HomeMy WebLinkAboutEnergy CodeFORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
ProjectName: WYNNE THE ROYALE IMPACT
BuilderName: WYNNE
Street: WYNNE DEV.
Permit Office: ST.LUCIE000NTY
City, State, Zip: FT. PIERCE, FL,
Owner. :3 ���yo '-�. %Nk
PermitNumber:
Jurisdiction:
Designi-oration: FL, Fort Pierce
County: St Lucie (Florida Climate
Zone 2)
1. New construction or existing New (From Plans)
9. Wall Types (16818.7 sqft.)
Insulation Area
2. Single famllyor multiple family Single-family
a. Concrete Block- Int lnsul, Exterior
R=4.1 1448.70ft
b. Frame -Wood, Adjacent
R=11.0 ft2
3. Number of units, if multiple family 1
c,N/A
.240.00
R= ft2
4. Number of Bedrooms 3
d•N/A
R= ft2
5. Is this a worst case? Yes
10. Ceiling Types (1750.0 sqft.)
Insulation Area
a. UnderAttic(Vented)
R=30.0 1720.00ft2
6. Conditioned floorarea above grade(W) 1720
b.KneeWall(Vented)
R=19.0 30.00 ft2
Conditioned Floorarea belowgrade(ft2) 0
c. NIA
R= ft
11. Ducts
R 1`12
7. Windows(165.4 sqft.) Description Area
a: Sup: Attic, Ret• Attic, AH: Attic
6 155
a. U-Factor. Sgl, U=1.04 115.42ft2
SHGC: SHGC=0.29
b. U-Factor: SgI, U=1.11 40.00 ft2
12. Cooling systems
kBW/hr Efficiency
SHGC: ' SHGC=0.27
a. Central Unit
34.8 SEER:15.00
c. U-Factor: N/A ft2
'
SHGC:
13. Heating systems
kBtu/hr Efficiency
d. U-Factor. N/A ft2
a. Electric Heat Pump
34.8 HSPF:8.50
SHGC:
AreaWeightedAverageOverhahg Depth: 3.316 ft.
Area Weighted Average SHGC: 0.285
14. Hotwatersystems
8. Floor Types (1720.0 sqft.) Insulation Area
a. Electric
Cap:50gallons
a. Slab -On -Grade Edge Insulation R=0.0 1720.00 ft2
b. Conservation features
EF: 0.970
b. N/A R= ft2
None
c. N/A R= ft2
15. Credits
Patel
Glass/Floor Area: 0.090 Total Proposed Modified Loads: 56.10
PASS
Total Baseline Loads: 56.25
I hereby certify that the plans and specifications covered by
Review of the plans andST,t
this calculation are in compliance with the Florida Energy
Code.
specifications covered. by this
q
�9
calculation indicates compliancei'Oi
with the Florida Energy Code.
PREPARE D BY'612?
Before construction is completed
r
DATE: 4-2U''LD2
this building will be inspected for
compliance with Section 553.908
I hereby certify that this building, as designed, is ` rnpliance
Florida Statutes.
with the Florida Energy Code.
OWNER/A ENT
BUILDING OFFICIAL:
DATE: 6�k�
DATE:
- Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed In accordance with R403.3.2.1.
- Compliance requires an Alr Barrier and Insulation Inspection Checklist In accordance with R402.4.1.1 and this project requires
an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
REVIEWED FOR
CODE COMPLIANCE
1 : � Y'f, LUCIEiDwareCOUNTY
4/20I20202:55PM E rgy 0.02 ev. la es20 FBC6th dition(2017)CoamOl�it�b(lware Page tof5
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
PROJECT
Title: WYNNE THE ROYALE IMPA Bedrooms: 3
Address Type:
SVeetAddress
BuildingType: User
ConditionedArea: 1720
Lot#
,Owner Name:
Total Stories: 1
Block/Subdivision:
#of Units: 1
Worst Case: Yes
PlatBook:
BuilderName: WYNNE
RotateAngle: 90
Street:
WYNNE DEV.
Permit Office: ST. LUCIE COUNTY
CrossVentilation: No
County.
St. Lucie
Jurisdiction:
Whole House Fan: No
City, State, Zip:
FT. PIERCE,
FamilyType: Single-family
FL,
New/E)dsfing: New (From Plans)
Comment:
CLIMATE
/
Design Temp
Int Design Temp Heating
Design DailyTemp
V Design Location,
TMYSite 97.5% 2.5%
Winter
Summer Degree Days Moisture
Range
FL, Fort Pierce FL_VERO_BEACH_MUNI 39 90
70
75 299
62
Low
BLOCKS
Number Name
Area Volume
1 Entire House
1720 13760
SPACES
Number Name
Area Volume Kitchen Occupants
Bedrooms
Infil ID Finished Cooled
Heated
1 BEDROOM
343 2744 No 0
1
1 Yes
Yes
Yes
2 WIC
63 504 No 0
1 No
Yes
Yes
3 M. BATH
56 448 No 0
1 Yes
Yes
Yes
4 KITCHEN
172 1376 Yes 0
1 No
Yes
Yes
5 BATH
45 360 No 0
1 Yes
Yes
Yes
6 BEDROOM 2
204 1632 No 0
1
1 Yes.
Yes
Yes
7 ENTRY
98 784 No 0
1 Yes
Yes
Yes
8 LAUNDRY
42 336 No 0
1 Yes
Yes
Yes
9 GREAT/DINING
528 4224 No 0
1 Yes
Yes
Yes
10 BEDROOM 3
169 1352 No 1
1
1 Yes
Yes
Yes
FLOORS
# FloorType
Space Perimeter 'PerimeterR-Value
Area
JoistR-Value
Tile Wood
Carpet
1 Slab-On-GradeEdge Insulation
BEDROOM 52 ft 0
343 ft2
____
0 1
0
2 Slab -On -Grade Edge Insulation
WIC 1ft 0
63 ft2
____
0 1
0
3 Slab-On-GradeEdge Insulation
M. BATH 8ft 0
56 IF
..__
0 1
0
4 Slab -On -Grade Edge Insulation
KITCHEN 1ft 0
172 f12
____
0 1
0
5 Slab -On -Grade Edge Insulation
BATH 5ft. 0
45 ft2
____
0 1
0
6 Slab -On -Grade Edge Insulation
BEDROOM 42.6ft .0
204 ft'
___.
0 1
0
7 Slab -On -Grade Edge Insulation
ENTRY 6.3 it 0
98W
____
0 1
0
4120/2020 2:55 PM EnergyGaugeOUSA 6.0.02(Rev.1)-FlaRes2017FBC6thEdition (2017)Compliant Software Page 2of5
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
FLOORS
#
FloorType Space Perimeter PerimeterR-Value
Area
JoistR-Value
Tile
Wood Carpet
8SIab-On-Grade Edgelnsulation LAUNDRY Eft 0
42ft2
...
0
1
0
9 Slab -On -Grade Edge Insulation-GREAT/DINING 48ft
0
528 ft'
----
0
1
0
10SIab-On-Grade Edge Insulation BEDROOM 3 13 ft 0
169 ft2
----
0
1
0
ROOF
/
Roof
Gable
Roof
Red
Solar
SA Emift
Emitt Deck
Pitch
V
#
Type Materials Area
Area
Color
Barr
Absor.
Tested
Tested Insul.
(deg)
1
GableorSh8d Metal 1813 ft'
286 ft'
Light
N
0.6
No 0.7
No 0
18.4
ATTIC
/
V
#
Type Ventilation
Vent Ratio (1 In)
Area
RBS
IRCC
1
Full attic Vented
.150
1720 ft2
N
N
CEILING
#
CeilingType Space
R-Value
Ins Type
Area
Framing Frac
Truss Type
1
UnderAttic(Vented) BEDROOM
30
Blown
343 ft2
0.1
Wood
2
UnderAtfic(Vented) WIC
30
Blown
63 ft2
0.1
Wood
3
UnderAtfic(Vented) M.BATH
30
Blown
56 ft'
0.1
Wood
4
UnderAttic(Vented) KITCHEN
30
Blown
172 ft'
0.1
Wood
5
UndetAtfic(Vented) BATH
30
Blown
45 ft'
0.1
Wood
6
UnderAtfic(Vented) BEDROOM2
30
Blown
204 ft2
0.1
Wood
7
UnderAttic(Vented) ENTRY
36
Blown
98 112
0.1
Wood
8
UnderAttic(Vented) LAUNDRY
30
Blown
42 ft2
0.1
Wood
9
UnderAttic(Vented) GREAT/DINING
30
Blown
528 ft'
0.1
Wood
10
UnderAtOc(Vented) BEDROOM
30
Blown
169ft'
0.1
Wood
11
Knee Wall (Vented) GREATIDIN(NG
19
Blown
30 ft2
0.11
Wood
WALLS
Adjacent Space
Cavity' Width
Height
Sheathing .Framing
Solar
Below
Ora
_ 1
N=>E
Exterior Concrete Block- Int lnsul BEDROOM
4.1 9
0 8
0
72.0 ft2
0
0
0.4
0
_2
S=>W
Exterior Concrete Block- Int lnsul BEDROOM
4.1 29
0 8
0
232.0 ft2
0
0
0.4
0
_ 3
W=>N
Exterior Concrete Block- Int lnsul BEDROOM
4.1 14
0 8
0
112.0 ft'
0
0
0.4
0
_ 4
S=>W
Exterior Concrete Block- Inl lnsul M. BATH
4.1 8
0 8
0
64:0 ft'
0
0
0.4
0
5
N=>E
Exterior Concrete Block-Int lnsul BATH
4.1 5
0 8
0
40.0 ft2
0
0
0.4
0
6
N=>E
Exterior Concrete Block- Int InsuBEDROOM 2
4.1 14
0 8
0
112.0ft2
0
0
0.4
0
7
NE=>SE Exterior Concrete Block- Int InsuBEDROOM 2
4.1 2
10 8
0
22.7 ft2
0
0
0.4
0
8
E=>S
Exterior Concrete Block- Int InsuBEDROOM 2
4.1 9
0 8
0
72.0 ft2
0
0
0.4
0
_ 9
SE=>SW Exterior Concrete Block-Int InsuBEDROOM 2
4.1 2
10 8
0
22.7 ft2
0
0
0.4
0
10
S=>W
Exterior Concrete Block- Int InsuBEDROOM 2
4.1 14
0 8
0
112.0ft'
0
0
0.4
0
11
NE=>SE
Exterior Concrete Block- Int lnsul ENTRY
4.1 1
5 8
0
11.3 ft2
0
0
0.4
0
4120/2020 2:55 PM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017FBC6lhEdition :(2017)Compliant Software Page 3of5
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
WALLS
Adjacent Space Cavity Width
Height
Sheathing Framing Solar
Below
12
E=>S Exterior Concrete Block-Intlnsul ENTRY 4.1 5 0 8
0 40.0 ft2
0
0 0.4
0
13
S=>W Exterior Concrete Block - IntlnsulLAUNDRY 4.1 6 0 8
0 48.0ft2
0
0 0.4
0
14
N=>E Exterior Concrete Block -Int lnsuGREAT/DINI 4.1 28 0 8
0 224.0 ft2
0
0 0.4
0
15
W=>N Exterior Concrete Block -Int lnsuI3REAT/DINI 4.1 20 0 8
0 160.0 ft2
0
0 0.4
0
16
N=>E Exterior Concrete Block- Int InsuBEDROOM 3 4.1 13 0 8
0 104.0 112
0
0 0.4
0
17
N=>E Garage Frame -Wood BEDROOM 11 30 8
240.0 ft2
0.23 0.4
0
DOORS
# Omt DoorType Space Storms
U-Value
Width
Height
Area
Ft In
Ft In
1 E=>S Insulated ENTRY None
.32 3
6 8
20 ft2
WINDOWS
Orientation shown is the entered orientation (=> changed to Worst Case.
/
Wall
Overhang
V
# Omt ID Frame Panes NFRC U-Factor SHGC Imp
Area Depth
Separation IntShade
Screening
1 W=>N 3 Metal Low-ESingle Yes 1.04 0.29 N
32.4 ft2 1 It 0 in
1 ft 5 in
Drapes/blinds
Exteriors
2 S=>W 4 Metal Low-ESingle Yes 1.04 0.29 N
6.9 1`12 1ft01n
1ft5in
None
None
3 E=>S 8 Metal Low=ESingle Yes1.04 0.29 N
23.2 ft2 1 It 0 in
1 it 5 in
None
None
4 N=>E 14 Metal Low-ESingle Yes 1.04 0.29 N
36.8 ft2 1 ft 0 in
1 ft5 in
None
None
5 W=>N 15 Metal Low-ESingle Yes 1.11 0.27 N
40.0 ft2 10 ft0In
1ft5in
None
None
6 N=>E 16 Metal Low-ESingle Yes 1.04 0.29 N
16.2 ft2 1 ft 0 in
1 ft5 in
None
None
GARAGE
# FloorArea CeilingArea Exposed Wall Perimeter
Avg. Wall Height
ExposedWalllnsulation
1 300 ft2 300 ft2 30 ft
8 It
11
INFILTRATION
# Scope Method SLA CFM 50 ELA EgIA ACH
ACH 50
1 Wholehouse ProposedACH(50) .000356 1605.3 88.13 165.74 .1233
7
HEATING SYSTEM
# SystemType Subtype Speed Efficiency
Capacity
Block
Ducts
1 Electric Heat Pump/ Split Single HSPF:8.5
34.8 kBtufhr
1
sys#1
COOLING SYSTEM
# Syst"Type Subtype Subtype Efficiency
Capacity Air Flow
SHR Block
Ducts
1 CentralUnit/ Split Single SEER: 15
34.8 kBtu/hr
cfm
0.85 1
sys#1
4120/20202:55 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition'(2017) Compliant Software Page of
FORM R405-2017 INPUT SUMMARY CHECKLIST REPnRT
HOT WATER SYSTEM
# System Type
SubType
Location
EF
Cap
Use
SetPnt
Conservation
1 Electric
None
Garage
0.97
50 gal ,
60.9 gal
120deg
None
SOLAR HOT WATER SYSTEM
FSEC
Collector Storage
Carl # CompanyName
System
Model# Collector Model#
Area Volume
FEF
None None
ft'
DUCTS
_ / —Supply—
----Return,--
Air
CFM25
CFM25
HVAC#
V # Location R-Value Area
Location
Area
LeakageType
Handler
TOT
OUT ON RLF
Heat Cool
1 Attic
6 155 ft2
Attic
55 ft?
Defaultl_eakage
Attic
(Default) c(Default) c
1 1
TEMPERATURES
ProgramableThermostat: Y
Ceiling Fans:
Cooling Feb
Venting HJan H F b
Mar
Mar
Apr
Apr
€
May
M Jun Jul
Aug
rDO'
DOT
rOctDec
Octr(X��
r()C,)
[X]
May
Jun [ ]Jul
[ ] Aug
[ ] Sep
[ ]X
No
[ ] Dec
ThermostatSchedule: HERS 2006 Reference
Hours
ScheduleType
1
2
3
4
5 6
7
8
9 10
11
12
Cooling(WD) AM
78
78
78
78
78 78
78
78
80 80
80
80
PM
80
80
78
78
78 78
78
78
78 78
78
78
Cooling(WEH) AM
78
78
78
78
78 78
78
78
78 78
78
78
PM
78
78
78
78
'78 78
78
78
78 78
78
78
Heating(WD) AM
66
66
66
66.
66 68
68
68
68 68
68
68
PM
68
68
68
68
68 68
68
68
68 68
66
66
Heating(WEH) AM
66
66
66
66
66 68
68
68
68 68
68
68
PM
68
68
68
68
68 68
68
68
68 68
66
66
MASS
Mass Type
Area
Thickness
FumilureFraction
Space.
Defaull(8 lbs/sq.ft.
0 ft'
0 ft
0.3
BEDROOM
Default(8lbslsq.ft.
ft
ft
0.3
WIC
Default(8lbs/sq.ft.
ft'
ft
0.3
M. BATH
Defaull(81bs/sq.ft.
ft'
It
0.3
KITCHEN
Default(Blbs/sq.ft
ftZ
ft
0.3
BATH
Default(81bs/sq.ft,
ft'
It
0.3
BEDROOM 2
Default(Blbs/sq.fL
ft'
ft
0.3
ENTRY
Default(8lbs/sq.fL
fN
ft
0.3
LAUNDRY
Default(8lbs/sq.ft.
fP
ft
0.3
GREAT/DINING
Default 8lbs/s- .f .
ft-
It
0.3
BEDROOM 3
4/20/20202:55 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition(2017) Compliant Software Page of
2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: WYNNE THE ROYALE IMPACT Builder Name: WYNNE
Street: WYNNE DEV. Permit Office: ST. LUCIE COUNTY
City, State, Zip: FT. PIERCE, FL, Permit Number:
Y
Owner. Jurisdiction:
w
Design Location: FL, Fort Pierce
0
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be Installed In the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attics aces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material havingthermal resistance of R-3
Knee walls shall be sealed.
.a
per Inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall Include the air barrier.
Rim joists shall be Insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(Including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts In narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spa
s.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
Installation readily conforms to available space shall
Showerltub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be Installed behind electrical or communication
exterior walls
boxesor air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking 1. 1or other adhesive sealants shall not be used to fill voids
betwee
a. In addluor., ,,....2h o1 ,.e coons suau un in auuumance wnn me provisions or we-vuu.
4/20/2020 2:55 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
2017 EPL DISPLAY CARD
ENERGY PERFORMANCE, LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 100
The lower the Energy Performance Index, the more efficient the home
1. New home or, addition
1. New (From Plans)
12. Ducts, location & insulation level
a) Supply ducts R
6.0
2: Single-family or multiple -family
2. Single-family
b) Return ducts R
6.0
c) AHU location
Attic
3. No. of units (if multiple -family)
3.
1
4. Number of bedrooms
4.
3
13. Cooling system: Capacity
34.8
a) Split system SEER
15.0
5. Is this a worst case? (yes/no)
5.
Yes
b) Single package SEER
c) Ground/water source SEER/COP
6. Conditioned floor area (sq. ft.)
6.
1720
d) Room unit/PTAC EER
e) Other
7. Windows, type and area
a) U-factor:(weighted average)
7a.
1.058
b) Solar Heat Gain Coefficient (SHGC)
7b.
0.285
14. Heating system: Capacity
34.8
c) Area
7c.
155.4
a) Split system heat pump HSPF
8.5
b) Single package heat pump HSPF
8. Skylights
c) Electric resistance COP
a) U-factor.(weighted average)
83.
NA
d) Gas furnace, natural gas AFUE
b) Solar Heat Gain Coefficient (SHGC)
8b.
NA
e) Gas furnace, LPG AFUE
f) Other
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
9a.
0.0
b) Wood, raised (R-value)
9b.
15. Water heating system
c) Concrete, raised (R-value)
9c.
a) Electric resistance EF
0.97
b) Gas fired, natural gas EF
10. Wall type and insulation:
c) Gas fired, LPG EF
A. Exterior:
d) Solar system with tank EF
1. Wood frame (Insulation R-value)
10A1.
e) Dedicated heat pump with tank EF_
2. Masonry (Insulation R-value)
10A2.
4.1
0 Heat recovery unit HeatRec%
B. Adjacent:
g) Other
1. Wood frame (Insulation R-value)
10B1.
11.0
2. Masonry (Insulation R-value)
10B2.
16. HVAC credits claimed (Performance Method)
11. Ceiling type and insulation level
a) Ceiling fans
a) Under attic
11a.
30.0
b) Cross ventilation
No
b) Single assembly
11b.
c) Whole house fan
No
c) Knee walls/skylight walls
11c.
19.0
d) Multizone cooling credit
d) Radiant barrier installed
11d.
No
e) Multizone heating credit
0 Programmable thermostat
Yes
*Label required by Section R303,1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy
saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL
display card will be completed based on installe -co ompliant features. 1
Builder Signature: Date:
Address of New Home: WYNNE DEV..3 City1FL Zip: FT. PIERCE, FLS
�-R-� `C�•l�t-2
4/20/2020 2:55:34 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1