HomeMy WebLinkAbout20-119 Rpt 2 - 05.21.20M. L. Engineering, Inc.
Consulting Engineer
2030 37th Avenue
Vero Beach, FL 32960
Shoring:
Project
Colmun Repair Bldg 4
Job No.
19KO14
Client Treasure Cove Dunes Date
5/21/2020
Address 4100 N AIA Designed By
TE Schlitt Engineering
City/Zip Fort Pierce 34949 Phone
772.360.4998
Email
Inspection Report
Contractor: I Dato Construction Permit #: 2001-0597
In Progess X lApproved IFailed
Inpection Type: Reinforcement Inspection
Inspection Areas: Women's Restroom - Single 8"x24" Concrete Column: This inspection is for half of the column repair
Comments'-
omments:Items
Shoring:
ItemsRequiring
Corrections:
PSI Concrete Mix: p
Bonding Agent:
Specifications:
Corosion Inhibitor:
STATE OF
• a.
Bag Mix: MasterEmaco T 1061EX
Reinforcing Type/Spacing: Contractor added (4) #5 Bars per EOR D&E adjacent to existing vertical bars
Comments'-
omments:Items
4.
r ,U .
ItemsRequiring
Corrections:
ITo the best of my knowledge and belief, work inspected was in accordance with the approved permit drawings and specifications, except as noted above.
Terence Schlitt, FL P.E.# 81238
Inspector's Name
7 2/ �d z
Inspector's Signature/seal
Micahel Anthony Lue, FL P.E.# 47520 S.I. 1061
Thres,q� asp@r�tQr' i Name
�L AN Tjy4 gty
4.
r ,U .
" eG E N `°. �.
NO 47520 ;m
n
y- a
STATE OF
• a.
i�.•rtt`A
/U