Loading...
HomeMy WebLinkAboutContractPROPOSAUCONTRACT WILCO CONSTRUCTION INC. 10751 ORANGE AVE FT. PIERCE, FL 34945 PH 772-460-6928 FAX 772-460-6929 SCC #131151026 PROPOSAL SUBMITTED TO: GUS LAROCCA PH# 954A61-671 B EMAIL: LARODENT@AOL.COM i' WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: DESCRIPTION OF JOB: BATTER PILE AND SLAB CONCRETE SEAWALL VENTURE III LOT 821 1. FURNISH AND INSTALL UP TO 35 L FT OF BATTER PILE AND SLAB TYPE CONCRETE SEAWALL 2. EXISTING WALL AND COMPONENTS TO REMAIN 3. NEW PANELS TO BE 8' X 12' WITH #5 REBAR SET AT 1' +/- ON CENTER EACH WAY (CAST ON SITE) _ 4. NEW TOP CAP TO BE 14" X 20" WITH 5 PCS #5 REBAR CONTINUOUS AND V3 TIES SET AT T+I- ON CENTER 5. PILINGS TO BE 12" X 12" PRESTRESSED CONCRETE X UP TO 20' LONG AND DRIVEN VERTICAL AT EACH PANEL SEAM AND BATTERED (ANGLED 4 TO 1 +/-) AT MID PANEL (THIS WILL TIE WALL BACK - IN LIEU OF UPLAND ANCHORS) B. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO A MINIMUM CAPACITY OF 5 TONS EACH TOTAL: $20,955.00 `INCLUDES THE FOLLOWING: DRAINS, FILL HOLES TO CHECK FOR VOIDS, BLOCK WORK ON BOTH SIDES,1 SLAB MIN. OF 4" THICK, DOWELS IN SEAWALL CAP ON 2' ON CENTER TO KEEP SLAB LEVEL, REMOVE & DISPOSE OF 2 EXISTING DAVITS ' SCHEDULE AS OF 10110/2019 IS THE END OF MARCH 2O20 NOTES: 1. WILCO CONSTRUCTION CARRIES U.S.L. & H WORKERS COMPENSATION INSURANCE AS PER FEDERAL REGULATIONS FOR MARINE CONSTRUCTION 2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED 3. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPE/SOD, ADDITIONAL FILL DIRT COSTS, ROCK AND/OR HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION, DOCK WORK, DREDGING, ANDIOR HANDRAILS 4. ROCKAND/OR HARD SUBSTRATE IF ENCOUNTERED REQUIRING REMOVAL THEN EXTRA CHARGES (AT COST) WILL APPLY 5. IN THE EVENTTHAN EXCESSIVE DEBRIS (WOOD, CONCRETE, TREES, ETC) ARE UNEARTHED REQUIRING DISPOSAL THEN ADDITIONAL FEES WILL APPLY (DISPOSAL COSTS) 6. WATER SUPPLY REQUIRED 7. PLOWABLE FILL BEHIND OLD WALL IF REQUESTED/REQUIRED EXTRA S. PROPERTY MARKERS TO BE PROVIDED BY OWNER PRIOR TO COMMENCEMENT OF WORT( 9. EMPTY LOT WITHIN COMMUNITY REQUIRED FOR CASTING OF CONCRETE PANELS ANDIOR LOADING - UNLOADING OF REQUIRED MATERIALS (TO BE OBTAINEDINEGOTIATED BY OWNER PRIOR TO OUR ARRIVALICOMMENCEMENT OF WORK) IF NO LOT IS AVAILABLE - EXTRA COST FOR TRUCKING $250.00 EACH LOAD - APPROX. 4 LOADS 10. ASSOCIATION APPROVALS FOR WORK TO BE PERFORMED TO BE OBTAINED PRIOR TO OUR ARRIVALICOMMENCEMENT OF WORK. PAYMENTS AS FOLLOWS: 5% OF CONTRACT UPON SIGNING, 25%OF CONTRACT 2 WKS+I- PRIOR TO COMMENCEMENT OF WORK, 25% OF CONTRACT UPON PANELS CAST, 25 % OF CONTRACT UPON PANELS IN PLACE AND BALANCE UPON TOP CAP IN PLACE AND CLEAN UP DATE: AUTHORIZED SIGNATURE: 10/10/2019 11w/-i };` !RON EVERLY I HAVE READ THIS PROPOSAIJCONTRACT AND UNDERSTAND ITS TERMS AND CONDITIONNS AND ACCEPT THE SAME INCLUDING THOSE ON THE REVERSE SIDE OF THIS FORM, WILCO IS AUTHORIZED TO DO THE WORT( SPECIFIED IN THE CONTRACT ONLY: PAYMENT MADE AS STATED ABOVE. ALL INVOICES ARE PART OF THIS PROPOSALICONTRACF� I l f. DATE: : / C F : i ! �C ( SIGNATURE: