Loading...
HomeMy WebLinkAbout20-119 Rpt 2 - 05.21.20M. L. Engineering, Inc. Consulting Engineer 2030 37th Avenue Vero Beach, FL 32960 Shoring: Project Colmun Repair Bldg 4 Job No. 19KO14 Client Treasure Cove Dunes Date 5/21/2020 Address 4100 N AIA Designed By TE Schlitt Engineering City/Zip Fort Pierce 34949 Phone 772.360.4998 Email Inspection Report Contractor: I Dato Construction Permit #: 2001-0597 In Progess X lApproved IFailed Inpection Type: Reinforcement Inspection Inspection Areas: Women's Restroom - Single 8"x24" Concrete Column: This inspection is for half of the column repair Comments'- omments:Items Shoring: ItemsRequiring Corrections: PSI Concrete Mix: p Bonding Agent: Specifications: Corosion Inhibitor: STATE OF • a. Bag Mix: MasterEmaco T 1061EX Reinforcing Type/Spacing: Contractor added (4) #5 Bars per EOR D&E adjacent to existing vertical bars Comments'- omments:Items 4. r ,U . ItemsRequiring Corrections: ITo the best of my knowledge and belief, work inspected was in accordance with the approved permit drawings and specifications, except as noted above. Terence Schlitt, FL P.E.# 81238 Inspector's Name 7 2/ �d z Inspector's Signature/seal Micahel Anthony Lue, FL P.E.# 47520 S.I. 1061 Thres,q� asp@r�tQr' i Name �L AN Tjy4 gty 4. r ,U . " eG E N `°. �. NO 47520 ;m n y- a STATE OF • a. i�.•rtt`A /U