Loading...
HomeMy WebLinkAboutProposalPROPOSAL SUBMITTED TO JEFF LONG 10701 S. OCEAN DRIVE JENSEN BEACH, FL PH# 772-971.0754 EMAIL: ROCKNREEL9403@GMAIL.COM PROPOSAUCONTPACT 111L�Zgro - i6t-t-k 10751 ORANGE AVE FT. PIERCE, FL 34945 PH 772-460-6928 FAY 772-460-6929 SCC #131151026 DESCRIPTION OF JOB: BATTER PILE AND SLAB CONCRETE SEAWALL VENTURE III LOT 715 1. FURNISH AND INSTALL UP TO 35 L FT OF BATTER PILE AND SLAB TYPE CONCRETE SEAWALL 2. EXISTING WALL AND COMPONENTS TO REMAIN 3. NEW PANELS TO BE 12' LONG WITH 95 REBAR SET AT 1'+/-ON CENTER EACH WAY (CAST ON SITE) 4. NEW TOP CAP TO BE 14" X 28" WITH 5 PCS #5 REBAR CONTINUOUS AND #3 TIES SET AT 2'+/-ON CENTER 5. PILINGS TO BE 12" X 12" PRESTRESSED CONCRETE X UP TO 20' LONG AND DRIVEN VERTICAL AT EACH PANEL SEAM AND BATTERED (ANGLED 4 TO 1 +/-) AT MID PANEL (THIS WILL TIE WALL BACK- IN LIEU OF UPLAND ANCHORS) S. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO A MINIMUM CAPACITY OF 5 TONS EACH 7. FURNISH ACCESS THROUGH SEAWALL FOR ELECTRIC AND WATER INCLUDED A. WALL COST: $18,375.00 :RS•COMPENSATION INSURANCE AS' PER FEDERAL REGULATIONS FOR = ='-`Y ` •-` - MARINE CONSTRUCTION 2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED 3. PERMITS, PLANS, ENGINEERING AND ALL ASSOCIATED COSTS APPLIED OR OBTAINED BY WILCO CONSTRUCTION INC WILL BE PAID BY THE CUSTOMER AS AN EXTRA COST 4. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPE/SOD, ADDITIONAL FILL DIRT COSTS, ROCKAND/OR HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION, DOCK WORK, DREDGING, AND/OR HANDRAILS S. ROCKAND/OR HARD SUBSTRATE IF ENCOUNTERED REQUIRING REMOVAL THEN EXTRA CHARGES (AT COST) WILL APPLY 6. IN THE EVENT THAN EXCESSIVE DEBRIS (WOOD, CONCRETE, TREES, ETC) ARE UNEARTHED REQUIRING DISPOSALTHEN ADDITIONAL FEES WILLAPPLY (DISPOSAL COSTS) 7. WATER SUPPLY REQUIRED 8. FLOWABLE FILL BEHIND OLD WALL IF REQUESTED/REQUIRED EXTRA 9. PROPERTY MARKERS TO BE PROVIDED BY OWNER PRIOR TO COMMENCEMENT OF WORK 10. EMPTY LOT WITHIN COMMUNITY REQUIRED FOR CASTING OF CONCRETE PANELS AND/OR LOADING - UNLOADING OF REQUIRED MATERIALS (TO BE OBTAINEDINEGOTIATED BY OWNER PRIOR TO OUR ARRIVAUCOMMENCEMENT OF WORK) 11. ASSOCIATION APPRO'VALE FOR V;!ORI(T0 BE PEP,FORi IED TO SE OBTAIFIEO PP.IOR TO OUR OF WORK. PAYMENTS AS FOLLOWS: 5% OF CONTRACT UPON SIGNING, 25% OF CONTRACT 2 WKS+/- PRIOR TO COMMENCEMENT OF WORK, 25%OF CONTRACT UPON PANELS CAST, 25%OF CONTRACT UPON PANELS IN PLACE AND BALANCE UPON TOP CAP IN PLACE AND CLEAN UP DATE: 10/28/2019 AUTHORIZED SIGNATURE: READ THIS PROPOSALICONTRACT AND UNDERSTAND ITS TERMS AND CONDITIONS BE SIDE OF THIS FORM. WILCO IS AUTHORIZED TO DO THE WORK SPECIFIED IN THE ABOVE. ALL INVOICES ARE PART OF THIS PROPC /n DATE: RON EVERLY PAYMENT MADE AS STATED