Loading...
HomeMy WebLinkAboutProposal'Or* Dock oom 772,234,4250 AI Baade 5313 Montego Clyde Fort Pierce, FL 34949 w Proposal Dale Proposal 5/812020 7721619 SCOPEOFWORK Sales Tax iisINCWDEDInthlsProposal. Demo, haul and dispose of existing dock, boat ilk and all pilings. Exlstng aluminum boat lift canopy to be saved and stored on -site. Construct a new 375 SF dock In accordance with the engineered frets as fonows: ' Set new Marine Grade pilings. 2 x 8 PIT Bents secured with a 50 slelnless steel all -thread at each connect, 2 x 8 P7T Stringers secured with stainless steel screws, 01 Grade, 2 x 6 P!T Marine Deck gapped at 112 and secured with 3' alalnless-steel screws. NOTES: 1. Wood RX clear sealant to be applied t5 weeks after completion. 2. As -butt drawing will ber completed to confirm overall sq. f . 3. Prins is based on $37.50 per SF of dock area. Final Involca will be acqusled to reflect the as -built square footage 4. IMPORTANT: aluminum canvas Game cover must be Insts nod AFTER Inspection. Aluminum awning will need to be modified to Mon new lift. Alumnum bracket work by others and Is not Induced with this proposal. S. Aluminum boat lift canopy relnaletallon: $275; canvas by others. Provide and Install (1) Aluminum and Stalnless-steel 7,000# Gear Drive Cradle Boat Lift by Neptune. Includes: carpeted wood bunks; remote control whauto-run nmitsw8ch; SEArmor corrosion resistant package; (4) new Marine Grade Oft pilings. OPTIONAL BUNK UPGRADE (not included with this prnpos4 $875: (4) aluminum bunks; (6) pat aluminum bunk brackets; stainless steel beam & bunk hardware Engineered Drawings $590, Florida Department of Environmental Protection (FOEP) &Army Corps of Engineers (ACE) Parrots $350, St. Lucie County Permit $250. NOC Recording $10 (Estimated) HOA, PDA or other Community Approvals maybe required for the proposed work. Associated fees (if any) are not Included In this proposal and are the responsibility of the Owner/Purchaser. "As per code; electrical & plumbing work must be performed by a licensed convector and Is not included in this proposal. The electrician shall provide adequate power supply to operate remote control units, switches, motors, lights, etc. (Spectficattons available upon request). 2,97&00 14,062.00 110,271.00 1,200.00 " Boat specifications may require a custom bunk system resulting in additional charges to the Purchosar. OwnerlPurchaser accepts that the water depth In the area of the dock and/or boat IIft (existing or proposed), even In the event of rendering them unusable, as satisfactory considering tte varying tdesrtdal movement. TERMS: $1200 upon acceptance or this proposal; balance of 20%deposit upon municipal &environmental TOTAL $28,508.00 permitting In•hand; 40% upon materiel &workmen cnslte; 40% upon substantial completion Contractor acknowledges and presents the foregoing PROPOSAL to the OvinerlPurchaser subjectio modifkaton upon final permitted design. Proposal valid for 30 days. Bytheexecution of this PROPOSAL, OwnedPufchasar acknowledges and accepts the foregoingterrrs on this page and the Terms 8 CorAtlons of Accepted Proposal on page 2. Cfl OWPACTORS,INC.� by Rob Morris, Gomel Manager avnertpluchaser ODRE Mulne Contractors, Inc. P.O. Bar 613711 Vem Beach, FL 3296i 772231.4228 Ph 888.858,1492 Fax ® � .com Page 2 —~~^' 772,234,4260 Terms & Conditions of Accepted Proposal 1. DUTIES AND RIGHTS OF THE CONTRACTOR Contractors duties and fights are as follows: a) Contractor Licensing & Insurance - CORE Marine Contractors, Inc. holds a State Certified General Con tractorUcense#CGCA2fi812. Contractor agrees to keep in force at his own expense during the entire period of construction on the project such insurance as will protect Contractor, OwnenPurchaser and any lender from claims. Contractor shall provide proof of liability insurance and employee workman's compensation insurance, Including USL&H (Longshore Harbor Workers Compensation Act.) b) Responsibility and Supervision of Construction - Contractor shall be solely responsible for all Work under this contract, including the techniques, sequences, procedures, means and'coordinalion. Contractor shall supervise and direct only the scope of work covered by this contract to the best of their ability, giving all attention necessary for.such proper supervision and direction. c) Furnishing of labor, Materials, etc. - Contractor shall provide and pay for all labor, materials, tools and equipment to complete the work, unless otherwise stated. d) Payment of Taxes; Procurement of Licenses and Permits - Contractor shall pay all taxes required by law in connection with the completion of the work. Including but not limited to, sales, use, and similar taxes, and shall secure all licenses necessary for proper completion of the work. Contractor shall not pay any real estate taxes, impact fees, ubUty connection fees, permits, etc. (unless specified). e) Compliance Wth Construction Laws and Regulations - Contractor shall comply with all the laws, ordinances, rules, regulations or orders of all public authodlies retailing to the performance of work. I) Responsibility for Negligence of Employees and Subcontractors - Contractor shall be fully responsible for all acts or omissions of Contractors employees, subcontractors and other persons doing work under any contract or agreementwith the Contractor on behalf of the Owner/Purchaser. g) Warranty of Fitness of Equipment and Materials - Contractor represents and warrants to OwnerlPurchaser that all equipment and materials will be new (unless specified). h) Safety Precautions and Programs - Contractor shall take reasonable precautions for the safety of all employees and subcontractors. Contractor is not responsible for the safety of unauthorized visitors to the job site. 1) Clean-up - Contractor shall keep the work premises free of waste material and rubbish caused by the Work. Contractor further agrees That prior to the Date of Substantial Completion to remove all such waste material and rubbish, together with all his tools, equipment, machinery and surplus materials and shall conduct general dean -up operations. 2. OWNERIPURCHASER PAYMENT OwnerlPurchaser agrees to promptly make payment directly to the Contractor in accordance with the Payment Terms. CrediVDebit card transactions shall be subject to additional service transaction fees. 3. WARRANTY & CORRECTING WORK The Contractor shall upon the completion of the work; warrant the work supervised by the Contractor and/or by subcontractors for a period of one (1) year from the date of completion against faulty and/or defective materials, equipment, and/or workmanship (Boat lit factory warranty exceeds contractor warranty — sea boat lift manufacturer warranty for details). Contractor shall not be responsible for or warrant against items affected by natural disasters, wear and tear, expansion or contraction of materials and loss or injury. 4. MISCELLANEOUS a) ASSIGNABILITY —This Agreement is not assignable by either of the Parties. b) PERMITS -This Agreement Is subject to the Contractor's ability to obtain all permits necessary to perform the Work. c) DEED RESTRICTIONS— Owner/Purchaser assures Contractor that the scope of work is approved by and/or in compliance with any Deed Restrictions that apply to the premises. Any and at fees charged by any governing association shall be the responsibility of the owner. d) ROCK & DEBRIS CLAUSE - In the event the Contractor encounters rock, rock layers, foreign material, debris, etc. during the piling installation; Contractor shall be enttled to charge an additional $195 per hour (typical 3-man crew @ $65 per man hour) for the actual additional time required to clear said material and complete the Installation. e) DIMENSIONS —All dimensions Isq. ftcalculations are approximate and may vary due to extenuating circumstances. Deck boards may be shofier than specified to allow for trimming. Wood and pilings are natural products and subject to variation. f) EXISTING CONDITIONS - owner/Purchaser assures Contractor that existing docks, boat lifts, boats, electrical, etc. are in satisfactory condition. Contractor shall not be held responsible for any existing condition causing property damage, injury or death. g) ADDITIONAL REQUESTED WORK- Ovmer/Purchaser agrees to pay Contractor for additional requested work; if applicable. Typically; Contractor will provide OwnedPurchaser with a fixed price for additional requested work. In lieu of a fixed price; Owner/Purchaser agrees to a Time & Material rate as follows: Time @ $65 per man hour & Material @ cost+ 25%+ delivery, fuel, lax, etc., If applicable. h) WATER DEPTH - OwnerlPurchaser accepts that the water depth in the area of the dock and/or boat lift (existing or proposed), even in the event of rendering them unusable, as satisfactory considering the varying tidesftidal movement. 1) REFUNDS - An Owner/Purchaser refund request will be considered without obligation by the Contractor. In the event a refund, it will be subject to deductions for administration, travel time, drawings, fees, costs, etc. j) LITIGATION - In the event of litigation arising from this Agreement the prevailing party shall be entitled to recover a attorney fees and costs from the non -prevailing party, Including any incurred on appeal. CORE Marine Contractors, Inc. P.O. Box 643711 Vero Beach, FL 32964 772.234.4226 Ph $88.858.1492 Fax