Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Set-Up Manual
coW 4 a Rv h•S. ( h t � 4 ire UNIQUE ' 5 3 OVALS az - - 4, s a� TRUE, CIRCLES y, PnN HLE C�"' TRADITIONAL RECTANGLES 4° s Fxr A): POOL SIZE I SP ACE REQUIRED s' It is recommended to allow an additional 18" of space around the perimeter of your portable pool. For example: a 9' x 17' rectangle pool should have an �e PDOt area of IT x 20'.The larger dimension (l Tx 20') is referred to as a "Foot 1T 1T W Print". For the Legacy Circles,the "Foot Print' is approximately one foot larg- er than the actual size of the pool, due to the low profile of the framework. s' A 17' Legacy Circle would need an 18' "Foot Print". ta° B): HOW DO I FIND LEVEL? It is important that your pool be placed on level ground.Though your pool can tolerate being slightly out of level, it is best for proper filtration, as well as visual concern, to have your pool as level as possible. Here is a simple way how to find level ground. LNELtVEI N6 dr S xa � � �ru � �' �. 3 � +�y'v .kg bb ��4-M^ xa�� LY � S p �� � J"'t� `Z N Y`'}•�41TT'.-�` yl$f { ��.t �i� A"'p � � � i � . 'v�A P�ySF4 � Z� $Y�'h .q L�'TLA1 You will need: • Two small wooden stakes • Length of string, two feet longer than longest dimension of pool • One"Line Level" (Can be purchased @ any hardware store for about $1.50) I. Simply set one stake into the ground at one end of where the pool will be, and the other stake at the other and. 2. Tie the string stretched between both stakes, making sure it is stretched tight. 3. Now set the line level in approximately the center of the string. 4. Tap either stake further into the ground until the line level is reads "Level". S. Now measure the distance from the ground to the string at both ends. If one measurement is 4" at one stake, and 6" at the other stake, then you are only 2"out of level. --Q-- Q Q TOP RAIL VERTICAL POLES Q LOCKING PIN LOCKING PIN Opening Q CURVEDTOP RAIL © FL.R. 0 o cA o QQ a �= Q U-PIPE SIZE TOP RAIL VERTICAL POLES U-PIPES F.L.R Round Pipe Stand Pipe Bottom Pipe Final Locking Rail lox 19 13 28 14 1 14 X 23 13 28 14 1 14X27 15 32 16 1 Q TOP RAIL VERTICAL POLES LOCKING PIN @i LOCKING PIN Opening ® EI-R. © U-PIPE SIZE TOP RAIL VERTICAL POLES U-PIPES F.L.R Round Pipe Stand Pipe Bottom Pipe Final Locking Rail 17' 13 28 14 1 21' 17 36 18 1 Oo Q@ TOP RAIL O VERTICAL POLES Q LOCKING PIN Q LOCKING PIN Opening )� (� {� Q CORNER PIPE © U-PIPE ' SIZE TOP RAIL VERTICAL POLES U-PIPES CORNER RAIL Round Pipe Stand Pipe Bottom Pipe 9 X 17 12 24 12 4 13 X 21 16 32 16 4 j 13 X 25 18 36 18 4 17 X 29 22 44 22 4 STEP I Locate the area most suited for setting up the pool.Clear the area of any sharp objects or debris. STEP 2: Remove liner from carton marked "LINER; and place it in the center of where you plan to set up the pool. Be careful not to damage the liner when opening the box STEP 3: Unfold the liner. Note where the pump and filter system will be connected. Position the two circular openings marked "OUTLET'dnd `INLET'for easy connection to the pump and filter. STEP 4: Remove framework from carton marked "Frameworleand separate into three categories. • Top Rails (Curved and Straight,] Straight Rail will be Adjustable) • Wrtical Poles • U-Pipes STEP S: Locate the Flap Panel on the liner. This is where you will find your serial number. This is also where the Ad/ustableTop Rail will be located. STEP 6: Installing U-Pipes: Slip the U-Pipesthrough the U-Pipe Flopsloated around the base perimeter of the pool. Center the U-Pipeon U-Pipe Flopand extend flap outward. (See figure 1) Figure I STEP 7: InstallingTop Rails: It is recommended to lay out the Top Rails 1 (both curved and straight) along the perimeter of the pool.(See figure 2) This will help with the location of each Top RoiLThere K are a series of openings (I large / 2 small) around the top perimeter of the pool liner. The small openings are to accommodate the Ikrtical Poles The larger openings are to insert and center the Top Rails. Starting from either side of the Flap Panel start inserting the Top Rails through the large openings around the top perimeter of the pool.Connect the Top Rails (I to 2,2 to 3 & so on) using the locking pins to join one Figure 2 Top Rail to another. Make sure that all pins and holes are facing downwad before inserting through the liner openings. As you j connect the Top Roi/t make sure the connection is centered on the large liner opening. Continue to connect all Top Rails until you reach back to the Flap Panel ® r I STEP 8: Installing the Final Locking Raillhe last Top Rail to install ` will be the Final Locking Rail(F.L.R.) Pushing in one of the locking pins (on the F.L.R.) will allow you to condense the F.LR (See figure 3) While condensed,insert the FLR through the Flap Figure 3 Panel, and connect to the Top Rails to the left and right.Leave the F.LR. condensed until the vertical poles have been installed. tsureen 0 0 of o STEP 9: Instailingthrtical Poles: Place two Ikrtical Polesnext to each U-Pipe Connect all *rtical Polesto U-Pipes(s]ip fit);lay flat r+m•� on ground,facing away from center of pool. Holding the outer end of a 16rtical Pole lift. The U-Pipewiil simply rotate as you lift the *rtical Pole Lift the Top Rail, and slip the *rtical Pole through the smaller holes in the liner and into the Top Rail. Continue this process around the pool until all *rtical Polesare set in the Top Rail. Figure 4 Tip: The two Wrtical Polessetting into the Final Locking Raifwill take some effort,as the F.LR is not yet extended. STEP I& Extending the F.LRsimply hold the Wrtical Poleon either side of the F.LR, and pull away from each other. This will extend the F.LR. to its fullest position. The locking pins should snap into place automatically at full extension. Tip: It is easier to extend the F.LR. by holding the *rtical Poles - near the top. STEP I: Locate the area most suited for setting up the pool.Clear the area of any sharp objects or debris. STEP 2: Remove liner from carton marked "LINER and place it in the center of where you plan to set up the pool. Be careful not to damage the liner when opening the box. STEP 3: Unfold the liner. Note where the pump and filter system will be connected. Position the two circular openings marked "OUTLET'dnd"INLET'for easy connection to the pump and filter. STEP 4: Remove framework from carton marked "Ramework;"and separate into three categories. • Top Rail (I top rail will be Adjustahl$ • *rtical Poles • U-Ptpes STEP S: Locate the Flap Panelon the liner. This is where you will find your serial number. This is also where the AdjustableTop Rail will be located. STEP & Installing U-Pipes:Slip the U-Plpesthrough the U-Pipe Flapslocated around the base perimeter of the pool. Center the U-Pipe on U-Pipe Flapand extend flap outward. (See figure 1) STEP 1. Insta111ngTop Raffs: It is recommended to lay out the Top Rails along the perimeter of the pool.(See figure 2) This will help with the location of each Top Roil.There are a series of openings (1 large / 2 small) around the top perimeter of the pool liner. The small openings are to accommodate the Wrtical Poles The larger openings are to insert and center the Top Rails Starting from either side of the Flap Panel start inserting the Top Rails through the large openings around the top perimeter of the pool. Connect the Top Rails (I to 2,2 to 3 & so on) using the locking pins to join one Top Rail to another. Make sure that all pins and holes are facing downwad before inserting through the liner openingAs you connect the Top Ralk make sure the connection is centered on the large liner opening. Continue to connect all Top Rails until you reach back to the Flap Panel STEP & Installing the Final Locking Raill he last Top Rail to install will be the Final Locking Raif(F.LR.) Pushing in one of the locking pins (on the F.L.R.) will allow you to condense the F.LR(See figure 3) While condensed,insert the F.LR.through the Flap Panel and connect to the Top Rails to the left and right.Leave the F.LR condensed until the vertical poles have been installed. STEP 7. /nstalling%rtica/ Poles. Place two Wrtical Polesnext to each U-Pipe Connect all %rdcal Po/esto U-Pipes(slip fit);lay flat on ground,facing away from center of pool.Holding the outer end of a Wrtical Pole lift. The U-Pipewill simply rotate as you lift the Wrtical Pole Lift the Top Rail, and slip the Wrtical Pole through the smaller holes in the liner and into the Top Rail. (See figure 4) Continue this process around the pool until all {krtical Polesare set in the Top Rail. Tip. The two Ikrtical Polessetting into the Final Locking Rag will take some effortas the F.LR. is not yet extended. STEP 1 & Extending the F.LfFimply hold the Ikrical Poleon either side of the F.LR, and pull away from each other.This will extend the F.LRto its fullest position. The locking pins should snap into place automatically at full extension. Tip: It is easier to extend the F.LR. by holding the Wrtical Poles new the top. Figure I R 1 Figure 3 Candewr 0 0 of o 0 STEP I: Locate the area most suited for setting up the pool.Clear the area of any sharp objects or debris. STEP 2: Remove liner from carton marked "LINER, and place it in the center of where you plan to set up the pool. Be careful not to damage the liner when opening the box STEP 1: Unfold the liner. Note where the pump and filter system will be connected. Position the two circular openings marked "OUTLErdnd `YNLETYor easy connection to the pump and filter. STEP 4: Remove framework from carton marked "6amework"And separate into three categories. • Top Rails (to include 4 comer pieces) • :6rtical Poles • U-Pipes STEP S: Installing U-PfpesSlip the U-Pipesthrough the U-Pipe Flaps located around the base perimeter of the pool. Center the U-Pipe on U-Plpe Flapand extend flap outwad (See figure 1) STEP 6: InstallingTop Rails: It is recommended to layout the Top Rails along the perimeter of the pool. (See figure 2) This will help with the location of each Top Rall.AL each corner of the pool the liner is opened to insert the Top Rails It is recommended to connect the Top Rails for each side (4) independently, and insert through liner opening as one piece. Make sure all pins and holes are facing downward before inserting through the liner opening.Now connect the Comer Rails to the assembled Top Rails Tip: To make the last connection of the fourth Corner RaiJhave one person at the other end of the last Top Rail to be connected,hold the (already connected) Comer Rolland pull.This will allow for a much easier connection of the fourth and last Comer Rall(See figure 3) STEP 7: Installinglbrtical PolesPlace two Vertical Poles next to each U-Pipe Connect all f,6rUcal Palette U-Pipes (slip fit);lay flat on ground,facing away from center of pool.Holding the outer end of a 16rtical Pole lift. The U-Pipewill simply rotate as you lift the 16rtical Pole Lift the Top Rail, and slip the 16rtical Polethrough the smaller holes in the liner and into the Top Rail. (See figure 4) Continue this process around the pool until all 116rtical Polesare set in the Top Rail. Figure I 1 L I Figure 3 Figure 2 Figure 4 POOLS' Portable Pools Inc., Corporate Headquarters Tel: 949-494-6107 Fax: 949-494-4804 2825 Laguna Canyon Road Laguna Beach, CA92652 website: www.legacypools.com email:info@legacypools.com