HomeMy WebLinkAboutUntitled1578 Niemeyer Circle
Port St. Lucie, FL 34952
Clean Air
Tectincicailes
PROPOSAL AND AGREEMENT
A/C Sales Service Installation
By Jeffrey Almeida - Lic # CA -C058660
CUSTOMER NAME �"1 L L ` c P el�
ADDRESS M —,/), I Cn!1.�✓Y/1
CITY, STATE, ZIP P � ( - S:
(772) 335-2061
Fax 335-1802
'
PHONE .7 T� t1'—S DATE S -) 3.14 �.
JOB ADDRESS Sk' j
WORK PHONE
We will furnish, install and service the equipment listed below at the price, terms and conditions outlined on all pages
of this proposal.
EQUIPMENT SPECIFICATIONS
Make r�' r�'�' " Model Number(s) P 7i71/?°
r SEER_ EER BTUH Cooling>; �( BTUH Heating CFM
Installation shall
�'v
l� include:yt u/i /�r y Arc?�.�JGr /1t /1(t�� N j r� :�/-'� :!(,l % �0`1)
i'c". i
/rl f�i,.,� ji/ f !/�i,'iyr F' OLt ✓1G� lti'�'',C7,� ,1/�/'j �j I.%�/�,1,✓e'`!.
New Amp disconnect
� N low voltage wiring
_�/ eew reinforced equipment pad
li1(Jew vibration isolation pads
New properly sized refrigerant lines
New, clean, dry ACR copper tubing;.-
�harge to manufacturer's specs
Insulate refrigerant suction lines
Install refrigerant drier(s)
vacuate refrigerant system
Remove existing equipment from premises
L," Install new r- i >,1 thermostat
ew copper wire from ; to 9 -
e/
Complete system start up
X=Yes
'Make air tight plenum transition
New dehumidistat
New supply diffuser
New duct run from to
New return air filter grill
Noise reducing flexible duct connector
Clean work area to customer's satisfaction
New condensate drain system
Install aux. condensate drain pan
New high efficiency air filter
i./Meet all code requirements
1v year parts warranty
3 year labor warranty b�
year compressor j
g,,year service agreement
Option (below) Alternative (below) Is ( _ Is not) included in price
Terms
Acceptance by:
Date
Installed Pric
Taxes
Total Amount
e
Down Payment $
Balance Due $
Approved/I
by: /' �% �' Date:
New Amp disconnect
� N low voltage wiring
_�/ eew reinforced equipment pad
li1(Jew vibration isolation pads
New properly sized refrigerant lines
New, clean, dry ACR copper tubing;.-
�harge to manufacturer's specs
Insulate refrigerant suction lines
Install refrigerant drier(s)
vacuate refrigerant system
Remove existing equipment from premises
L," Install new r- i >,1 thermostat
ew copper wire from ; to 9 -
e/
Complete system start up
X=Yes
'Make air tight plenum transition
New dehumidistat
New supply diffuser
New duct run from to
New return air filter grill
Noise reducing flexible duct connector
Clean work area to customer's satisfaction
New condensate drain system
Install aux. condensate drain pan
New high efficiency air filter
i./Meet all code requirements
1v year parts warranty
3 year labor warranty b�
year compressor j
g,,year service agreement
Option (below) Alternative (below) Is ( _ Is not) included in price
Terms
Acceptance by:
Date
Installed Pric
Taxes
Total Amount
e
Down Payment $
Balance Due $
Approved/I
by: /' �% �' Date: