Loading...
HomeMy WebLinkAboutBoundary SurveyBOUNUAF2Y SURVEY LEGAL DESCRIPTION: (Supplied by Client) LOT 15 IN BLOCK 5, WATERSTONE PHASE 2, ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 59, PAGES I THROUGH 2, OF THE PUBLIC RECORDS OF ST, LUCIE COUNTY, FLORIDA. ABBREVIATIONS: SET = SET 5/8" IRON REBAR WITH YELL CAP MARKED "PSM5543 FD = FOUND 5/8 IRON REBAR BIGHT OF WAY -MEASURED P = PLATTED C= RADIILUSUOFTCURVE L = LENGTH OF CURVE D= DELTA OF CURVE FFE = FINISHED FLOOR RLEVATION OH -OH -OH- =OVERHEAD WIREES X-X-X- = CHAINLINK FENCE PLASTIC FENCE 0-0-0- = FOOD FENCE CONIC. = CONCRETE C.P.= CONCRETE PAD Coy.= COVERED ® EPTER ® POWER E] ELECTRIC TER POLE BOX 09i G,9101, �09yf�r c^` o;P �O 00f- .Oo sFo -pile co Py SURVEYORS NOTES: I. UNLESS OTHERWISE NOTED 0 LY PLATTED EASEMENTS ARE SHOWN HEREON. 2, ALL LOT DIMENSIONS SHO�N ARE PER PLAT UNLESS OTHERWISE SHOWN. 3. NO UNDERGROUND UTILITIES OR IMPROVEMENTS WERE LOCATED UNLESS OTHERWISE SHOO 4, THIS SITE LIES WITHIN FLOOD INSURANCE RATE MAP ZONE X MAP# 12111C0070 J DATED: 2-16-12. 5. FLOOD ZONE SHOWN HEREON IS AN INTERPRETATION BY THE SURVEYOR AND IS PRONDED AS A COURTESY. THE FLOOD ZONE SHOULD BE VERIFIED BY A DEIER�IINATION AGENCY.+ 6, BEARINGS SHOWN HEREON ARE BASED ON THE EAST LINE OF WATERSTONE PHASE 2 AS BEING N00'05'59"W ACCORDING TO THE PLAT DESCRIBED HEREON. 7, P,U.D.E. DENOTES PUBLIC UTILITIES AND DRAINAGE EASEMENT, U.E. DENOTES UTILITY EASEMENT, & THE ACCURACY OF THIS SURVEY IS PREMISED ON THE EXPECTED USE OF THE SURVEY, THE 'EXPECTED USE / PURPOSE OF THIS SURVEY IS VACANT LOT PURCHASE. ACCURACY=1 FOOT IN 7,500 FEET OR BETTER. 9. ADDITIONS OR DELETIONS TO THIS SURVEY MAP BY ANYONE OTHER THAN THE SIGNING SURVEYOR IS PROHIBITED WITHOUT WRITTEN CONSENT. r = DRAINAGE PROPOSED ",dry = EXISTING ELEVATION' oY = PROPOSED ELEVATION PROPOSED PLOT PLAN (OUBJEdT TO•dONTRAdToP HEALTH DEPT.. AND BUIIJIINd DEPT. APPROVAL) ALL ELEVATIONS SHOWN HEREON ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988(N.AVD.'88) ��' \ �s�'S• �q<1Or MIN. SETBACK RE( ro \ °Os •^,nrf. tea, FRONT (SSLG IDES NR S1D1S OAR S IdNG. o��eti°o \ Rio TECH. fY' f N o � � / L STE BENCHMARK 'MAIL AND DISK" SQ�P�� Q PGA N AV•D. '88ROAD ELEVATION = 19.98 SQL