Loading...
HomeMy WebLinkAboutProposalWILCO CONSTRUCTION INC. 10751 ORANGE AVE FT. PIERCE, FL 34945 PH 772-460-6928 FAX 772-460-6929 SCC# 131151026 Iaf0VJ.WlLCOF4ARIIHPCON STRUCTION. COId PROPOSAL SUBMITTED TO: DESCRIPTION OF JOB: MR BERGMANN VINYL SEAWALL AND DOCK 114 QUEEN CHRISTINA CT QUEENS COVE FORT PIERCE, FL REVISED PH#772-466-7486 EMAIL: BERGMANN.GERD@T-ONLINE.DE VILE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: VA. SEAWALL 1. FURNISH AND INSTALL UP TO 195 L FT OFVINYL SHEET PILE TYPE WALL WITH A CONCRETE CAP IN FRONT OF EXISTING 2. EXISTING WALL AND COMPONENTS TO REMAIN -REMOVAL IF REQUIRED TO BE EXTRA 3. SHEET PILING TO BE SERIES 9900 X 12' LONG BY CMI 4. TOP CAP TO BE lr Y.2r WITH 5 PCS.#5 REBAR AND #8 TIES AT T ON CENTER AND 5,000 PSI CONCRETE 5. TIEBACK SYSTEM TO BE: 8- X UP TO 16' LONG TIMBER GUARD BY CMI BATTER PILES SET AT VON CENTER 5. UP TO 60 CU YARDS OF PUMPABLE / FLOWABLE FILL BETWEEN NEW AND OLD WALLS INCLUDED ( NO ACCESS FOR TYPICAL SAND FILLING) VB. DOCI((4'+/- X 195' -EXTEND TO CORNER"+/-) 1. REMOVE ALL EXCEPT OUTSIDE PILINGS ON EXISTING DOCK 2. FURNISH AND INSTALL NEW WALL SIDE PILINGS AND INSTALL ADDITIONAL PILINGS AS NEEDED TO EXTEND DOCK TO CORNER 3. CLEANINGANRAPPING OF EXISTING PILING AND WRAPPING OF NEW PILINGS IN TIDAL RANGE INCLUDED 4. FURNISH AND INSTALL NEW .60 TREATED PINE STRINGERS WITH STAINLESS STEEL BOLTS S. FURNISH AND INSTALL NEW 2"X6°TROPICAL TREATED PINE BULLNOSED DECKING WITH STAINLESS STEEL SCREWS _ 6. EXISTING BOAT LIFTS TO REMAIN T^ �1L COSTA = S INCLUDING A $1,500.00 PERMITi ING ALLOWANCE -- $90C,690,00 NOTES: 1. WILCO CONSTRUCTION CARRIES U.S.L. a H WORKERS COMPENEATION INSURANCE AS PER FEDW—'--AEGULATIONS FOR MARINE CONSTRUCTION ACTIVITIES. 2. ACCESS FOR EQUIPMENT, MATERIALS, AND CREW REQUIRED 3. PERMITS, PLANS, ENGINEERING AND ALLASSOCIATED COSTS APPLIED OR OBTAINED BY WILCO CONSTRUCTION INC OVER $1,500 WILL BE PAID BY THE CUSTOMER AS AN EXTRA COST (ALLOWANCE UP TO $1,500 FOR PERMITTING INCLUDED) 4. EXCLUDED (UNLESS SPECIFIED ABOVE): ELECTRIC, PLUMBING, LANDSCAPE/SOD, ADDITIONAL FILL DIRT COSTS, ROCK AND/OR HARD SUBSTRATE CUTTING, TRENCHING OR PUNCHING COSTS (IF REQUIRED), IRRIGATION, TREE REMOVAL, DREDGING, ANDIOR HANDRAILS 5. ROCK AND/OR HARD SUBSTRATE IF ENCOUNTERED REQUIRING REMOVAL THEN EXTRA CHARGES (AT COST) WILL APPLY 6. IN THE EVENT THAN EXCESSIVE DEBRIS (WOOD, CONCRETE, TREES, ETC) ARE UNEARTHED REQUIRING DISPOSAL THEN ADDITIONAL FEES WILL APPLY (DISPOSAL COSTS) 7. WATER SUPPLY REQUIRED PAYMENTS AS FOLLOWS: 5% OF CONTRACT UPON SIGNING, 30 % OF CONTRACT 2 WKS +I. PRIOR TO COMMENCEMENT OF WORK,' 30%OF CONTRACT UPON SHEETS IN PLACE, 30% OF CONTRACT UPON TOP CAP IN PLACE AND BALANCE UPON FINAL INSPECTION/CLEAN UP DATE: 8128/2019 SIGNATURE: ,. 0 ROBERT WILLIAMS 'OSAUCONTRACT AND UNDERSTAND ITS TERMS AND CONDITIONStlNSkCCEPT THE SAME INCLUDING THOSE ON FORM. WILCO IS AUTHORIZED TO 00 THE WORK SPECIFIED IN THE CONTRACT ONLY. PAYMENT MADE AS STATED ABOVE ALL INVOICES ARE PART OF THIS PROPOSAUCONTP.ACT. DATE: i SIGNATURE: