HomeMy WebLinkAboutKHOV-WS-L58-BLOWDOOREnvelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Fj—urlsdiction:
Permit #:
Job Information
Builder: V, a6\jv�;C,Community:
( Lot:
Address: c� �; P Unit:
City: �-��
State: L Zip:
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
OPRESCRIPTIVE METHOD -The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air
changes per hour at a pressure of 0.2 inch w.g. (50 pascals) in Climate Zones 1 and 2.
0 PERFORMANCE or ERI METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, as shown on FORM R405-2017 (Performahce) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH.
ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI): C�
WIG X 60 _ = t- p Method for calculating building volu
CFM(50) Building Volume ACH(50) from architectural plans
2eft'rievecl
OPASSFAIL Code software calculated
F_jWhen ACH(50) is less than 3, Mechanical Ventilation 0 Field measured and calculated
installation must be verified by building department.
Testing. Testing shall be conducted in accordance with ANSI/RESNETACC 380 and reported at a pressure or 0.2 inche w.g, (50 Pascals): Testing
shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues, or individuals licensed as set forth In Section
489.105(3)(f), (g),or (I) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1.Exterior windows and doors, fireplace and stove doors shall be closed, but notsealed, beyond the intended weatherstripping orother infiltration
control measures.
2.Dampers Including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3.lnterior doors, if installed at the time ofthe test, shall be open. -
4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
S.Heating and cooling systems, If installed at the time of the test, shall be turned off.
6,s6pply and return registers, if installed at the time of the test, shall be fully open.
Testing Company
Company Name: �� �� Phone: t)61--_Iv0 5-� �s
I hereby verify that the above Air Leak ge results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements accordin to the ompliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester: >>�
License/Certification #: � �� Issuing Authority: ilra; i
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
FORM R405 DUCT LEAKAGE TEST REPORT
PERFORMANCE METHOD
Project Name: Builder Name: K Hovnanian Homes
Cv i�-
Lot or Unit:
Permit Number:
Z.
Street: Cit tate, Z' :, 3l1 ���
��-'S �.r� v�-� fi=�
Conditioned Floor Area:
� u6y
5 stem # ,_Total Leakage: CFM total} Leakage Out: CFM (out)
Ring Used
1
z
3
4
5
Sum of lines 1-6 2 l
Conditioned floor area 140
Total house duct leakage to outdoors expressed as
(Qn,out). divide sum of lines 1-6 by conditioned
floor area to arrive at (Qn,out) O�
Qn (Out) _
Name Printed: Place Signature Below:
Frank Costagliola
Company:
Sustainabase
Certification Number:
FSEC - 1514
Test Date:
Page 1 of 1