Project No. 18-230 Report No. 1
Building Official:
Project Manager:
Contractor:
File
Mr. Andrew Manero – SLC Bldg. Dept.
Mr. Gene Ross – Elliott Merrill
Mr. Bob Stark – Structure-Con
Mr. Khris McConnell – Structure-Con
Page 1 of 2
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOS – BUILDING E
5167 NORTH HWY. A1A – UNITS 708 & 808
SLC BUILDING PERMIT NUMBER: 1812-0435
PROJECT NAME: Ocean Harbor N. Condos – Bldg E DATE: February 11, 2019
CLIENT: Elliott Merrill Community Mgmt. LOCATION: Ft. Pierce, Florida
CONTRACTOR: Structure-Con PROJECT MGR: Mr. Khris McConnell
INSPECTED BY: Mike Lue WEATHER: Sunny
WORK INSPECTED:
Balcony repairs in progress.
OBSERVATIONS:
• The existing tile was carefully removed and the deteriorated concrete was excavated.
• There are (2) affected post tension cables which have been located, locked off, and spliced away from the slab
edge as indicated in the permit document.
• There were existing galvanized electrical conduits within the slab which were in contact with the reinforcing
steel and found to be corroded due to electrolysis which have been replaced.
• New reinforcing has been added, placed and coated with corrosion inhibitor.
RECOMMENDATIONS:
• Adjust all reinforcing to maintain the required clearances from the aluminum posts, galvanized conduits and
proper concrete coverages.
• Repour the concrete around the post tension anchors.
• Stress the cables after the concrete has attained a minimum of 4,000 psi.
• The post tension specialist General Building Services will submit the calibration certification for the hydraulic
ram used to tension the cables.
Michael Lue, P.E.
M L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 18-230 Report No. 1
Building Official:
Project Manager:
Contractor:
File
Mr. Andrew Manero – SLC Bldg. Dept.
Mr. Gene Ross – Elliott Merrill
Mr. Bob Stark – Structure-Con
Mr. Khris McConnell – Structure-Con
Page 2 of 2
Pic 1
Unit 808 balcony edge.
Two new PT cables.
Replaced section electrical conduit taped to prevent
contact with reinforcing steel.
Pic 2
Unit 808.
Lock off at the two PT cables.