Loading...
HomeMy WebLinkAboutCertificate of Termite TreatmentJAN-25-08 12:15 oiw- J� IV AND DEV INC 5612143538 St. Lucie Countv Trson 6tions 2300 vrginia'Avenue . Ft. Pierce,-FL34982 (772) 462-2172 P.01 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT T #'s C 06 i JOBADDRESS _SOSCJ X), ST CONTROL CONTRACTOR OST CONTROL LICENSE# We, the undersigned, hereby Co * that We have pretreated the above -described construetitin for subterranean termites in accordance with the standards of the National Pat" ontrol Association Square feat of area treated: Cl3 f Percentage of sohrtion _. . of Date of treatment: - • ^` Footing __ 3 . �,Tst•Tteatment� ' i } M Chemicals used: r 7- Total gallons used: O FBC104.2.6 emt Destmkrpr vettataofh=itx ❑ Re -treat A weather re ' or kAard shall be provided to moeive b dupliceM7teutraentCertiffeates `e chiaquitvdpleteccdyetteatmeatis completed, providing a eopyfor the person the permit is issued to and 7 Ist Treatment another copyfor the buildingpermit tiles. The 71ratinatCerdticate shall Provide the product used, identity of the applieato; time and data of the a Re -Heat tteattnant site locatia area treated ch CI Driveway Q IstTreatment Re -treat ❑ Pools U IstTreatment ❑ Re -treat U ist Tky atment U Re -treat and number of gallons used, to establiah a vedit d peaxat canamksOon ve treatment if the soil chemical barrier method rb to record wdonofprotis u final exterior treatment shall be core lefed d builds gap used p Prior to tindd building approvsL St. Lucie County requires for the final inspection dbr CO. a lbimaperit sth: w to be planed ou the electrical panel boot ' ' listtnQ all ffiQ' treatments and dates of application. Perimeter for Final Inspection �.2 SignatGre of extermin r Then must be a completed loan for each required treatment o;.ue=' ' "; I f and this fivrm must be on the job site to be picked up by the inspector at time of each' inspeotion of & scheduled inspection will fail and a n-inspection fee chaiged,