Loading...
HomeMy WebLinkAboutEnergy CodeFORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method ProjectName: WYNNE THE ROYALE IMPACT BuilderName: WYNNE Street: WYNNE DEV. Permit Office: ST.LUCIE000NTY City, State, Zip: FT. PIERCE, FL, Owner. :3 ���yo '-�. %Nk PermitNumber: Jurisdiction: Designi-oration: FL, Fort Pierce County: St Lucie (Florida Climate Zone 2) 1. New construction or existing New (From Plans) 9. Wall Types (16818.7 sqft.) Insulation Area 2. Single famllyor multiple family Single-family a. Concrete Block- Int lnsul, Exterior R=4.1 1448.70ft b. Frame -Wood, Adjacent R=11.0 ft2 3. Number of units, if multiple family 1 c,N/A .240.00 R= ft2 4. Number of Bedrooms 3 d•N/A R= ft2 5. Is this a worst case? Yes 10. Ceiling Types (1750.0 sqft.) Insulation Area a. UnderAttic(Vented) R=30.0 1720.00ft2 6. Conditioned floorarea above grade(W) 1720 b.KneeWall(Vented) R=19.0 30.00 ft2 Conditioned Floorarea belowgrade(ft2) 0 c. NIA R= ft 11. Ducts R 1`12 7. Windows(165.4 sqft.) Description Area a: Sup: Attic, Ret• Attic, AH: Attic 6 155 a. U-Factor. Sgl, U=1.04 115.42ft2 SHGC: SHGC=0.29 b. U-Factor: SgI, U=1.11 40.00 ft2 12. Cooling systems kBW/hr Efficiency SHGC: ' SHGC=0.27 a. Central Unit 34.8 SEER:15.00 c. U-Factor: N/A ft2 ' SHGC: 13. Heating systems kBtu/hr Efficiency d. U-Factor. N/A ft2 a. Electric Heat Pump 34.8 HSPF:8.50 SHGC: AreaWeightedAverageOverhahg Depth: 3.316 ft. Area Weighted Average SHGC: 0.285 14. Hotwatersystems 8. Floor Types (1720.0 sqft.) Insulation Area a. Electric Cap:50gallons a. Slab -On -Grade Edge Insulation R=0.0 1720.00 ft2 b. Conservation features EF: 0.970 b. N/A R= ft2 None c. N/A R= ft2 15. Credits Patel Glass/Floor Area: 0.090 Total Proposed Modified Loads: 56.10 PASS Total Baseline Loads: 56.25 I hereby certify that the plans and specifications covered by Review of the plans andST,t this calculation are in compliance with the Florida Energy Code. specifications covered. by this q �9 calculation indicates compliancei'Oi with the Florida Energy Code. PREPARE D BY'612? Before construction is completed r DATE: 4-2U''LD2 this building will be inspected for compliance with Section 553.908 I hereby certify that this building, as designed, is ` rnpliance Florida Statutes. with the Florida Energy Code. OWNER/A ENT BUILDING OFFICIAL: DATE: 6�k� DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed In accordance with R403.3.2.1. - Compliance requires an Alr Barrier and Insulation Inspection Checklist In accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). REVIEWED FOR CODE COMPLIANCE 1 : � Y'f, LUCIEiDwareCOUNTY 4/20I20202:55PM E rgy 0.02 ev. la es20 FBC6th dition(2017)CoamOl�it�b(lware Page tof5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT Title: WYNNE THE ROYALE IMPA Bedrooms: 3 Address Type: SVeetAddress BuildingType: User ConditionedArea: 1720 Lot# ,Owner Name: Total Stories: 1 Block/Subdivision: #of Units: 1 Worst Case: Yes PlatBook: BuilderName: WYNNE RotateAngle: 90 Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY CrossVentilation: No County. St. Lucie Jurisdiction: Whole House Fan: No City, State, Zip: FT. PIERCE, FamilyType: Single-family FL, New/E)dsfing: New (From Plans) Comment: CLIMATE / Design Temp Int Design Temp Heating Design DailyTemp V Design Location, TMYSite 97.5% 2.5% Winter Summer Degree Days Moisture Range FL, Fort Pierce FL_VERO_BEACH_MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume 1 Entire House 1720 13760 SPACES Number Name Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled Heated 1 BEDROOM 343 2744 No 0 1 1 Yes Yes Yes 2 WIC 63 504 No 0 1 No Yes Yes 3 M. BATH 56 448 No 0 1 Yes Yes Yes 4 KITCHEN 172 1376 Yes 0 1 No Yes Yes 5 BATH 45 360 No 0 1 Yes Yes Yes 6 BEDROOM 2 204 1632 No 0 1 1 Yes. Yes Yes 7 ENTRY 98 784 No 0 1 Yes Yes Yes 8 LAUNDRY 42 336 No 0 1 Yes Yes Yes 9 GREAT/DINING 528 4224 No 0 1 Yes Yes Yes 10 BEDROOM 3 169 1352 No 1 1 1 Yes Yes Yes FLOORS # FloorType Space Perimeter 'PerimeterR-Value Area JoistR-Value Tile Wood Carpet 1 Slab-On-GradeEdge Insulation BEDROOM 52 ft 0 343 ft2 ____ 0 1 0 2 Slab -On -Grade Edge Insulation WIC 1ft 0 63 ft2 ____ 0 1 0 3 Slab-On-GradeEdge Insulation M. BATH 8ft 0 56 IF ..__ 0 1 0 4 Slab -On -Grade Edge Insulation KITCHEN 1ft 0 172 f12 ____ 0 1 0 5 Slab -On -Grade Edge Insulation BATH 5ft. 0 45 ft2 ____ 0 1 0 6 Slab -On -Grade Edge Insulation BEDROOM 42.6ft .0 204 ft' ___. 0 1 0 7 Slab -On -Grade Edge Insulation ENTRY 6.3 it 0 98W ____ 0 1 0 4120/2020 2:55 PM EnergyGaugeOUSA 6.0.02(Rev.1)-FlaRes2017FBC6thEdition (2017)Compliant Software Page 2of5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT FLOORS # FloorType Space Perimeter PerimeterR-Value Area JoistR-Value Tile Wood Carpet 8SIab-On-Grade Edgelnsulation LAUNDRY Eft 0 42ft2 ... 0 1 0 9 Slab -On -Grade Edge Insulation-GREAT/DINING 48ft 0 528 ft' ---- 0 1 0 10SIab-On-Grade Edge Insulation BEDROOM 3 13 ft 0 169 ft2 ---- 0 1 0 ROOF / Roof Gable Roof Red Solar SA Emift Emitt Deck Pitch V # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 GableorSh8d Metal 1813 ft' 286 ft' Light N 0.6 No 0.7 No 0 18.4 ATTIC / V # Type Ventilation Vent Ratio (1 In) Area RBS IRCC 1 Full attic Vented .150 1720 ft2 N N CEILING # CeilingType Space R-Value Ins Type Area Framing Frac Truss Type 1 UnderAttic(Vented) BEDROOM 30 Blown 343 ft2 0.1 Wood 2 UnderAtfic(Vented) WIC 30 Blown 63 ft2 0.1 Wood 3 UnderAtfic(Vented) M.BATH 30 Blown 56 ft' 0.1 Wood 4 UnderAttic(Vented) KITCHEN 30 Blown 172 ft' 0.1 Wood 5 UndetAtfic(Vented) BATH 30 Blown 45 ft' 0.1 Wood 6 UnderAtfic(Vented) BEDROOM2 30 Blown 204 ft2 0.1 Wood 7 UnderAttic(Vented) ENTRY 36 Blown 98 112 0.1 Wood 8 UnderAttic(Vented) LAUNDRY 30 Blown 42 ft2 0.1 Wood 9 UnderAttic(Vented) GREAT/DINING 30 Blown 528 ft' 0.1 Wood 10 UnderAtOc(Vented) BEDROOM 30 Blown 169ft' 0.1 Wood 11 Knee Wall (Vented) GREATIDIN(NG 19 Blown 30 ft2 0.11 Wood WALLS Adjacent Space Cavity' Width Height Sheathing .Framing Solar Below Ora _ 1 N=>E Exterior Concrete Block- Int lnsul BEDROOM 4.1 9 0 8 0 72.0 ft2 0 0 0.4 0 _2 S=>W Exterior Concrete Block- Int lnsul BEDROOM 4.1 29 0 8 0 232.0 ft2 0 0 0.4 0 _ 3 W=>N Exterior Concrete Block- Int lnsul BEDROOM 4.1 14 0 8 0 112.0 ft' 0 0 0.4 0 _ 4 S=>W Exterior Concrete Block- Inl lnsul M. BATH 4.1 8 0 8 0 64:0 ft' 0 0 0.4 0 5 N=>E Exterior Concrete Block-Int lnsul BATH 4.1 5 0 8 0 40.0 ft2 0 0 0.4 0 6 N=>E Exterior Concrete Block- Int InsuBEDROOM 2 4.1 14 0 8 0 112.0ft2 0 0 0.4 0 7 NE=>SE Exterior Concrete Block- Int InsuBEDROOM 2 4.1 2 10 8 0 22.7 ft2 0 0 0.4 0 8 E=>S Exterior Concrete Block- Int InsuBEDROOM 2 4.1 9 0 8 0 72.0 ft2 0 0 0.4 0 _ 9 SE=>SW Exterior Concrete Block-Int InsuBEDROOM 2 4.1 2 10 8 0 22.7 ft2 0 0 0.4 0 10 S=>W Exterior Concrete Block- Int InsuBEDROOM 2 4.1 14 0 8 0 112.0ft' 0 0 0.4 0 11 NE=>SE Exterior Concrete Block- Int lnsul ENTRY 4.1 1 5 8 0 11.3 ft2 0 0 0.4 0 4120/2020 2:55 PM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017FBC6lhEdition :(2017)Compliant Software Page 3of5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Below 12 E=>S Exterior Concrete Block-Intlnsul ENTRY 4.1 5 0 8 0 40.0 ft2 0 0 0.4 0 13 S=>W Exterior Concrete Block - IntlnsulLAUNDRY 4.1 6 0 8 0 48.0ft2 0 0 0.4 0 14 N=>E Exterior Concrete Block -Int lnsuGREAT/DINI 4.1 28 0 8 0 224.0 ft2 0 0 0.4 0 15 W=>N Exterior Concrete Block -Int lnsuI3REAT/DINI 4.1 20 0 8 0 160.0 ft2 0 0 0.4 0 16 N=>E Exterior Concrete Block- Int InsuBEDROOM 3 4.1 13 0 8 0 104.0 112 0 0 0.4 0 17 N=>E Garage Frame -Wood BEDROOM 11 30 8 240.0 ft2 0.23 0.4 0 DOORS # Omt DoorType Space Storms U-Value Width Height Area Ft In Ft In 1 E=>S Insulated ENTRY None .32 3 6 8 20 ft2 WINDOWS Orientation shown is the entered orientation (=> changed to Worst Case. / Wall Overhang V # Omt ID Frame Panes NFRC U-Factor SHGC Imp Area Depth Separation IntShade Screening 1 W=>N 3 Metal Low-ESingle Yes 1.04 0.29 N 32.4 ft2 1 It 0 in 1 ft 5 in Drapes/blinds Exteriors 2 S=>W 4 Metal Low-ESingle Yes 1.04 0.29 N 6.9 1`12 1ft01n 1ft5in None None 3 E=>S 8 Metal Low=ESingle Yes1.04 0.29 N 23.2 ft2 1 It 0 in 1 it 5 in None None 4 N=>E 14 Metal Low-ESingle Yes 1.04 0.29 N 36.8 ft2 1 ft 0 in 1 ft5 in None None 5 W=>N 15 Metal Low-ESingle Yes 1.11 0.27 N 40.0 ft2 10 ft0In 1ft5in None None 6 N=>E 16 Metal Low-ESingle Yes 1.04 0.29 N 16.2 ft2 1 ft 0 in 1 ft5 in None None GARAGE # FloorArea CeilingArea Exposed Wall Perimeter Avg. Wall Height ExposedWalllnsulation 1 300 ft2 300 ft2 30 ft 8 It 11 INFILTRATION # Scope Method SLA CFM 50 ELA EgIA ACH ACH 50 1 Wholehouse ProposedACH(50) .000356 1605.3 88.13 165.74 .1233 7 HEATING SYSTEM # SystemType Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split Single HSPF:8.5 34.8 kBtufhr 1 sys#1 COOLING SYSTEM # Syst"Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 CentralUnit/ Split Single SEER: 15 34.8 kBtu/hr cfm 0.85 1 sys#1 4120/20202:55 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition'(2017) Compliant Software Page of FORM R405-2017 INPUT SUMMARY CHECKLIST REPnRT HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.97 50 gal , 60.9 gal 120deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Carl # CompanyName System Model# Collector Model# Area Volume FEF None None ft' DUCTS _ / —Supply— ----Return,-- Air CFM25 CFM25 HVAC# V # Location R-Value Area Location Area LeakageType Handler TOT OUT ON RLF Heat Cool 1 Attic 6 155 ft2 Attic 55 ft? Defaultl_eakage Attic (Default) c(Default) c 1 1 TEMPERATURES ProgramableThermostat: Y Ceiling Fans: Cooling Feb Venting HJan H F b Mar Mar Apr Apr € May M Jun Jul Aug rDO' DOT rOctDec Octr(X�� r()C,) [X] May Jun [ ]Jul [ ] Aug [ ] Sep [ ]X No [ ] Dec ThermostatSchedule: HERS 2006 Reference Hours ScheduleType 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 '78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66. 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness FumilureFraction Space. Defaull(8 lbs/sq.ft. 0 ft' 0 ft 0.3 BEDROOM Default(8lbslsq.ft. ft ft 0.3 WIC Default(8lbs/sq.ft. ft' ft 0.3 M. BATH Defaull(81bs/sq.ft. ft' It 0.3 KITCHEN Default(Blbs/sq.ft ftZ ft 0.3 BATH Default(81bs/sq.ft, ft' It 0.3 BEDROOM 2 Default(Blbs/sq.fL ft' ft 0.3 ENTRY Default(8lbs/sq.fL fN ft 0.3 LAUNDRY Default(8lbs/sq.ft. fP ft 0.3 GREAT/DINING Default 8lbs/s- .f . ft- It 0.3 BEDROOM 3 4/20/20202:55 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition(2017) Compliant Software Page of 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: WYNNE THE ROYALE IMPACT Builder Name: WYNNE Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE, FL, Permit Number: Y Owner. Jurisdiction: w Design Location: FL, Fort Pierce 0 COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be Installed In the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attics aces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material havingthermal resistance of R-3 Knee walls shall be sealed. .a per Inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall Include the air barrier. Rim joists shall be Insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (Including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts In narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spa s. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on Installation readily conforms to available space shall Showerltub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be Installed behind electrical or communication exterior walls boxesor air -sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking 1. 1or other adhesive sealants shall not be used to fill voids betwee a. In addluor., ,,....2h o1 ,.e coons suau un in auuumance wnn me provisions or we-vuu. 4/20/2020 2:55 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 2017 EPL DISPLAY CARD ENERGY PERFORMANCE, LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 100 The lower the Energy Performance Index, the more efficient the home 1. New home or, addition 1. New (From Plans) 12. Ducts, location & insulation level a) Supply ducts R 6.0 2: Single-family or multiple -family 2. Single-family b) Return ducts R 6.0 c) AHU location Attic 3. No. of units (if multiple -family) 3. 1 4. Number of bedrooms 4. 3 13. Cooling system: Capacity 34.8 a) Split system SEER 15.0 5. Is this a worst case? (yes/no) 5. Yes b) Single package SEER c) Ground/water source SEER/COP 6. Conditioned floor area (sq. ft.) 6. 1720 d) Room unit/PTAC EER e) Other 7. Windows, type and area a) U-factor:(weighted average) 7a. 1.058 b) Solar Heat Gain Coefficient (SHGC) 7b. 0.285 14. Heating system: Capacity 34.8 c) Area 7c. 155.4 a) Split system heat pump HSPF 8.5 b) Single package heat pump HSPF 8. Skylights c) Electric resistance COP a) U-factor.(weighted average) 83. NA d) Gas furnace, natural gas AFUE b) Solar Heat Gain Coefficient (SHGC) 8b. NA e) Gas furnace, LPG AFUE f) Other 9. Floor type, insulation level: a) Slab -on -grade (R-value) 9a. 0.0 b) Wood, raised (R-value) 9b. 15. Water heating system c) Concrete, raised (R-value) 9c. a) Electric resistance EF 0.97 b) Gas fired, natural gas EF 10. Wall type and insulation: c) Gas fired, LPG EF A. Exterior: d) Solar system with tank EF 1. Wood frame (Insulation R-value) 10A1. e) Dedicated heat pump with tank EF_ 2. Masonry (Insulation R-value) 10A2. 4.1 0 Heat recovery unit HeatRec% B. Adjacent: g) Other 1. Wood frame (Insulation R-value) 10B1. 11.0 2. Masonry (Insulation R-value) 10B2. 16. HVAC credits claimed (Performance Method) 11. Ceiling type and insulation level a) Ceiling fans a) Under attic 11a. 30.0 b) Cross ventilation No b) Single assembly 11b. c) Whole house fan No c) Knee walls/skylight walls 11c. 19.0 d) Multizone cooling credit d) Radiant barrier installed 11d. No e) Multizone heating credit 0 Programmable thermostat Yes *Label required by Section R303,1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL display card will be completed based on installe -co ompliant features. 1 Builder Signature: Date: Address of New Home: WYNNE DEV..3 City1FL Zip: FT. PIERCE, FLS �-R-� `C�•l�t-2 4/20/2020 2:55:34 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1