HomeMy WebLinkAbout20-119 Rpt 1 - 05.19.20M. L. Engineering, Inc.
Consulting Engineer
2030 37th Avenue
Vero Beach, FL 32960
7 Pole Shoring Needed and Verified
Project
Colmun Repair Bldg 4
Job No. 19KO14
Client Treasure Cove Dunes
Date 5/19/2020
Address 4100 N AIA
Designed By
TE Schlitt Engineering
City/Zip Fort Pierce 34949
Phone 772.360.4998
IlEmail
Inspection Report
Contractor: IDato Construction I Permit #: 2001-0597
Tin— I X jApproved Failed
Inpection Type: Shoring
Inspection Areas: Women's Restroom - Single 8"x24" Concrete Column
Shoring: 2" Diameter Pole Shoring with 4 kip capacity at 9' height
PSI Concrete Mix:
Specifications: Bonding Agent:
Corosion Inhibitor:
Bag Mix:
Reinforcing Type/Spacing:
Comments:
7 Pole Shoring Needed and Verified
Items Requiring
Corrections:
To the best of my knowledge and belief, work inspected was in accordance with the approved permit drawings and specifications, except as noted above.
Terence Schlitt, FL P.E.# 81238
Inspector's Name
Inspector's Signature/Seal
Micahel Anthony Lue, FL P.E.# 47520 S.I. 1061
Threshold Inspector's Name
����g?diF8�g3®d
Flo���.
No .7520
S7AaTE OF
• e �
14
Threshold 9rlsp etbFs Signature/Seal