Loading...
HomeMy WebLinkAboutInspection Docs Planning &Development Services Building 8i Code Regulation Division 2300 Virginia Ave ► Fort Pierce,FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL.TREATMENT PERMIT #: 1811-0285 JOB ADDRESS: 1651 Sweetbay Circle, Palm City, FL BUILDER/CONTRACTOR: jpfff Pauley Construction PEST CONTROL. CONTRACTOR: Patdck Exterminating PEST CONTROL LICENSE #: 4864 We,the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the rational Pest Control Association. I Square feet if area treated; 60 Linear feet Chemicals used; Cyper TC Percentage of solution: 25°lo Total i gallons used: 24 Date of Treatment: 618!20 Time of Treatment: 14:00 Footing Slab _,,;_11t Treatment 111 Treatment Re-Treat Re Treat ,_,driveway Pools 1st Treatment 1st Treatment Re-Treat Re-Treat other X. Perimeter for Final Inspection -1st Treatment Fite- 618/20 Treat Signature of 6termina or Note: there must ba'a completed form for each required treatment or re-treatment and this form must be on the,job site to be picked up by the inspector at time of each inspection or the scheduled Inspection will fall and a re-inspection fee charged. FBC104.2>6 Cert/fleate of Protective 7?estment for prevention of termitesA weather resistant j'vbsite posting board shall be provided to recelve duplicate Treatment Cortiricates as each,required protective treatment is completed, prodding a copy for the person the permit Is issued to and another copy for the building permit files ne Treatment Cetttfrcate shalt provide the product used,ldentity of the applicator, time and date of the treatment,site location,area treated,chemleal used,percent concentration and number cfgallvns used,to establish a verifiable record of protect/ve treatment. If the soil chemical barnler method for termite prevention is used.Anal exterior treatment shall be completed pnor to final building approval St Lucie County requires for the final inspection for CO,a Permanent Stacker to be placed on the electrical panel box cover,listing all the treatments and dates of applications. Xcvised 7/24/2014