HomeMy WebLinkAboutLovito BHBase Details
Building Sine & Stine
Premier Ranch 10' wide by B' long
Door
p x 6'N Angle Shetl Door, Lein Xinge
Placement
Paint Selecemi
Base: No Paint, him: No Paint
Roof Selection
Shakewood Dimensional Premlom
Shingle
Odp Edge
Brown
Wall A
Wall D
Wall B
Options Details
Nigh Wiml
Nigh Wind - Retail
fl0or and Foundation
4 Ea Shed Anrhaf to Comrete A248,
Wage, Anchor
Velds
2 Ea 16" xg' Wall Vent - Brown
code. SeMcos
Permlthng and Engineering fee
Customer Signatur : Date:
Wall C
Jobsite/Installer Details
DD You plan to Insulate this building akar Tuff Shad
Installs N?
No
Is therea Power outlet within 100 feet of installaFion
location?
Yes
The building location must be level to properly install the
nothing. Now 4vel Is the install locetion?
Within 4' of level
Will there be 18' of unobstructed workspace around the
perimeter of all roar walls?
vaa
Can the Installers pan, their Pickup truck 6 taller within
approximately SOP of your Installation site?
Yes
Substrate 5had will be Installed on?
Anchored to Concrete with Shed Four
Lnar
TUFF SHEU
512 Jetton Street
Jetton Street
Tampa FL 33619
4-443678
Base Details
Building Sine & Stine
Premier Ranch 10' wide by B' long
Door
p x 6'N Angle Shetl Door, Lein Xinge
Placement
Paint Selecemi
Base: No Paint, him: No Paint
Roof Selection
Shakewood Dimensional Premlom
Shingle
Odp Edge
Brown
Wall A
Wall D
Wall B
Options Details
Nigh Wiml
Nigh Wind - Retail
fl0or and Foundation
4 Ea Shed Anrhaf to Comrete A248,
Wage, Anchor
Velds
2 Ea 16" xg' Wall Vent - Brown
code. SeMcos
Permlthng and Engineering fee
Customer Signatur : Date:
Wall C
Jobsite/Installer Details
DD You plan to Insulate this building akar Tuff Shad
Installs N?
No
Is therea Power outlet within 100 feet of installaFion
location?
Yes
The building location must be level to properly install the
nothing. Now 4vel Is the install locetion?
Within 4' of level
Will there be 18' of unobstructed workspace around the
perimeter of all roar walls?
vaa
Can the Installers pan, their Pickup truck 6 taller within
approximately SOP of your Installation site?
Yes
Substrate 5had will be Installed on?
Anchored to Concrete with Shed Four