HomeMy WebLinkAbout6329-23033 For Approval_6-1-20 - signed (1)BUILDING DESIGN CODES
GENERAL LOADS
Roof Dead Load:
Roof Collateral Load:
Roof Live Load:
Tributary Live Load Reduction:
Metal Bldg. Only
3.00
20.00
Yes
psf
psf
Florida Building Code 2017
WIND LOAD
Wind Speed (3-sec gust) Vult:166
Vasd:129
Wind Exposure Category:C
Wind Condition:Enclosed
Internal Pressure Coefficient (GCpi):
mph
SNOW LOAD
Roof Snow Load (Pf):0.00
Ground Snow Load (Pg):0.00
Snow Exposure Factor (Ce):1.00
Snow Load Importance Factor (Is): 1.00
Thermal Factor (Ct):1.00
psf
psf
Rainfall Intensity (5 Min Duration):14 in/hr
SEISMIC LOAD
Seismic Importance Factor (Ie): 1.00
Spectral Response Acceleration (Ss):0.0500
Spectral Response Acceleration (S1):0.0250
Site Class:
Spectral Response Coefficients (Sds):0.0533
Spectral Response Coefficients (Sd1):0.0400
Seismic Design Category:A
Other Loads: 60'-0" x 16'-0" clear Higher Power Hydraulic Hangar Door
Per Building Jamb: DL = 4.8 kips V: WL = 26.6 kips H
Profile:Super Span X Gauge:26 Color:Galvalume Plus
ROOF PANEL
UL580 Class 90:Yes
Clip Type if Standing Seam:
Profile:Super Span X Gauge:26 Color:NEED COLOR
WALL PANEL
Occupancy Category:II - Normal
Edge Zone Width:6.00 Ft
+/-0.18
DEFLECTION CRITERIA
Main Frames Lateral:60
Main Frames Vertical:180
Bearing Frame Rafter:180
Endwall Columns:120
H/Roof Panels:180
Purlins:150
Wall Panels:90
Girts:90
L/
L/
L/
L/
L/
L/
L/
Steel Specification:AISC 360-10
Cold-Formed Specification:AISI S100-12
Red Oxide Primer
PRIMARY FRAMING
SECONDARY FRAMING
Red Oxide PrimerPurlins, Eave Struts:
Red Oxide PrimerGirts, Light Gage Columns:
Red Oxide PrimerLight Gage Jambs & Headers:
Built-Up & Hot-Rolled:
Hot-Dip Galvanizing conforms to the ASTM A123 specification.
Pre-Galvanized members conform to the ASTM A653, Grade 50,
Coating G-90 specification.
Building Code:
Sprinkler Load:0.00 psf
mph
V service:89 mph
Some panels and/or trims are furnished with a protective, peel-off film.
This film must be removed prior to field installation. Do not expose the
panels and/or trims to sunlight without immediate film removal. Film
must be removed from non-exposed panels and/or trims within six
months after film application or irreparable damage will occur to the
panel surface. Claims will not be accepted for this problem.
WARNING
GENERAL NOTES
APPROVAL NOTES
RESPONSIBILITIES
1. Approval of ALLIED Steel drawings and/or calculations indicate that ALLIED Steel has correctly
interpreted the contract requirements. This approval constitutes the customer acceptance of the ALLIED
Steel design, concepts, assumptions, and loadings.
2. Failure to respond to clouded areas and areas to verify may result in additional costs and/or schedule
delays for which ALLIED Steel will not be responsible.
3. Any changes made after the ALLIED Steel customer has signed and returned the ALLIED Steel drawings
and/or calculations and the project is released for fabrication shall be billed to the ALLIED Steel customer
including material, engineering, and other cost. An additional fee may be charged if the project must be
moved from the fabrication and/or the shipping schedule.
4. It is the responsibility of the customer to field verify all existing conditions prior to fabrication.
5. It is imperative that any changes to these drawings:
5.1.Be made in contrasting ink.
5.2.Be legible and unambiguous.
5.3.Have all instances of changes clearly indicated.
6. A dated signature, in the designated areas, is required on all pages. The signature must be from the
person authorized on the contract or a person authorized, in writing, by the ALLIED Steel customer.
7. ALLIED Steel reserves the right to resubmit drawings with extensive or complex changes required to
avoid misfabrication. This may impact the delivery schedule.
8. Any changes noted on the drawings not in conformance with the terms and requirements of the contract
between ALLIED Steel and its customer are not binding on ALLIED Steel unless subsequently specifically
acknowledged and agreed to in writing by change order or separate documentation.
9. The customer approves of all notes and conditions on the drawings and/or calculations by signing an
Approval Drawing Waiver Form.
1. Wall and liner panels are an integral part of the structural system. Unauthorized removal of panels or cutting
panels for framed openings not shown is prohibited.
2. Oil-canning, a perceived waviness inherent to light gauge metal, may exist. This condition does not affect the
structural integrity or the finish of the panel, and therefore is not a cause for rejection.
3. The primer for all cold-formed structural framing members contain a "wax-type" lubricant to facilitate
roll-forming. Hair-line crazing which may occur during forming operations is considered normal and is not a
cause for rejection.
4. All other primed structural members are given one shop coat (1.0 mils) of ALLIED Steel's standard red-oxide
primer designed for short term field protection.
5. All bolted connections for cold-formed secondary members use ASTM A307 1
2" x 11
4" bolts without washers
unless noted otherwise on these drawings. Refer to erection drawings for specific framing connections for
nonstandard conditions.
6. All bolted connections for primary framing members use ASTM A325 bolts without washers unless noted
otherwise on these drawings. High strength bolts shall be installed according to the Specifications for
Structural Joints Using ASTM A325 or A490 Bolts, Research Council on Structural Connections, December
31, 2009, and shall be tightened as Snug-Tight or Pretension as specified on these drawings.
7. Any type of suspended or load inducing system(s) is prohibited if zero collateral and zero sprinkler loads are
designated on the contract. This would include lights, duct work, piping, insulation types other than 3"
standard duty fiberglass blanket insulation, etc.
1. The ALLIED Steel Customer, hereafter referred to as the "customer", obtains and pays for all building
permits, licenses, public assessments, paving or utility pro rata, utility connections, occupancy fees and
other fees required by any governmental authority or utility in connection with the work provided for in the
Contract Documents. The customer provides at his expense all plans and specifications required to obtain a
building permit. It is the customer's responsibility to ensure that all plans and specifications comply with the
applicable requirements of any governing building authorities.
2. The customer is responsible for identifying all applicable building codes, zoning codes, or other regulations
applicable to the Construction Project, including the metal building system.
3. It is the responsibility of the customer to interpret all aspects of the End User's specifications and incorporate
the appropriate specifications, design criteria, and design loads into the Order Documents submitted to
ALLIED Steel.
4. It is the responsibility of ALLIED Steel to furnish the metal building system to meet the specifications
including the design criteria and design loads incorporated by the Contractor into the Order Documents.
ALLIED Steel is not responsible for making an independent determination of any local codes or any other
requirements not part of the Order Documents.
5. ALLIED Steel Buildings' standard specifications apply unless stipulated otherwise in the Contract
Documents. ALLIED Steel design, fabrication, quality criteria, standards, practice, methods and tolerances
shall govern the work any other interpretations to the contrary notwithstanding. It is understood by both
parties that the customer is responsible for clarifications of inclusions or exclusions from the Architectural
plans.
6. In case of discrepancies between ALLIED Steel's structural steel plans and plans for other trades, ALLIED
Steel's shall govern per Code of Standard Practice for Steel Buildings and Bridges in the AISC 330-10;
Section 3.3.
7. The customer is responsible for overall project coordination. All interface, compatibility and design
considerations concerning any materials not furnished by ALLIED Steel and ALLIED Steel's steel system are
to be considered and coordinated by the customer. Specific design criteria concerning this interface between
materials must be furnished before release for fabrication or ALLIED Steel's assumptions will govern.
8. Anchor rods and foundation embedment are designed, furnished, and set by the customer in accordance
with an approved drawing. Dimensional accuracy shall satisfy the requirements of Section 7.5.1 of Code of
Standard Practice for Steel Buildings and Bridges in the AISC 330-10.
9. All other embedded items or connection materials between the structural steel and the work of other trades
are located and set by the customer in accordance with approved location on erection drawings. Accuracy of
these items must satisfy the erection tolerance requirements.
10. ALLIED Steel does not investigate the influence of the metal building system on existing buildings or
structures. The End Customer assures that such buildings and structures are adequate to resist snow drifts,
wind loads, or other conditions as a result of the presence of the metal building system.
ERECTION NOTES
4. Erection tolerances are set forth per Code of Standard Practice for Steel Buildings and Bridges AISC
330-10 Section 7.13 except that individual members are considered plumb, level and aligned if the
deviation does not exceed 1:500. Variations in finished overall dimensions of structural steel framing are
deemed within the limits of good practice when they do not exceed the cumulative effect of rolling,
fabricating, and erection tolerances.
1.All bracing shown and provided by ALLIED Steel for this building is required and shall be installed by
the erector as a permanent part of the structure per Code of Standard Practice for Steel Buildings
and Bridges in AISC 330-10 Section 7.10.
2.Temporary supports, such as guys, braces, false-work, cribbing or other elements required for the
erection operation shall be determined and funished by the erector per Code of Standard Practice for
Steel Buildings and Bridges in AISC 330-10 Section 7.10.
5. As a general rule, field welding is not used to assemble a metal building system. In cases where the
drawings indicate field welding and in cases where approved corrections are to be made by field welding
the following requirements shall be met:
5.1.Welders must be qualified by an independent testing agency, with suitable documentation to AWS D1.1
Structural Welding Code - Steel or AWS D1.3 Structural Welding Code - Sheet Steel as
applicable, for the processes, positions, and materials involved.
5.2.All welds must be made in conformance to a documented and approved Welding Procedure
Specification (WPS). All joints which are not pre-qualified must be supported by a certified Procedure
Qualification Record (PQR) by an independent testing agency.
6. All documentation and records shall be the responsibility of the customer.
7. Any claims or shortages by buyer must be made to ALLIED Steel within seven (7) working days after
delivery, or such claims will be considered to have been waived by the customer and disallowed. All claims
should be directed to ALLIED Steel Buildings Customer Service Department.
8. Claims for correction of alleged misfits will be disallowed unless ALLIED Steel shall have received prior
notice thereof and allowed reasonable inspection of such misfits. Ordinary inaccuracies of shop work shall
not be construed as misfits. No part of the building may be returned or charges assessed for alleged misfits
without prior approval from ALLIED Steel.
9. Neither ALLIED Steel nor the customer will cut, drill or otherwise alter their work, or the work of other trades
to accommodate other trades unless such work is clearly specified in the contract documents. Whenever
such work is specified the customer is responsible for furnishing complete information as to materials, size,
location, and number of alterations prior to preparation of shop drawings per Code of Standard Practice for
Steel Buildings and Bridges in the AISC 330-10; Section 7.14.)
10. ALLIED Steel Buildings Field Modifications Policy:
10.1 ALLIED Steel will only be responsible for the field-modified parts designed and approved by the
ALLIED Steel Engineering Department.
10.2 Any field modifications designed by third parties may not be approved by ALLIED Steel and may limit
ALLIED Steel warranty and liability.
10.3 ALLIED Steel makes no warranty and hereby disclaims any responsibility with respect to the design,
engineering, or construction of any field-modified parts performed by third parties.
4.1.When crane support systems are part of the metal building system erection tolerances, then Chapter
9 of Common Industry Practices in the 2012 MBMA Metal Building Systems Manual shall apply. To
achieve the required tolerances, grouting of the columns and shimming of the runway beam may be
required. The customer shall provide grout if required. The contractor erecting the runway beams is
responsible for shimming, plumbing, and leveling of the runway system. When aligning the runway
beams, the alignment shall be with respect to the beam webs so the center of the aligned rail is over
the runway web.
3. Normal erection operations include the correction of minor misfits by moderate amounts of reaming,
chipping, or cutting and the drawing of elements into line through use of drift pins. Errors which require
major changes in the member configuration are to be reported immediately to ALLIED Steel by the
customer to enable whoever is responsible either to correct the error or to approve the most efficient and
economic method of correction to be used by others per Code of Standard Practice for Steel
Buildings and Bridges in AISC 330-10; Section 7.14.
Drawings listed under Drawings Index are submitted for approval. These drawings
represent ALLIED Steel's interpretation of our scope of work. You are reviewing these
drawings to confirm that ALLIED Steel has correctly interpreted the project requirements.
All dimensions, sections, details and notes require your review. All “clouded areas” must
be reviewed and addressed/answer before your project is placed within the schedule.
Please complete all field verifications prior to returning your approval drawings. ALLIED
Steel is not responsible for checking the material and/or design compatibility of
components not supplied by ALLIED Steel. ALLIE' SWHHO
V GUDZLQJV PD\ QRW PDWFK
DUFKLWHFWXUDOVWUXFWXUDO GUDZLQJV DQG VSHFLILFDWLRQV
Please sign and return marked either:
“Approved as Submitted” (no changes or corrections and project is released for
fabrication)
“Approved as Noted” (with corrections and/or changes clearly noted and project is
released for fabrication)
“Revise and Resubmit” (with corrections and/or changes clearly noted and revised
drawings will be resubmitted for approval)
Approved As Noted
Approved As Submitted
Revise & Resubmit
Approval Signature Date
Printed Name:
Desired Delivery Date:
CUSTOMER PROVIDE COLORS CDRAWING STATUS
FOR CONSTRUCTION PERMIT:
These drawings are by definition not final in that, as a minimum, piece markings are
not identified. Only drawings issued "For Erection" can be considered final.
FOR CONSTRUCTION:
These drawings are used for anchor bolt setting. Piece markings are not identified.
FOR ERECTION:
For final / erector installation.
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ONLY USE DRAWINGS ISSUED
"FOR ERECTION" TO ERECT BUILDING
ERECTOR NOTE
Drawing Description
C1 - Cover Sheet
E1 - Roof Framing Plan
E2 - Framing Elevation
E3 - Framing Elevation
E4 - Framing Elevation
Date
06.01.20
06.01.20
06.01.20
06.01.20
06.01.20
Issue
P
P
P
P
P
Drawing Index
P1 - Rigid Frame Elevation
06.01.20P
D1 - Standard Detail Page
06.01.20P
D2 - Standard Detail Page
06.01.20P
E5 - Framing Elevation
06.01.20P
F1 - Anchor Bolt Plan
F2 - Anchor Bolt Reactions
06.01.20
06.01.20
P
P
P2 - Rigid Frame Elevation
06.01.20P
E6 - Framing Elevation
06.01.20P
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
BLDG. A
1.00 psf BLDG. B
BLDG. A
BLDG. BPartially Enclosed
BLDG. A
+/-0.55 BLDG. B
BLDG. A
3.00 Ft BLDG. B
D
For components, claddings, and MWFRS, deflections involving wind are based on
10 year wind pressures.
Gauge:
Gauge:
Gauge:FL Eave:
FL Rake:
Corner:NEED COLOR
NEED COLOR
NEED COLOR
TRIM COLOR
26
26
26
Gauge:Accessory:NEED COLOR 26
Gauge:Base:NEED COLOR 26
F3 - Design Calc. Wind Report
P3 - Rigid Frame Elevation
P4 - Rigid Frame Elevation
D3 - Standard Detail Page
EX1 - Roof Panel Plan
06.01.20P
06.01.20P
06.01.20P
06.01.20
06.01.20P
P
Jun 2, 2020
ALLIED BUILDING SYSTEMS WILL NOT BE
RESPONSIBLE FOR LOCATION OF ANCHOR
WITH CONSTRUCTION PERMIT DRAWINGS
BOLTS ON THE CONSTRUCTION PERMIT DRAWINGS.
DO NOT SET ANCHOR BOLTS
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
BLDG. A
BLDG. BSECTION "X"
X
DETAIL @ SHEAR WASHERS
Jun 2, 2020
A F
COLUMN LINE
V
H
V
H
FRAME LINES:2 3 4 5
RIGID FRAME:MAXIMUM REACTIONS, ANCHOR BOLTS, & BASE PLATES
Column_Reactions(k )
Frm Col Load Hmax V Load Hmin V Bolt(in)Base_Plate(in) Elev.
Line Line Id H Vmax Id H Vmin Qty Dia Width Length Thick (in)
2 A 1 5.9 10.5 2 -11.8 -17.5 4 1.000 8.000 13.00 0.500 0.0
2 F 3 11.8 -17.5 1 -5.9 10.5 4 1.000 8.000 13.00 0.500 0.0
1 -5.9 10.5 3 11.8 -17.5
RIGID FRAME:MAXIMUM REACTIONS, ANCHOR BOLTS, & BASE PLATES
Column_Reactions(k )
Frm Col Load Hmax V Load Hmin V Bolt(in)Base_Plate(in) Elev.
Line Line Id H Vmax Id H Vmin Qty Dia Width Length Thick (in)
3*A 1 11.5 15.8 2 -18.3 -22.2 4 1.000 8.000 13.00 0.500 0.0
4 -9.8 -33.1
3*F 3 18.3 -22.2 1 -11.5 15.8 4 1.000 8.000 13.00 0.500 0.0
1 -11.5 15.8 5 9.8 -33.1
3*Frame lines:3 4
RIGID FRAME:MAXIMUM REACTIONS, ANCHOR BOLTS, & BASE PLATES
Column_Reactions(k )
Frm Col Load Hmax V Load Hmin V Bolt(in)Base_Plate(in) Elev.
Line Line Id H Vmax Id H Vmin Qty Dia Width Length Thick (in)
5 A 1 6.2 9.0 2 -11.9 -14.7 4 1.000 8.000 13.00 0.500 0.0
5 F 3 11.9 -14.7 1 -6.2 9.0 4 1.000 8.000 13.00 0.500 0.0
1 -6.2 9.0 3 11.9 -14.7
RIGID FRAME:BASIC COLUMN REACTIONS (k )
Frame
Line
Column
Line
-----Dead----
Horiz Vert
--Collateral-
Horiz Vert
-----Live----
Horiz Vert
--Wind_Left1-
Horiz Vert
-Wind_Right1-
Horiz Vert
--Wind_Left2-
Horiz Vert
2 A 1.1 2.3 1.0 1.4 3.8 6.8 -20.9 -31.5 -9.4 -22.3 -16.8 -22.9
2 F -1.1 2.3 -1.0 1.4 -3.8 6.8 9.4 -22.3 20.9 -31.5 5.3 -13.7
5 A 1.3 2.3 1.0 1.3 3.9 5.4 -21.2 -26.9 -9.7 -17.7 -17.1 -18.3
5 F -1.3 2.3 -1.0 1.3 -3.9 5.4 9.7 -17.7 21.2 -26.9 5.6 -9.1
3*A 1.9 3.2 1.9 2.5 7.6 10.1 -32.5 -40.1 -16.1 -27.9 -24.2 -23.9
3*F -1.9 3.2 -1.9 2.5 -7.6 10.1 16.1 -27.9 32.5 -40.1 7.8 -11.7
Frame
Line
Column
Line
-Wind_Right2-
Horiz Vert
--Wind_Long1-
Horiz Vert
--Wind_Long2-
Horiz Vert
-Seismic_Left
Horiz Vert
Seismic_Right
Horiz Vert
-Seismic_Long
Horiz Vert
2 A -5.3 -13.7 -11.6 -30.2 -12.2 -22.5 -0.1 0.0 0.1 0.0 0.0 0.0
2 F 16.8 -22.9 12.1 -24.2 11.7 -28.5 -0.1 0.0 0.1 0.0 0.0 0.0
5 A -5.6 -9.1 -11.9 -25.3 -12.4 -19.3 -0.1 0.0 0.1 0.0 0.0 0.0
5 F 17.1 -18.3 12.4 -19.3 11.9 -25.3 -0.1 0.0 0.1 0.0 0.0 0.0
3*A -7.8 -11.7 -18.3 -58.3 -18.9 -50.6 -0.1 -0.1 0.1 0.1 0.0 -0.3
3*F 24.2 -23.9 18.9 -50.6 18.3 -58.3 -0.1 0.1 0.1 -0.1 0.0 -0.3
3*Frame lines:3 4
ENDWALL COLUMN:BASIC COLUMN REACTIONS (k )
Wind Wind Wind Wind Wind
Frm Col
Line Line
Dead
Vert
Collat
Vert
Live
Vert
Left1
Vert
Right1
Vert
Left2
Vert
Right2
Vert
Wind_Press
Horz Vert
Wind_Suct
Horz Vert
Long1
Vert
2 A1 0.4 0.1 1.4 -4.6 -4.6 -4.6 -4.6 -6.6 -4.9 7.5 -3.2 -4.9
2 C 0.8 0.1 2.4 -7.7 -7.7 -7.7 -7.7 -13.5 -8.3 14.8 -5.6 -8.3
2 D 0.8 0.1 2.4 -7.7 -7.7 -7.7 -7.7 -13.5 -8.3 14.8 -5.6 -8.3
2 E1 0.4 0.1 1.4 -4.6 -4.6 -4.6 -4.6 -6.6 -4.9 7.5 -3.2 -4.9
5 E 5.4 0.0 0.0 0.0 0.0 0.0 0.0 -15.5 0.0 15.8 0.0 0.0
5 B 5.4 0.0 0.0 0.0 0.0 0.0 0.0 -15.5 0.0 15.8 0.0 0.0
Wind
Frm Col
Line Line
Long2
Vert
2 A1 -1.4
2 C -1.6
2 D -1.6
2 E1 -1.4
5 E 0.0
5 B 0.0
ENDWALL COLUMN:MAXIMUM REACTIONS, ANCHOR BOLTS, & BASE PLATES
Column_Reactions(k )
Frm Col Load Hmax V Load Hmin V Bolt(in)Base_Plate(in) Elev.
Line Line Id H Vmax Id H Vmin Qty Dia Width Length Thick (in)
2 A1 7 4.5 -4.6 8 -3.9 -5.6 4 0.625 8.000 8.000 0.375 0.0
1 0.0 1.9
2 C 7 8.9 -7.9 8 -8.1 -9.4 4 0.625 8.000 8.000 0.375 0.0
1 0.0 3.3
2 D 7 8.9 -7.9 8 -8.1 -9.4 4 0.625 8.000 8.000 0.375 0.0
1 0.0 3.3
2 E1 7 4.5 -4.6 8 -3.9 -5.6 4 0.625 8.000 8.000 0.375 0.0
1 0.0 1.9
5 E 9 9.5 3.3 10 -9.3 3.3 4 0.750 8.000 8.500 0.500 0.0
6 0.0 5.5
5 B 9 9.5 3.3 10 -9.3 3.3 4 0.750 8.000 8.500 0.500 0.0
6 0.0 5.5
NOTES FOR REACTIONS
1.All loading conditions are examined and only maximum/minimum H or V and the
corresponding H or V are reported.
2.Positive reactions are as shown in the sketch. Foundation loads are in
opposite directions.
3.Bracing reactions are in the plane of the brace with the H pointing away
from the braced bay. The vertical reaction is downward.
4.Loading conditions are:
1 Dead+Collateral+Live
2 0.6Dead+0.6Wind_Left1
3 0.6Dead+0.6Wind_Right1
4 0.6Dead+0.6Wind_Long1L
5 0.6Dead+0.6Wind_Long2L
6 1.01Dead+1.01Collateral+0.53Seismic_Right
7 0.6Dead+0.6Wind_Suction+0.6Wind_Long1L
8 0.6Dead+0.6Wind_Pressure+0.6Wind_Long1L
9 0.6Dead+0.6Wind_Right2+0.6Wind_Suction
10 0.6Dead+0.6Wind_Pressure+0.6Wind_Long2L
ANCHOR BOLT SUMMARY
Dia Proj
Qty Locate Type(in)(in)
32 Jamb 5/8"A307 2.50
16 Endwall 5/8"A307 2.50
8 Endwall 3/4"A307 3.00
32 Frame 1"A307 3.50
GENERAL NOTES
1. All anchor bolts (by others) to have nuts and flat washers.
2. All anchor bolts are designed to full S.A.E. diameters with cut threads.
No substitutions are allowed.
3. Allied is not responsible for the design, materials and workmanship of the foundation.
Anchor bolt plans prepared by Allied are intended to show only location, diameter, and
projection of anchor bolts required to attach the Metal Building System to the foundation.
Allied is responsible for providing to the Builder the loads imposed by the Metal Building
System on the foundation. It is the responsibility of the End Customer to ensure that adequate
provisions are made for specifying bolt embedment, bearing angles, tie rods, and/or other
associated items embedded in the concrete foundation, as well as foundation design for the loads
imposed by the Metal Building System, other imposed loads, and the bearing capacity of the soil
and other conditions of the building site. This is typically the responsibility of the Design
Professional or Engineer of Record, which is another reason that their involvement in the
Construction Project from the outset is highly recommended.
(2012 MBMA Metal Building Systems Manual, Section 3.2.2)
BUILDING BRACING REACTIONS
+-Reactions(k )Panel_Shear
Wall Col Wind Seismic (lb/ft)
Loc Line Line Horz Vert Horz Vert Wind Seis
L_EW 2 (h)
F_SW F 3,4 27.5 20.5 0.4 0.3
R_EW 5 (h)
B_SW A 4,3 27.5 20.5 0.4 0.3
Note
(h)Rigid frame at endwall
ALLIED BUILDING SYSTEMS WILL NOT BE
RESPONSIBLE FOR LOCATION OF ANCHOR
WITH CONSTRUCTION PERMIT DRAWINGS
BOLTS ON THE CONSTRUCTION PERMIT DRAWINGS.
DO NOT SET ANCHOR BOLTS
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
BLDG. A
BLDG. A
BLDG. A
BLDG. A
BLDG. A
BLDG. A BLDG. A
BLDG. A
BLDG. A
BLDG. B
BLDG. B
BLDG. B
BLDG. B
BLDG. B
BLDG. B
BLDG. B
BLDG. B
Jun 2, 2020
ALLIED BUILDING SYSTEMS WILL NOT BE
RESPONSIBLE FOR LOCATION OF ANCHOR
WITH CONSTRUCTION PERMIT DRAWINGS
BOLTS ON THE CONSTRUCTION PERMIT DRAWINGS.
DO NOT SET ANCHOR BOLTS
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
DETAIL @ RIDGE CAPDETAIL @ PANEL END
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
DETAIL @ RIDGE CAPDETAIL @ PANEL END
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
DETAIL @ RIDGE CAPDETAIL @ PANEL END
Jun 2, 2020
DETAIL @ RIDGE CAP
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
DETAIL @ PANEL END
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
BLDG. ABLDG. B SECTION "A"
EAVE STRUT DETAIL
Jun 2, 2020
36'-9 1/2"SSRC
36'-9 1/2"12'-1 1/2"
80'-0" OUT-TO-OUT OF STEEL
75'-0" OUT-TO-OUT OF STEEL75'-0" (400664BusseyHangar, 400685Leanto)12'-0" (400685Leanto)68'-0" (400664BusseyHangar)75'-0" (400664BusseyHangar)12'-0" (400685Leanto)68'-0" (400664BusseyHangar)25'-0"25'-0"25'-0"F
D
C
A
12'-0"22'-8"22'-8"22'-8"
1
2 3 4
5 7'-1 15/16"17'-10 1/16"25'-0"17'-10 1/16"7'-1 15/16"F
E
D
C
B
A
12'-0"22'-8"22'-8"22'-8"
1
2 3 4
5
ROOF SHEETING PLAN
PANELS: 26 Ga. SX - Galvalume Plus
REV DATE
DWN:CHK:DATE:ENG:
DESC:
REFERENCE:
JOBSITE:
CUSTOMER:
DESCRIPTION BY CHK
Endwall Framing
ISSUEJOB NO:DWG NO:
LOCATION:
BLDG. SIZE:
COUNTY:CITY OF HOUSTON REGISTRATION NO. 165 / STATE OF TEXAS FIRM NO. 12081UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
Install member screws at a
spacing of 5"-7"-5"-7" for
roof panels in from each rake X 8'-0.
NOTE!
(3)
(Shaded area)
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
SECTION AT ENDWALL STRAPPING
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
SECTION "B"
OPEN FOR HIGHER
POWER DOOR
NOT BY BLDG. MANUF.
Jun 2, 2020
RA2000
GIRT
LAPS
1"
12
3'-8"3'-10"3'-6"3'-8"11'-0"8'-0"19'-0"RF3-1 RF3-1RF1-1 RF2-1
E-1 E-2 E-3
DJ-3DJ-3DH-2
BB2000G
CB-1
CB
-
1
G-21 G-24
G-22
G-23
G-23
G-25
G-26
G-25
G-25
G-23
G-27
G-23
G-23
1
2 2 3
2'-1 3/4"
2'-1 3/4"
2'-1 3/4"
2'-1 3/4"
1
2
3 4
5
12'-0"22'-8"22'-8"22'-8"
12'-0" (400685Leanto)68'-0" (400664BusseyHangar)
80'-0" OUT-TO-OUT OF STEEL
WALL FRAMING: FRAME LINE F7'-2"6'-10"6'-4"9'-6"
FL-16D, MT-116
1"
12
1 2
WALL SHEETING & TRIM: FRAME LINE F18'-11 3/4"18'-11 3/4"18'-11 3/4"11'-8 1/2"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"BT-101CT-102CT-102FL-19, FL-19A
MT-116JT-101MT-116JT-101MT-116
HT-101
2 534
WALL SHEETING & TRIM: FRAME LINE F
PANELS: 26 Ga. SX - NEED COLOR
MEMBER TABLE
FRAME LINE F
MARK PART
400664BusseyHangar
DJ-3 8M35C14
DH-2 8M25C14
E-1 10ES140
E-2 10ES140
E-3 10ES140
G-21 8X25Z16
G-22 8X25Z12
G-23 8X25Z14
G-24 8X25Z16
G-25 8X25Z16
G-26 8X25Z14
G-27 8X25Z12
CB-1 1.25_ROD
CONNECTION PLATES
FRAME LINE F
ID MARK/PART
1 SA005
SPECIAL BOLTS
ID QUAN TYPE DIA LENGTH WASH
2 4 A325 1/2"1 1/2"1
3 4 A307 1/2"1 1/4"0
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
OPEN TO
REMAIN SECTION "C"
Jun 2, 2020
RF3-1 RF3-1RF2-1 RF1-1
E-4 E-2 E-5
DJ-3DJ-3DH-3
DJ-3DJ-3DH-3
DJ-3DJ-3DH-2
BB2000G
CB-1
CB
-
1
G-28 G-24
G-29
G-23
G-23
G-30 G-24
G-31
G-25
G-25
G-24 G-33
G-32
G-23
G-23
1
223
2'-1 3/4"
2'-1 3/4"
2'-1 3/4"
2'-1 3/4"GIRT
LAPS3'-8"3'-10"3'-6"3'-8"4'-4"19'-0"7'-2"9'-10"3'-4"9'-6"7'-2"9'-10"3'-4"9'-6"7'-2"9'-6"6'-4"6'-10"
RA2000
5
4 3
22
1
22'-8"22'-8"22'-8""12'-0"
68'-0""12'-0"
80'-0" OUT-TO-OUT OF STEEL
WALL FRAMING: FRAME LINE A
1"
12
11'-0"8'-0"19'-0"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"18'-11 3/4"11'-8 1/2"18'-11 3/4"18'-11 3/4"18'-11 3/4"BT-101CT-102CT-102FL-19, FL-19A
MT-116JT-101MT-116JT-101MT-116
HT-101
MT-116JT-101MT-116JT-101MT-116
HT-101
MT-116JT-101MT-116JT-101MT-116
HT-101
5 243
WALL SHEETING & TRIM: FRAME LINE A
PANELS: 26 Ga. SX - NEED COLOR
FL-16D, MT-116
1"
12
2 1
WALL SHEETING & TRIM: FRAME LINE A
MEMBER TABLE
FRAME LINE A
MARK PART
400664BusseyHangar
DJ-3 8M35C14
DH-2 8M25C14
DH-3 8M25C14
E-2 10ES140
E-4 10ES140
E-5 10ES140
G-23 8X25Z14
G-24 8X25Z16
G-25 8X25Z16
G-28 8X25Z16
G-29 8X25Z12
G-30 8X25Z16
G-31 8X25Z14
G-32 8X25Z12
G-33 8X25Z16
CB-1 1.25_ROD
CONNECTION PLATES
FRAME LINE A
ID MARK/PART
1 SA005
SPECIAL BOLTS
ID QUAN TYPE DIA LENGTH WASH
2 4 A325 1/2"1 1/2"1
3 4 A307 1/2"1 1/4"0
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
OPEN TO
REMAIN SECTION "D"
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
OPEN TO REMAIN
DETAIL @ PORTAL FRAME
SECTION "E"
Jun 2, 2020
X
ZEE LAP DETAIL @ THE LONG AND SHORT FLANGES
SECTION "X"
LAP LAYOUT
1/4" INDICATOR
HOLE LOCATION
TRAPEZE HANGER ~ 4" MAX. PIPE HANGER ~ 2-1/2" MAX. PIPE
ACCEPTABLE CONNECTION METHODS
Flange C-Clamp is not
an acceptable connection
NOTE:
Allied only provides the
roof purlin. All other material
and hardware is by others.
COLLATERAL LOADS FOR HANGER ATTACHMENT
flange is not acceptable
Connection through the
not an acceptable connection
Caddy clip attached to lip is
ACCEPTABLE CONNECTIONS FOR ALL
CAUTION:
Erector Note!
Failure to tuck facing of insulation
back from panel edge at the base
and eave could result in irreparable
panel damage and will void the
panel warranty.
STANDARD DETAIL @ BLANKET INSULATION
BUILT-UP SECTION LEGEND
W20851
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
Jun 2, 2020
ROOF PURLIN CONNECTION
AT MAIN FRAME ENDWALLA10
(2) 1/2 x 1-1/4 A307 REQUIRED AT STANDARD LAPS
(4) 1/2 x 1-1/4 A307 REQUIRED AT STRUT MEMBERS
A STRUT MEMBER IS A PURLIN LOCATED AT THE BRACE POINTS.
SEE PLANS FOR EXCEPTION TO SIZE & QTY OF BOLTS.
1/2 x 1-1/4 A307
ROOF PURLIN
FLANGE
END OF BUILDING
SEE PLAN
1/2 x 1-1/4 A307
(TYPICAL EA END)
BRACE
INDICATES ADD'L
BOLTS REQUIRED
AT STRUT PURLINS
RAFTER4"ANGLE
RAKE
ROOF MEMBER
SCREW
ANTI DETAIL AT ANTI-ROLL CLIP
RAFTER
FLANGE
PURLIN
SHOP WELDED
SHOP WELDED
ANTI-ROLL CLIP
PURLIN CLIP
1/2 x 1-1/4
A307 BOLTS
IS DETERMINED BY THE DESIGN FOR EACH SPECIFIC BUILDING.
CLIP ATTACHED. THE QUANTITY AND SPACING OF THESE CLIPS
SOME PURLIN CLIPS WILL HAVE AN ADDITIONAL ANTI-ROLL
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
Jun 2, 2020
UNLESS NOTED OTHERWISE, IT WILL BE ASSUMED THAT ALL INFORMATION SHOWN ON THESE DRAWINGS HAS THE AFFIRMATION OF THE APPROVAL/REVIEW AUTHORITY. FAILURE TO RESPOND TO
CLOUDED AREAS AND AREAS TO VERIFY MAY RESULT IN ADDITIONAL COSTS AND/OR SCHEDULE DELAYS FOR WHICH ALLIED WILL NOT BE RESPONSIBLE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR
TO FABRICATION. ALL SUBSEQUENT CHANGES AFTER THE FIRST SUBMITTAL WILL BE CONSIDERED AS CONTRACTUAL CHANGES.
APPROVAL/REVIEWING AUTHORITY: PLEASE REVIEW APPROVAL DRAWINGS CAREFULLY
ERECTOR NOTE: ONLY USE DRAWINGS ISSUED "FOR ERECTION" TO ERECT BUILDING
Jun 2, 2020