Loading...
HomeMy WebLinkAboutProposalPROPOSAUCONTRACT WILCO CONSTRUCTION INC. 10751 ORANGE AVE FT. PIERCE, FL 34945 PH 772-460-6928 FAX 772-460-6929 SCC #131151026 PROPOSAL SUBMITTED TO: DESCRIPTION OF JOB: VINNY GAROFALO BATTER. PILE AND SLAB VENTURE 3 LOTA13 CONCRETE SEAWALL I PH# 917-626-2599 VENTURE III LOT A13 ENTAIL- GEEZOOCREW@AOL.COM t WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: 1. FURNISH. AND INSTALL UP TO 60 L FT OF -BATTER PILE AND SLAB TYPE CONCRETE SEAWALL 2. EXISTING WALL AND COMPONENTS TO REMAIN 3. NEW PANELS TO BE 1O' X 12' X 8" WITH #5 REBAR SET AT 1' +/- ON CENTER EACH WAY (CAST ON SITE) 4. NEW TOP CAP TO BE 14" X 28" WITH 5 PCS 05 REBAR CONTINUOUS AND 93 TIES SET AT T+/- ON CENTER S. PILINGS TO BE 12" X 12" PRESTRESSED CONCRETE X UP TO 20' LONG AND DRIVEN VERTICAL AT EACH PANEL SEAM AND BATTERED (ANGLED 4 TO 1 +/-) AT MID PANEL (THIS WILLTIE WALL BACK- IN LIEU OF UPLAND ANCHORS) 6. ALL PILINGS TO BE FINAL HAMMER DRIVEN TO A MINIMUM CAPACITY OF 5 TONS EACH WALL COST-$525.00 PER FT NOTES: WICCOCONSTRUCTION CARRIES U:S.L:S, H WORKERS COMPENSATION INSURANCE AS PER FEDERAL -REGULATIONS FOR . MARINE CONSTRUCTION 2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED 3. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPEISOD, ADDITIONAL FILL DIRT COSTS, ROCKANDIOR HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION; DOCK WORK, DREDGING, AND/OR HANDRAILS 4. ROCK AND/OR HARD SUBSTRATE IF ENCOUNTERED REQUIRING REMOVAL THEN EXTRA CHARGES (AT COST) WILL APPLY S. IN THE EVENT THAN EXCESSIVE DEBRIS (WOOD, CONCRETE, TREES, ETC) ARE UNEARTHED REQUIRING DISPOSAL THEN ADDITIONAL FEES WILL APPLY (DISPOSAL COSTS) 6, WATER SUPPLY REQUIRED 7. FLOWABLE FILL .BEHIND OLD WALL IF REQUESTED/REQUIRED EXTRA 0. PROPERTY MARKERS TO BE PROVIDED BY OWNER PRIOR TO COMMENCEMENT OF WORT( 9. EMPTY LOT WITHIN COMMUNITY REQUIRED FOR CASTING OF CONCRETE PANELS AND/OR LOADING - UNLOADING OF REQUIRED MATERIALS (TO BE OBTAINEDINEGOTIATED BY OWNER PRIOR TO OUR ARRIVAUCOMMENCEMENT OF WORK) 10. ASSOCIATION APPROVALS FOR WORK TO BE PERFORMED TO BE OBTAINED PRIOR TO OUR ARRIVAL/COMMENCEMENT OF WORK PAYMENTS AS FOLLOWS: 10% OF CONTRACT UPON SIGNING, 10% OF CONTRACT EACH MONTH UNTIL PAID IN FULL AS DISCUSSED. DATE: 1/62020 AUTHORIZED SIGNATURE: HAVE READ THIS PROPOSAL/CONTRACT AND UNDERSTAND ITS TERMS AND CONDITIONS IEVERSE SIDE OF THIS FORM. WILCO IS AUTHORIZED TO 00 THE WORK SPECIFIED IN THE A ABOVE. ALL INVOICES ARE PART OF THIS PROPOI /I n / ' n DATE PAGE OF RON OVERLY PAYMENT MADE