HomeMy WebLinkAboutCertificate of Termite TreatmentJAN-25-08 12:15
oiw-
J�
IV AND DEV INC 5612143538
St. Lucie Countv Trson 6tions
2300 vrginia'Avenue .
Ft. Pierce,-FL34982
(772) 462-2172
P.01
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
T #'s C 06 i JOBADDRESS _SOSCJ X),
ST CONTROL CONTRACTOR
OST CONTROL LICENSE#
We, the undersigned, hereby Co * that We have pretreated the above -described construetitin for
subterranean termites in accordance with the standards of the National Pat"
ontrol Association
Square feat of area treated: Cl3 f
Percentage of sohrtion _. . of
Date of treatment: - • ^`
Footing __ 3
. �,Tst•Tteatment� '
i
}
M
Chemicals used: r 7-
Total gallons used: O
FBC104.2.6 emt Destmkrpr vettataofh=itx
❑ Re -treat A weather re ' or kAard shall be provided to moeive
b dupliceM7teutraentCertiffeates `e chiaquitvdpleteccdyetteatmeatis
completed, providing a eopyfor the person the permit is issued to and
7
Ist Treatment another copyfor the buildingpermit tiles. The 71ratinatCerdticate shall
Provide the product used, identity of the applieato; time and data of the
a Re -Heat tteattnant site locatia area treated ch
CI Driveway
Q IstTreatment
Re -treat
❑ Pools
U IstTreatment
❑ Re -treat
U ist Tky atment
U Re -treat
and number of gallons used, to establiah a vedit d peaxat canamksOon
ve
treatment if the soil chemical barrier method rb to record wdonofprotis u
final exterior treatment shall be core lefed d builds gap used
p Prior to tindd building approvsL
St. Lucie County requires for the final inspection dbr CO. a lbimaperit
sth: w to be planed ou the electrical panel boot ' ' listtnQ all ffiQ'
treatments and dates of application.
Perimeter for Final Inspection
�.2
SignatGre of extermin r
Then must be a completed loan for each required treatment o;.ue=' ' "; I f and this fivrm must be on
the job site to be picked up by the inspector at time of each' inspeotion of & scheduled inspection will
fail and a n-inspection fee chaiged,