Loading...
HomeMy WebLinkAbout20-119 Rpt 3 - 05.27.20M. L. Engineering, Inc. Consulting Engineer 2030 37th Avenue Vero Beach, FL 32960 create coverage by increasing size of column by 1" during forming. Project Column Repair Bldg 3 Job No. 19K014 Client Treasure Cove Dunes Date 5/27/2020 Address 4100 N AIA Designed By TE Schlitt Engineering City/Zip Fort Pierce 34949 Phone 772.360.4998 IlEmail Weather Cloudy Time loam Inspection Report Contractor: IDato Construction I Permit #: 2001-0597 In Progess I IX jApproved 1 lFalld Inpection Type: Reinforcing Steel - Pre Pour Inspection Areas: Women's Restroom - Single 8"x24" Concrete Column Shoring: PSI Concrete Mix: Specifications: Bonding Agent: Aquafin rebar primer/bond-c1 Corosion Inhibitor: Bag Mix: Reinforcing Type/Spacing: Comments: create coverage by increasing size of column by 1" during forming. Items Requiring Corrections: To the best of my knowledge and belief, work inspected was in accordance with the approved permit drawings and specifications, except as noted above. Terence Schlitt, FL P.E.# 81238 Inspector's Name 0\\\II I I//////� G SF's No. 81238 q OF r pector''s 5i9natlire/S Micahel Anthony Lue, FL P.E.# 47520 S.I. 1061 Thre sector's Name P° No 4752t� . M e° !Fr', S � ♦d / l �AL