Loading...
HomeMy WebLinkAboutSoil Compaction ReportHeadquarters CA 11 t ENGINEEV G Mailing 11345 U.S. Highway 1 � PO Box 78-1377 Sebastian, FL. 32958 L—J A AND TESTING Sebastian, 589 2978 Orlando IL 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineefing.net DATE TESTED: March 4, 2020 KSM JOB #: 201073-1d/DJAO PERMIT#: NUC # 404 CONTRACTOR: R & E Loader Service Nuc Model: MC-1 Elite JOB LOCATION: 6004 Hickory Drive Nuc Serial #: 31404 Fort Pierce, Florida ITEM TESTED: Compacted Foundation Fill -1st and 2nd Lift TEST LOCATION PEN DRY MAX. DRY PERCENT OF SAMPLE DEPTH READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. N.W. 12" - 24" 40+ 111.1 113.3 98.1% 2. N.E. 40+ 111.1 98.1% 3. Center 40+ 114.5 101.1% 4. S.E. 0" -12" 40+ 110.6 97.6% 5. S.W. 37 109.9 97.0% Soil Description: 115.0 Brown Sand with Clay E I I I I I In Place Moisture: G 114.0 9.8% H I I I I I T Proctor Optimum Moisture: 113.0 11.0% P I I I � I • Proctor Max. Dry Density: P.C.F. C I I I I I 113.3 112.0—.._.i_.. .L_.._i._.. 1.. .. �.._..1 @ Test Locations the Density & I I I I I Penetrometer readings indicate the D 111.0 Degree of Compaction Meets I I I Minimum Required R Y I I I I I I I I for Unstaked Foundation 110.0 �••—•i—••—••——?•—••—i••—••-: • —• , 8 9 10 11 12 13 14 Respectfully Submitted: Moisture - % of Dry Weight Disclaimer: Contractor is responsible to maintain the tested area in the condition that KSM '4NCENSF.,c<,P completed the indicated, passed compaction test. KSM is not responsible if the tested area has been altered from�'k�. Fg Yee i p�149 07S i3c k APR 6 - 2020 PE "XSVAL �-`,.•'' 3/5/2020 Email to: mcarthuresther@bellsouth.net BY: Proudly Serving Florida since 1990