HomeMy WebLinkAbout20-119 Rpt 3 - 05.27.20M. L. Engineering, Inc.
Consulting Engineer
2030 37th Avenue
Vero Beach, FL 32960
create coverage by increasing size of column by 1" during forming.
Project
Column Repair Bldg 3
Job No.
19K014
Client Treasure Cove Dunes Date
5/27/2020
Address 4100 N AIA Designed By
TE Schlitt Engineering
City/Zip Fort Pierce 34949 Phone
772.360.4998
IlEmail
Weather Cloudy
Time loam
Inspection Report
Contractor: IDato Construction I Permit #: 2001-0597
In Progess I IX jApproved 1 lFalld
Inpection Type: Reinforcing Steel - Pre Pour
Inspection Areas: Women's Restroom - Single 8"x24" Concrete Column
Shoring:
PSI Concrete Mix:
Specifications: Bonding Agent: Aquafin rebar primer/bond-c1
Corosion Inhibitor:
Bag Mix:
Reinforcing Type/Spacing:
Comments:
create coverage by increasing size of column by 1" during forming.
Items Requiring
Corrections:
To the best of my knowledge and belief, work inspected was in accordance with the approved permit drawings and specifications, except as noted above.
Terence Schlitt, FL P.E.# 81238
Inspector's Name
0\\\II I I//////�
G SF's
No. 81238
q
OF
r
pector''s 5i9natlire/S
Micahel Anthony Lue, FL P.E.# 47520 S.I. 1061
Thre sector's Name
P° No 4752t� . M
e°
!Fr', S � ♦d / l �AL