Loading...
HomeMy WebLinkAboutPermit WorksheetsPERMIT WORKSHEET PERMIT NUMBER ���� �I`'�.[� New Home Used.Home. Installer �1111LC./I/f n License# Lv�f�l i LD ( 13-:.7 Home installed to the Manufacturer's Installation Manual Address of home being installed Manufacturer Ni5fpya_ w­ Length xwidth 14 -f,• ��4 NOTE. if home is a single wide rill out one half of the blocking plan if home is a triple or quad wide sketch in remainder of home I understand Lateral Arm Systems cannot be used on any home (new r used) where the sidewall ties exceed 5 ft4 in. Installer's initials Typical pier spacing� I / letaa 2' Show locations of r_ongituainai ano Lateral systems ta'gnl,airei (use dark lines to show these locations) --'----------------------` --- ' ------------------------------- rreriopew w thn2'oroo of homy -r-r-i n-l-r-r-r-r-i n-T- T% r-r-I 1 T-7-r-i-i -1 "I-I-T I-r-r-i l j-T-r-r-fYl-i-I a-rl t;T_ I IJ1_�_L_;_iJ_J_�_1_L_i_J_ J_i_.l_._L_�i_J_1_i_._' ;_L-_J_J'C _1 _L_L_L I I II 11 I 1 1 I I 1 t 1' F I J a ' I 11 1 1 I I L _L _I_J-J_ �J_J_J-l_V_L L. 1 J 4 ♦ L_ L L L 1 J J ♦ 4 L L 1 11 I I I I 1 I 1 I I I I 11 1 I �I I i J 1 I I I 11 1 1 1 I I I r-r-1-r+- r rT-•-r-r-r-r -���-r- -r- _r-'-�-'-T-r-r-�-' J_J_L_ Home is installed in accordance with Rule 15-C Single wide Double wide Triple/Quad NN page 1 of Z, ti Wind Zone II 0 Wind Zone III Installation Decal # Serial # PIER SPACING TABLE FOR USED HOMES w . ON mi KM70M iiaiiFii4+ia+I+iii1l71�s7��r��t7�t7� interpolate rom a TbUl pier spacing . PIH2 PAD SIZE I-beam pier pad size Perimeter pier pad size Other pier pad sizes (required by the m1g.) J Draw the approximate locations of wall openings 4 foot or greater. Us symbol to show the piers. Listall marriagewall openings greatertht and their pier pad sizes below. Opening Pier pad size POP R D ANC/HORS 4ft ✓ 5ft FRAM E TI6 within 2' of end of horg.er�_ spaced at 6 4" oc ✓✓ TI®OWN COMPONENTS OTHERTIES Number Longitudinal Stal 'i i Dev) a LSD) Sidewall Manufacturer Longitudinal Longitudinal Stabilizing Device w/Lateral Arms Marriage wall Manufacturer Shearwal I PERMIT WORKSHEET PERMIT NUMBER I POCKET PENETROMETER T The pocket penetrometer tests are rounded down to Lcap) psf or check here to declare 1000 lb. soil without testing. X X X POCKET PENETROMETER TESTING METHOD 1. Test the perimeter of the home at 6 locations. 2. Take the reading at the depth of the footer. 3. Using 500lb. increments, take the lowest reading and round down to that increment. X X The results of the torque probe testis inch pounds or check here if you are declaring -5' anchors without testing . Atest showing 275 inch pounds or less will require 5 footanchors. Note: Astate approved lateral arm system is being used and 4 R anchors are allowed atthe sidewall locations. I understand 5 It anchors are required atall centerline fie points where the torque test reading is 275 or less an where the mobile home manufacturer may requires anchors with 4 I Iding capacity. Installer's initials ALL TESTS MUST BE PERFORMED BY ALkCENSED INSTALLER Installer Namea fliti� Date Tested Dnnect electrical conductors between mulfi-wide units, but notto the main power )urce. This includes the bonding wire between mult-wide units. Pg. Pium omg onnectall sewer drains toanebsfingsewer tap orseptic tank. Pg: onnect all potable water supplypiping to an e>dsting water meter, water tap, orother page 2 of 2 Slife-15-re—paration Debris and organic material removed Water drainage: Natural Swale Pad Other Fastening multi wide un Floor. Type Fastener: Length: Spacing: Walls: Type Fastener: Length: Spacin . Roof. Type Fastener: Length: Spa ' g: For used homes a min. 30 gauge, 8"wide, van9 d metal strip will be centered over the peak of the roof a fastened with galy. roofing nails at 2" on center on both sid of the centerline. Gasket (woathurp roof in oq ul roment I understand a properly installed gasket' a requirement of all new and used homes and that condensation, mold, Idew and buckled marriage walls are a resultofa poorly installed or no ga et being installed. I understand a strip of tape will not serve as a gasket Installer's initials Type gasket Installed: Pg. Between Floors Yes Between Walls Yes Bottom of ridgebeam Yes ea erproo mg The bottornboa/ny7nstalled be repaired and/ortaped. Yes Pg. Siding on unitstalled to manufacturer's specifications. Yes Fireplace chimso as not to allow intrusion of rain water. es isMiscellaneous Skirting to installed. Yes ./ No _�L Dryer ventyyyyyy' stalled outside of skirting. Yes N/A�_ Range nflowvent installed outside ofskirting. Yes N/A Drain lin s supported at foot intervals. Yes Electri I crossovers protected. Yes L Other Installer verifies all information given with this permit worksheet is accurate and true based on the manufacturer's inSpllation instfVgtions and or Rule Installer Signature Date/)- `/ -1 page 1 OLIVER TECHNOLOGIES, INC. revision 6(07 FLORIDA INSTALLATION INSTRUCTIONS FOR THE MODEL 1101 'V'SERIES ALL STEEL FOUNDATION SYSTEM MODEL 1101"V" (STEPS 1-15) LONGITUDINAL ONLY: FOLLOW STEPS 1-9 FOR ADDING LATERAL ARM: Follow Steps 10.15 FOR CONCRETEAPPLICATIONS: Follow Steps 16-19 ENGINEERS STAMP ENGINEERS STAMP 1. SPECIAL CIRCUMSTANCES: If the following conditions occur - STOP! Contact Oliver Technologies at 1-800-284-7437 : a) Pier height exceeds 48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96' e) Location Is within 1600 feet of coast INSTALLATION OF GROUND PAN 2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) . 3. Place ground pan (C) directly below chassis I-beam . Press or drive pan firmly into soil until flush with or below soil. -SPECIAL NOTE: The longitudinal "V" brace system serves as a pier under the home and should be loaded as any other pier. It is',recommended that after leveling piers, and one-third inch (113") before home is lowered completely on to piers, complete steps 4 through 9 below then remove jacks. INSTALLATION OF LONGITUDINAL "V" BRACE SYSTEM NOTE: WHEN INSTALLING THE LONGITUDINAL SYSTEM ONLY, A MINIMUM OF 2SYSTEMS PER FLOOR SECTION 15 REQUIRED. SOIL TEST PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBE TEST READINGS ARE BETWEEN 175 & 275 A 5 FOOT ANCHOR MUST BE USED. IF PROBE TEST READINGS ARE BETWEEN 276 & 350 A 4 FOOT ANCHOR MAY BE USED. USE GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 51" . VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH VERTICAL TIE CONNECTION POINTS (PER FLORIDA REG.). 4. Select the correct square tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a 40 to 45 degree angle is maintained. PIER HEIGHT 1.25" ADJUSTABLE 1.50' ADJUSTABLE (Approx. 45 degrees Max.) Tube Length Tube Length 7�r 7 3/4" to 25" 22" " ' 18" 24 314" to 32 1/4" 32" 18" 33" to 41" 44" 18" 40" to 48" M., 18 5. Install (2) of the 1.50" square tubes (E (18" tube) ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final adjustment. 6. Place I-beam connector (F) loosely on the bottom flange of the I-beam. 7. Slide the selected 1.25" tube (E) into a 1.60" tube (E) and attach to I-beam, connectors (F) and fasten loosely with bolt and nut. 8. Repeat steps 6 through 7 to create the "V" pattern of the square tubes loosely in place. The angle is not to exceed 45 degree and not below 40 degrees. 9. After all bolts ;are tightened, secure 1.25" and 1.50" tubes using four(4) 1/4"-14 x 314" self -tapping screws in pre -drilled holes. INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM THE MODEL 1101 W" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STABILIZER PLATES S FRAME TIES. NOTE: THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT SW'. FOUR FOOT (4') GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. 10. Install remaining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline anchors to be sized according to sail torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 lbs. require a 5' anchor per Florida Cade. 11. NOTE: Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location. This frame tie 8 stabilizer plate needs to be located within 18" from of center ground pan. 12. Select the correct square tube brace (H) length for set-up lateral transverse at support location. The lengths come in either 60" or 72" lengths. (With the 1.50" tube as the bottom tube, and the 1.25" tube as the inserted tube.) 13. Install the 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut. 14. Slide 1.25" transverse brace into the 1.50" brace and attach to adjacent I-beam connector ( I ) with bolt and nut. T� OLIVER TECHNOLOGIES, INC. Telephone: 931 798 4555 1-800-284.7437 Fax: 931 796 8811 02/02/2018 www.oliveriechnologies.com Page 2 rNSTALLATION USING CONCRETE RUNNER / FOOTER revision 6/07 1B. A concrete runner, footeror slab may be used in place of the steel ground pan. a) The concrete shall be minimum 2500 psi mix b) A concrete; runner may be either longitudinal or transverse, and must be a minimum of 8" deep with a minimum width of 16 inches longitudinally or 18 inches transverse to allow proper distance between the concrete bolt and the edge of the concrete (see below). c) Footers must have minimum surface area of 441 sq. in. (i.e. 21" square), and must be a minimum of 8" deep. d) If a full slab is used, the depth must be a 4" minimum at system bracket location, all other specifications must be per local jurisdiction. Special inspection of the system bracket installation is not required.. Footers must allow for at least 4" from the concrete bolt to the edge of the concrete. NOTE: The bottom of all footings, pads, slabs and runners must be per local jurisdiction. LONGITUDINAL: (Modell 1101 LC "V") 17. masonry bit, holes, then p down by hittir 18, Forwetset - mark bolt h( blown out of connector at the top of IN 19. When using • C • • • in # 1101-W-CPCA (wetsetl. simply install the bracket in runnerlfooter OR When installing In cured concrete use Part # dryset). The 1101 (dryset) CA bracket is attached to the concrete using (2) 5/8"x3" concrete wedge bolts (Simpson part # X 3" or Powers equivalent). Place the CA bracket in desired location. Mark bolt hole locations, then using a 5/8" diameter ill a hole to a minimum depth of 3". Make sure all dust and concrete is blown out of the holes. Place wedge bolts into drilled :e 1101 (dry set) CA bracket onto wedge bolts and start wedge boltnuts. Take a hammer and lightly drive the wedge bolts the nut (making sure not to hit the top of threads on bolt): The sleeve of concrete wedge bolt needs to be at or below the too triplets by tightening nuts. 1101 TC "V") rn # 1101-W-TACA) installation simply install the anchor bolt Into runner/tooter. For dry set installation (part # 1101-D-TACA) locations, then using a 5/80 diam. masonry bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is 9 hole. Place wedge bolts (Simpson part #S1623001-1 5/8" X 3" or Powers equivalent) into (D) concrete dry transverse Into drilled hole. If needed, take a hammer and lightly drive the wedge bolts down by hitting the nut (making sure not to hit ids on bolt), then remove the nut. The sleeve of concrete wedge bolt needs to be at or below the too of concrete rt # 1101 CVW (wetset) or 1101 CVD (dryset), install per steps 17 & 18. Notes: 1. LENGTH OF HOUSE IS THE ACTUAL BOX SIZE 2. •=STABIUZERPIATEANDFRAMETIELOCAnON (needsto bebaledvg7 n 18ildtesol'asn acfgioundpatercorlae(e) 3. K]-- LOCATION OF LOW41UDINALBRACING ONLY 4. �TRANSvERSE&LONGffUDINALLOCATIONS ALL WIDTHS; • • • • UP TO 52' ALL WIDTHS; AND LENGTHS OVER 52' TO 80' • 0 Ll • • • HOMES WITH 5112 ROOF PITCH REQUIRE: PER FLORIDA REGULATIONS 6 systems for;home lengths up to 52'and 8 systems for homes over52' and up t30'. One stabilizer plate (#i'tf9f%%e'tie requiredat each lateral bracing system. be tame manWeGurers spell Orations for sidewag ¢asps era in exrets of 4,000 ms. These Wcatons nowme a 5' nchm Par Florida Coda. is D Ground : Pan 'transverse -, mmectors I Transverse arm I beam wren' w „ H Transverse am Top (1.25-) bottom (1.5') I F V brace I beam oonectore J ground Pan V Brackef i / /E V&ace�Tu6d/ Bottom (1.5').)) `•,.- JC Ground Pan Longitude dry concrete bracket part # 1101 D-CPCA Wet bracket part # 1101 W-CPCA not shown page 3 revision 6107 C = GROUND PAN D = GROUND PAN CONNECTOR U BRACKETS TRANSVERSE E = TELESCOPING V BRACE I TUBE ASSEMBLY W/ 1.5 BOT- TOM TUBE AND 1.25 TUBE INSERT F ='W BRACE I -BEAM CONNEC- TORS ASSEMBLY H = TELESCOPING TRANSVERSE ARM ASSEMBLY I = TRANSVERSE ARM I -BEAM CONNECTOR J= V PAN BRACKET Model # 1101 "V" earn Flat camp Alternate Hole for 111 Per Asr:embly Narrower Beam Flange -' Grade5 IQ'x I' Carnage Bolt 8 Nut Grade 5 - L'2-x 2 12' Camay¢eol a Nut I -BEAM CONNECTOR BRACKET FbACa approved 4' gmund anchors; may be used In as ocelkins except where home ' I manWaWresspedreations- Ibr sideviae straps are M areas of 4.000 Bs. TheI Transverse am f beam ri •- .i The" i ' cunmctw . ocations rel a 5' amhor. ' net Florida Coda. H Transverse am Top(1.25) IUD Concrete. <.-/ F :V Dram I beam 1 U bracket Y �c�\�\ cmnedaa 'transverse @. J Concrete Its -V'Breast E Y Brace Tuod/ v- / Top (1.25-) Bottom (1.5') J � Cmaeta FONer/ Rumor 02/0212018 Model # 1101 C "V" OLIVER TECHNOLOGIES, INC. 1-800.284-7437 Model 1101 CVD Model 1101 CVW not Shown C = CONCRETE FOOTER/RUNNER D = CONCRETE U BRACKET TRANSVERSE CONNECTOR (connects with grade 5 -12- x 2 In— carriage bolt & nut) E = TELESCOPING V BRACE TUBE ASSEMBLY W/ 1.5 BOT- TOM TUBE AND 1.25 TUBE INSERT F = V' BRACE I -BEAM CONNECTOR ASSEMBLY (connects with grade 5 - 1/2' x 4- carriage bolt & nut) H =TELESCOPING TRANSVERSE ARM ASSEMBLY I = TRANSVERSE ARM I -BEAM CONNECTOR (connects with grade 5 -10 x 2 12— carriage bon & nut) J= CONCRETE 'V' BRACKET (connects with grade 5 - 1/2' x 4' cartage bolt & nut) Telephone: 931 796 4565 Fax: 931 796 8811 www.ofiverterhnologies.com RCNCIRCULAR bRem" RECFITSI0 4Av03Al ef1DN1. UJSURED IERnCALIr --Rom THE ;LD,C, PLA(Q fJIJ A'LVG ME [RC.] LC5',L. CR �n5t SUiFaCE CT RAMP gOpf. SNAIL BE NCI : SS MAN N :NCRES PAD Nor VORC LAN Jq INCHES. •NA.vDRf1L cHALL SC P:OLIDE9 dl AT LE- YCE Of EACH CO::LNVOuF RLu Cr TqE ACS DE TIKv-r NaS2TH ORE FOUR OR MIT, RISERS A -CRAB. ASSEN3l'_S I, O:ARtS StALL BF CC51GNc0 TO gESST DAD CE !D PLF A2FULD n ANI DAFCCBSN AT :INSME T0a AND IO (Li FIRE WADOI?ROH Tt( SUPPORtS TO MC S;RUCTJRC aL Gua253 uaR[ u]D:. u. N\R CP cl-- ERN. 2 % 2 HILUs vt . (3) SOFSJPs SDS 1/<- x E-1/2- — MOCO SCR!\ FDR RIM JO5T TO P05T DONNE:ROT, (5) :60 NAIS OR EOUIV4 ENT °. T- 5RP Le40'hG FLCOR FASIENFp_ i0 HOST FLCDR 12EM3EAS USMC YMaCNS I/^ x 0-1/2' IDS V= SCRE%S OR [0.Yv a1 1:" O.0 SLGGEPED SCREW PATTERN 16• CC F_OOR2J?5?S UL'w (5) l6<Sr.l6Ooi CCJNA(FNT AT rACY. "IT TO RIM JOIST CON NECROI. uAxRMM mica .L V17 SIMI DC N,/. ll N RR Rrs[R L DE PEA•uim ]ERPcwLT IUTRLu L<w.c mrEs d ME Mal NM,, ne w(+rti( Rise IKlpll MRW ul. n'DNl 'MRS 511ALL x01 EM11. I, W,ast Or WK lux ]/$ :N[`I. R[WYV IR(a] :(R(.1 Pl\LL PE 10NLN_S R1E IWaO DCPn SRIA II MAC O, "TAFT" D[RLDI IT \,mat ME fC9[uC51 PoOCCI:cN $JKINI 1REa0$ aiN a; 1 RPII .4Y.{( To PF li(+0'$ «A"G [ME Fµrtsl Inca «nn Mnw on NWI a I,.S S..a !PR [rttro m[ :%G ]D- GROUND ANCHOR 1 SAP SNAP TO iQAP AROJND G T 2 %06 ROIILT (00 NOT MIT TCNIOII STN,P3) sruR AYD W.ORG NLW.i'p. (EACH SPJES OF LAN9R2G) REttw[D (1) 2 x 6 P.T. ATTACHED TO POSTS r-e• oxnK NOw. _ D s;[PS (upA) OSRJG 5,) 160'YES ORCW2VAL(NI AT CACH <-P AN4NR N(Fjli I Stry$ (uq,) 2%6 10 PoST COINECROR 5/I- % G BCARO RAIL CAP ALL ROT U.O' OF A (' OIAVET-LR SPIFRE 2 2 A TOP h BOTTOM ATTACNEO 10 r0 POSTS WN (2)1$ 'A", SCRE<S bA visO( FACE. MLNIVOS FOR RECITMO GUAROS ON mC S:OE 0' START MEADS S11ALl 110; ALLO'IJ A SRNENE A-3/6- TO PASS THROUGH. /.///. i EXISTING STRUC IDS 2 % I Pt. WVOER (S°H w1=1O 1.n' SwO..i luzc D 11, Us GSIS un rB !vl/ kul" (1)a MDOD SCREW ORCCUN 'ARO a OW p[(N.$R0)NpKquG SIW<RRYJS Iq..a M Y: ,m[ ID, V 1. 'o Oq<i' W== IDRT W ." 6H. CDtlCREIF C'M IP S1EFS ARC INSTa0.E0 O2 E%ISO2R0 CONCRETE. 4C GROJN] ANC AN AND TEDORN SNAP CAN BE CNITtEO. (3) 2 % 12 P.1. STAIR SN:NCERS THE P.T N x + FOSTS SHA,L BE ANCHORED TO THE E%ISONC CONCRETE SLAB MIND SUIP50N'S L-BRACKET OR ECNVALEvt NQT mliaACIOR SHAI RF RF -ON pIF FOR LTRIFFI Al( n1N YSIOhc D FN FOrjqMRUCl?0N. ASTFI IN ALf STAIR POLIPoNrNT< TO RF FR WF TREATED I MRFR AI 2 F )FRS CONTAf.T PATH P T N IIIIRFR TO R: NOT Q••• +.. .,. OB STA 2STEEL R Ai 30-20W OCENr 96 =ylL SA7 E �iV� L aG' VMa •aI w+RIXSGv.Trcm,crv..I P-ml V.AR•Ull xx«e-w-lrero-c..R nwnl IluRny<� ]1!F &.KIsry .SY IW� 4+N'recR]in52 � .ac-Iciw 4 VERTICAL VINYL SKIRTING ( conVonant• 6 inatRllation L TD� yAT.'rAt)1fG WITH T fnew SOQEMS Ib IA7Afr SNAPS IN TO -bo sAbt Mines SCRAWS AMO ►AMW.L G..T3 V 11iTcn PANFL---.« 3.9 IA4w-s fts FOOT a[v �ErrluTww S�wRa>• TO Tar. BACK AND %WrTbrA RAIL, wm sLArws l M OL �%LL OAME LS ARC ACLfI QLE ReT4%aLI1M6'rbe RbwT dun ftLIJY/ VP ON YMIICLJ AT'rd%C 4[C -i'p GRolllul% W ITN T MICA OALiVAngZEC NAIL IQ 400 (W SOIL IS 31LNOY-T116N 9)L"Oti s 02/02/2018