Loading...
HomeMy WebLinkAbout18-230 Ocean Harbor N Bldg E - Rpt 1 - 02.11.19M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 18-230 Report No. 1 Building Official: Project Manager: Contractor: File Mr. Andrew Manero – SLC Bldg. Dept. Mr. Gene Ross – Elliott Merrill Mr. Bob Stark – Structure-Con Mr. Khris McConnell – Structure-Con Page 1 of 2 THRESHOLD INSPECTION REPORT OCEAN HARBOR NORTH CONDOS – BUILDING E 5167 NORTH HWY. A1A – UNITS 708 & 808 SLC BUILDING PERMIT NUMBER: 1812-0435 PROJECT NAME: Ocean Harbor N. Condos – Bldg E DATE: February 11, 2019 CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, Florida CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell INSPECTED BY: Mike Lue WEATHER: Sunny WORK INSPECTED: Balcony repairs in progress. OBSERVATIONS: • The existing tile was carefully removed and the deteriorated concrete was excavated. • There are (2) affected post tension cables which have been located, locked off, and spliced away from the slab edge as indicated in the permit document. • There were existing galvanized electrical conduits within the slab which were in contact with the reinforcing steel and found to be corroded due to electrolysis which have been replaced. • New reinforcing has been added, placed and coated with corrosion inhibitor. RECOMMENDATIONS: • Adjust all reinforcing to maintain the required clearances from the aluminum posts, galvanized conduits and proper concrete coverages. • Repour the concrete around the post tension anchors. • Stress the cables after the concrete has attained a minimum of 4,000 psi. • The post tension specialist General Building Services will submit the calibration certification for the hydraulic ram used to tension the cables. Michael Lue, P.E. M L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 18-230 Report No. 1 Building Official: Project Manager: Contractor: File Mr. Andrew Manero – SLC Bldg. Dept. Mr. Gene Ross – Elliott Merrill Mr. Bob Stark – Structure-Con Mr. Khris McConnell – Structure-Con Page 2 of 2 Pic 1 Unit 808 balcony edge. Two new PT cables. Replaced section electrical conduit taped to prevent contact with reinforcing steel. Pic 2 Unit 808. Lock off at the two PT cables.