Loading...
HomeMy WebLinkAboutLovito BHBase Details Building Sine & Stine Premier Ranch 10' wide by B' long Door p x 6'N Angle Shetl Door, Lein Xinge Placement Paint Selecemi Base: No Paint, him: No Paint Roof Selection Shakewood Dimensional Premlom Shingle Odp Edge Brown Wall A Wall D Wall B Options Details Nigh Wiml Nigh Wind - Retail fl0or and Foundation 4 Ea Shed Anrhaf to Comrete A248, Wage, Anchor Velds 2 Ea 16" xg' Wall Vent - Brown code. SeMcos Permlthng and Engineering fee Customer Signatur : Date: Wall C Jobsite/Installer Details DD You plan to Insulate this building akar Tuff Shad Installs N? No Is therea Power outlet within 100 feet of installaFion location? Yes The building location must be level to properly install the nothing. Now 4vel Is the install locetion? Within 4' of level Will there be 18' of unobstructed workspace around the perimeter of all roar walls? vaa Can the Installers pan, their Pickup truck 6 taller within approximately SOP of your Installation site? Yes Substrate 5had will be Installed on? Anchored to Concrete with Shed Four Lnar TUFF SHEU 512 Jetton Street Jetton Street Tampa FL 33619 4-443678 Base Details Building Sine & Stine Premier Ranch 10' wide by B' long Door p x 6'N Angle Shetl Door, Lein Xinge Placement Paint Selecemi Base: No Paint, him: No Paint Roof Selection Shakewood Dimensional Premlom Shingle Odp Edge Brown Wall A Wall D Wall B Options Details Nigh Wiml Nigh Wind - Retail fl0or and Foundation 4 Ea Shed Anrhaf to Comrete A248, Wage, Anchor Velds 2 Ea 16" xg' Wall Vent - Brown code. SeMcos Permlthng and Engineering fee Customer Signatur : Date: Wall C Jobsite/Installer Details DD You plan to Insulate this building akar Tuff Shad Installs N? No Is therea Power outlet within 100 feet of installaFion location? Yes The building location must be level to properly install the nothing. Now 4vel Is the install locetion? Within 4' of level Will there be 18' of unobstructed workspace around the perimeter of all roar walls? vaa Can the Installers pan, their Pickup truck 6 taller within approximately SOP of your Installation site? Yes Substrate 5had will be Installed on? Anchored to Concrete with Shed Four