger
WITH 3/4" DIA HOLES FOR
THRUBOLT INSTALLATION
Bolt ledger to steel beam using
(2) 5/8" dia thrubolts at
24" o.c. staggered
Remove corner of first ledger board
as needed to fit snug on steel beam
16"
2" Clear
Typical
Top Bar m
Stirrup 7.
m
Bottom Bar
N
2" Clear
Typical
Top Bar cn
Stirrup
ch -
Bar
Bottom
DETAILS
8"
N
VERILY ALL STEEL
SIZES IN
CONCRETE
BEAMS
WITH SCHEDULE ON
FRAMING
AND ROOF
PLAN
2" Clear
Typical
ALL Bars are #5 bars vert.
ALL TIES ARE 43
� v .
d d 4• d` 'd A. d
•V• .• V •. P. .••V. •. V. 'V' V .V •••
COLUMN C-3 DETAIL
Scale 1„ = 1'-0"
MIRROR FOR OPPOSITE SIDE OF SCID
W24X55 STEEL BEAM
50 KSI STEEL
(3) 2" x 10" ledger
3
eI
ang truss on ledger using Simpson
US 410 hanger filling all nail
oles with 16d nails
ax gravity = 2,100 lbs
Bottom Ba
0
N
a,
Typical
L
S
Top Bar m
m
O r
N N
�
ILL
N
m
Stirrup
>—
U
z
o'
UQ_(
U
IV
UlU
Q
v
W
O
U
Bottom Ba
V
8„
2" Clear
w
Typical
Top Bar m
m
r
U
�
Stirrup
..
U
Bottom Ba
N
nY'c w
� =5o O
Z 0)
' Z M
> o0 O
CA C14
< 00 00
rr <
ci I z NN #
T
73 _
— LQ X
L U LL LL
N
B11 B12 ff)4-3�
Q3
Scale 1" = 1'-0"
�Q
SHEET NO:
OF 21.
JOB NUMBER:
-207
OF
��O.O.O.D,000
O F Fg,� o000
Digitally signed °
by Daniel Braden o:�oo ��977®
Date: 2020.05.11 �°@° ° .°o�000
09:48:47 -04 00 ���oo000D����
�
m
r
U
�
IV
N
nY'c w
� =5o O
Z 0)
' Z M
> o0 O
CA C14
< 00 00
rr <
ci I z NN #
T
73 _
— LQ X
L U LL LL
N
B11 B12 ff)4-3�
Q3
Scale 1" = 1'-0"
�Q
SHEET NO:
OF 21.
JOB NUMBER:
-207
OF
��O.O.O.D,000
O F Fg,� o000
Digitally signed °
by Daniel Braden o:�oo ��977®
Date: 2020.05.11 �°@° ° .°o�000
09:48:47 -04 00 ���oo000D����
U" cook top 1
vent through w
Provide conduit wr
and J -Box for fut
To under counter
lighting in kitchen
Recep
Septic
SERVICE LOAD CALCULATION SHEET
�
a�
PANEL "A"
Qtq.
Watts
Poles BR
Load
Wire
Description
cmctt
cmc#
Description
Wire Load
BR Poles
2 40
1.0 kw
#8
A/C comp
1
2
AHU
#10 3.5 kw
30 2
2,400
2 5,000
10,000
2 4,500
3
4
1,500
1
1,800
2 30
4.5 kw
#10
Water Heater
5
L
General Lighting
#12
20 1
8,000
2 5,160
11,520
2 2,000
1
8
General Lighting
#12
20 1
2 30
5.16 kw
ttl0
Dedicated 240 cir.
9
10
General Lighting
#12
20 1
10,000
Remainder 109,(.30 840%
1
General Li htin
II
12
General Lighting
#12
20 1
1 20
2.0 kw
#12
Dedicated 120v Cm.
13
14
Exterior GFCI
#12
20 1
1 20
1.5 kw
#12
Water Softener
15
It.
Exterior GFCI
#12
20 1
1 20
0.81 kw
#12
Garage Door Opener
11
18
Exterior GFCI
#12
20 1
I 20
13
#12
General Lighting
19
20
Exterior GFCI
#12
20 1
1 20
1.5 kw
#12
General Lighting
21
22
Landscape Lights
#12
20 1
1 20
1
#12
General Lighting
23
24
Landscape Lights
#12
20 1
1 20
#12
#12
General Lighting
25
26
Spare
1.5 kw
#12
1 20
19
#12
General Lighting
21
28
Spare
1
1
1 20
1.2 kw
#12
General Lighting
29
30
Spara
#12
#12
1 20
1
a12
Smoke Detectors
31
32
Spare
23
24
1 20
#12
#12
Bathroom GPI
33
34
Spare
#12
1 20
25
#12
Bathroom GFI
35
36
Spare
1
1
1 20
#12
Garage
31
38
Spare
#12
20
1
1
Spare
39
40
SUB -PANEL C
(3)#3 23.85kw
100 2
General Lighting
#12
Spare
41
42
20
38
#12
SERVICE LOAD CALCULATION SHEET
�
a�
Load Description
Qtq.
Watts
Total(Watts)
General Lighting (3 watts sq. ft.)
Small Appliance Circuit(s)
Range
Range Hood
Refrigerator
Dish Washer
Disposal
Clothes Washer
Clothes Dryer
Water Heater
Water Softener
Irrigation rump
Future Fool Equipment
Garage Door Opener
Whirlpool Bathtub
Master Tub Tankless
Double Oven
240v Dedicated
120v Dedicated
9,215
3
21,825
2 1.500
3,000
1
12,000
1
1,100
1
1,200
1
1,200
1
1,500
2 1,200
2,400
2 5,000
10,000
2 4,500
9,000
1
1,500
1
1,800
1
2,800
2 810
1,620
1
1,440
1
8,000
1
8,000
2 5,160
11,520
2 2,000
4,000
#10
Dedicated 240v
5
Total
Watts
119,630
5.0 kw
30
2
First 10000 Watts 8100%
1
#12
10,000
Remainder 109,(.30 840%
1
General Li htin
43,852
Electric Heat or A/C 10,000 865%
2
(6,500
13,000
Calculated Load
Watts
#12
44,852
9
Voltage
Pool Equipment
240
Calculated Wattage Divided b4 Voltage = Total Amps
Service
Size
218.55
= 400 Amps
13
14
15
)TES:
SCALE: 1/4" = I' -O"
Wire only, no aluminum.
d Wire all required smoke detectors.
to verify location of electrical service and provider
s fans shall be on a rheostat.
:ars to be installed per NFPA requirements.
:h Circuits that supply 125v single phase 15 amp or 20 amp outlets
�tected bg Combination -Type AFCI Circuit Breakers.
istant AFCI receptacles to be installed in ALL rooms
throoms, and Garage.
and kitchen and garage receptacles to be GFCI protected.
for outlets to be WP/GFCI protected.
urn Air Balance Must comply w/ F.B.C. Mechanical 2010 ed.
rsion of any supplements to the 2010 ed,
gerant lines that are run thru slabs must be sleeved in PVC
Equipment shall be 15 SEER
Provide Disconnects at ALL appliances (Water heater, A/C units, and
ALL other equipment as required bg N.E.C.)
A/C Ducts in Garage shall be metal or I" thick minimum rigid nonmetallic
Class I duct or other approved material and shall have no openings into
Smoke Alarms shall be installed in the following locations:
a) In each sleeping room.
b) Outside each separate sleeping area in the immediate vicinity of the
c) On each additional story of the dwelling
** ALL Smoke Alarms shall be interconnected and hardwired*
and
Class 0 or
the garage.
bedrooms.
Digitally signed
by Daniel Braden
jDate: 2020.05.11
A09:48:03 -04'00'
� O
�
a�
PANEL "B"
"C"
0 00 0
Q
Poles BR
Poles
BR
Load
Wire
Description
circ#
cmctt
Description
Wire
Load
BR
Poles
2
40
8.0 kw
#8
Double Oven
1
2
Range
tt6
12.0 kw
50
2
4
3
4
#8
A/C comp
5
L
Dryer
2
30
5.14 kw
#10
Dedicated 240v
5
4
Dryer
#10
5.0 kw
30
2
1 20
1.2 kw
#12
Clothes Washer
l
8
General Li htin
#12
20
1
I 20
1
20
2.0 kw
#12
Microwave
9
10
Pool Equipment
#10
2.8 kw
30
1
1
20
2.0 kw
#12
Dedicated 120v
II
12
Irr. Pum
#12
1.8 kw
20
2
1
20
1.5 kw
#12
Range hood
13
14
#12
General Lighting
11
IS
General Lighting
1
20
1.5 kw
412
Kitchen S.A.C.
15
14
Dishwasher
U12
1.2 kw
20
1
1
20
1.5 kw
#12
Kitchen S.A.C.
Il
18
Refrigerator
#12
1.2 kw
20
1
1
20
1.5 kw
#12
Disposal
19
20
General Lighting
#12
1 20
20
1
1
20
1.2 kw
#12
Clothes Washer
21
22
General Lighting
#12
#12
20
1
1
20
0.81 kw
#12
Garage Door Opener
23
24
General Lighting
#12
29
20
1
1
20
#12
General Lighting
25
24
General Lighting
#12
Spare
20
1
1
20
#12
General Lighting
21
28
General Lighting
#12
20
1
1
20
Spare
#12
General Lighting
29
30
General Lighting
#12
20
1-
1
20
38
#12
General Lighting
31
32
Exterior GFCI
#12
20
1
1
20
#12
Smoke Detectors
33
34
Exterior GFCI
#12
41
20
1
1
20
#12
Bathroom GFI
35
34
Garage
#12
20
1
Spare
31
38
Spare
Spare
1 39
1 40
1 Spare
Spare
1 41
1 42
1 Spare
Digitally signed
by Daniel Braden
jDate: 2020.05.11
A09:48:03 -04'00'
� O
�
a�
SUB -PANEL
"C"
0 00 0
Q
Poles BR
Load
Wire
Description
circ#
cmctt
Description
Wire
Load BR
Poles
2 40
8.0 kw
#8
Tub Tankless WH
1
2
AHU
#10
3.5 kw 30
2
3
4
2 40
1.0 kw
#8
A/C comp
5
L
Dryer
#10
5.0 kw 30
2
1
8
1 20
1.2 kw
#12
Clothes Washer
9
10
General Li htin
#12
20
1
I 20
1.4 kw
#12
1 Whirlpool Tub
II
12
General Lighting
#12
20
1 I
1 20
#12
General Lighting
13
14
General Lighting
#12
20
1
1 20
#12
General Lighting
IS
14
General Lighting
#12
20
1
1 20
#12
General Lighting
11
IS
General Lighting
#12
20
1
1 20
#12
General Lighting
19
20
General Lighting
912
20
1
1 20
#12
General Lighting
21
22
Exterior GFCI
#12
20
1
1 20
#12
General Lighting
23
24
Exterior GFCI
#12
20
1
1 20
#12
Smoke Detectors
25
2L
Bathroom GFI
It12
20
1
1 20
#12
Bathroom GFI
21
28
Spare
1 20
#12
Bathroom GFI
29
30
Spare
1 20
#12
Bathroom GFI
31
32
Spare
Spare
33
34
Spare
Spare
35
31.
Spare
Spare
31
38
Spare
Spare
39
40
Spare
Spare
41
42
Spare
Digitally signed
by Daniel Braden
jDate: 2020.05.11
A09:48:03 -04'00'
� O
�
a�
S ( 0
3
0 00 0
Q
U
II W
z
Q.�
rl (
C
01)
73
E
O
U
0o m
Lo O U
NN
00 O
I I U
r- r
000
NN
NN
-1
LL
O
U
0o
ori
73
0
-I4
v -
W (zQ)
L6 H
U_
,-)
SHEET NO:
OF 21.
JOB NUMBER:
Dryer VTW ---�
to flood lights
and switch in great room
Q�
x
---------------------
I
ROOF BELOW
I I i I
EXT. WALL
J-----------------------------------�
__________________________________________________________________________________�I
PROVIDE TANKLESS WH UNDER TUB SURROUND
FOR TUB ONLY. PROVIDE FOR ACCESS ON
TOILET SIDE OF TUB SURROUND FOR TUB EQ. AND WH
Verif AIC rating
with gervice Provider
prior to ordering
gear. 22k assumed�o
(3) 43/0 copper feed
2" Conduit V
n
=
METER
2" PVC ( FPL)-�
Intersystem bonding
Termination point
to I=PL ug servic
GEC
ATS
200
AMP
MCS
FAA
NEL
TO FUTURE GENERATOR
#2 Copper
(2) 5/8" x 8'-0 ground rods
6'-O" apart min.
200
AMP
MCS
PASNEL
Irr disc
A/C disc.
100
AMP
sus
PANEL
C
ELEC7RIC/4L RISER
ALL ELECTRIC EQUIPMENT TO BE NTS
INSTALLED ABOVE THE FLOOD PLANE
SECOND FLOOR EL_EC7RiC/4L_ FL/4N
ELECTRIC NOTES: SCALE: 1/4" = I' -O"
1.
Use copper wire onl , no aluminum.
3 ( U (
2.
Provide and wire required smoke detectors.
Q
3.
Contractor to verifcq location of electrical service and provider
A[
4.
ALL paddle fans shall be on a rheostat.
5.
Recessed cans to be installed per NFPA requirements.
�.
ALL Branch Circuits that supplq 125v single phase 15 amp or 20 amp outlets
w
M
shall be protected bg Combination -Tape AFCI Circuit Breakers.
z
7.
Tamper resistant AFCI receptacles to be installed in ALL rooms
<
Kitchen, Bathrooms, and Curage.
NN
8.
ALL bath and kitchen and garage receptacles to be GFCI protected.
1.
ALL exterior outlets to be WP/GFCi protected.
10.
A/C Return Air Balance 1Iust complcq w/ F.B.C. Mechanical 2010 ed.
and
current version of an9 supplements to the 2010 ed.
OD
11.
A/C Refrigerant lines that are run thru slabs must be sleeved in PVC
Z
12.
ALL A/C Equipment shall be 15 SEER
13.
Provide Disconnects at ALL appliances (water heater, A/C units, and
ALL other equipment as required by N.E.C.)
14.
A/C Ducts in Curage shall be metal or I" thick minimum rigid nonmetallic
Class 0 or
Class I duct or other approved material and shall have no openings into
the garage.
15.
Smoke Alarms shall be installed in the following locations:
a) In each sleeping room.
b) Outside each separate sleeping area in the immediate vicinitcq of the
bedrooms.
c) On each additional store of the dwelling
W
** ALL Smoke Alarms shall be interconnected and hardwired **
,L
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:47:49 -04'00'
a�
3 ( U (
��
o QUQ
Q
U
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:47:49 -04'00'
o
�
A/C disc.
1.L
A[
W
E
o
v
�
�
w
M
z
00
<
NN
nn�
1G.1�
J
Digitally signed
by Daniel Braden
Date: 2020.05.11
09:47:49 -04'00'
SHEET NO:
LL
w
U
W
I—
U
I—
LLI
U
00
ori
73
0
E - 2
OF 2I.
JOB NUMBER:
I9-207
o°° a
®SSL R. [�d�q®4
o
1� o° Aft 9770 °o Oz�
° o
�,o�o
a�D°oo
A[
W
E
o
�
�
�
w
M
z
00
<
NN
J
00 OD
zN
OD
Z
C-4�
�WU��-�
�x
Q
W
••
� x
,L
U
vi
,� N
AL
v
•�
SHEET NO:
LL
w
U
W
I—
U
I—
LLI
U
00
ori
73
0
E - 2
OF 2I.
JOB NUMBER:
I9-207
o°° a
®SSL R. [�d�q®4
o
1� o° Aft 9770 °o Oz�
° o
�,o�o
a�D°oo