Loading...
HomeMy WebLinkAboutIn-Place Concrete Testinga 16G7— � y�Z April 30, 2018 Florida CNG Partners 711 E 17th Street — Suite D#5 Costa Mesa, CA 92627 RE: IN -PLACE CONCRETE TESTING Gas Station 121 North Jenkings Road Fort Pierce, Florida 34947 Dear Sir or Madam: ENGINEERING & TESTING, INC. Phone: (866) 781-6889 •Faz: (866) 784-8550 ww•w.tloridaenginceringandtesting.com 250 S.W.13'h Avenue Pompano Beach, FL 33069 Job Order No.: 18-1809 Pursuant to your request, Florida Engineering & Testing, Inc., has performed rebound hammer testing on April 26, 2018 at the above referenced site to verify the compressive strength of the in - place concrete. Five (5) rebound hammer tests were performed in accordance with ASTM C-805, "Standard Test Method for Rebound Number of Hardened Concrete" using a Schmidt Hammer, Serial 4157845, Humboldt Model 4H-2975 that was last calibrated on December 15, 2017. Ten (10) tests were performed at each location and averaged to determine the indicated compressive strength of the in -place concrete. The following results were obtained: Test No. Test Locations @ Storage Tank Slab Hammer Orientation Average ReboumI No. Indicated Compressive Strength(psi) 1 NW Corner Vertical Down 40.2 5,600 2 Center Vertical Down 44.2 6,500 3 SE Corner Vertical Down 40.7 5,800 Specific information about the in -place concrete is as follows: design (4,000 psi), specifications (regular mix), and days of curing (more than 1 year). The ambient air temperature during our testing was approximately 78' F. The concrete surface was trowel or form finished (smooth), dry and was ground prior to our testing. Florida Engineering & Testing, Inc. appreciates the opportunity to be of service to you at this phase of your project. If you �r}guiestions or comments, give us a call. Sincerely,P`N-MFS �// o. 0 340� * — Mark A. Mest V.E STATE OF Florida Engine'gesting Insi � Florida Reg. No.. ,<ORl " Certificate of AutMill /66fi�%Rh�ITo� 1Q v Quality