Loading...
HomeMy WebLinkAboutCert of termite treatment Planning &Development Services Building &Code Regulation Division 0 aff"9_ 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #:2004-0099 JOB ADDRESS: 18601 Tranquilty base lane BUILDER/CONTRACTOR: A&G PEST CONTROL CONTRACTOR: Hannan Environmental Services,Inc. PEST CONTROL LICENSE #:- JB99418 We,the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: 76 LF Chemicals used: Termidor Percentage of solution: .006 Total gallons used: 19 Date of Treatment: 06/18/2020 Time of Treatment: 8*24 —Footing —Slab I't Treatment —Ist Treatment -Re-Treat —Re-Treat —Driveway 05118=20 Pools 15t Treatment Ist Treatment —Re-Treat —Re-Treat Other PerirrLetOr for Final Inspection _1st Treatment Re-Treat _ 06/18/2020 i Signat6of]ygervj Date Mote., There must be a completed form for each required treatment or re-treatment and this form must be on the job site to bepicked up by the inspector at time.of each inspection or the scheduled inspection will fail and a re inspection fee charged. FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, ' providing a copy for the person the permit Is issued to and another copy for the building permit Ales. The Treatment Certificate shall provide the product used,Identity of the applicator, time and date Of the treatment,site location,area treated, chemical used,percent concentration and number ofgallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to Anal building approval. St Lucie County requires for the final inspection for CO,a Permanent Sticker to be placed w the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014 L