Loading...
HomeMy WebLinkAboutRequest for Relief of Code IssueLydia Galbraith From: Mark Speccia <hytechpowerllc@yahoo.com> Sent: Thursday, January 12, 2017 10:42 AM To: Lydia Galbraith Subject: Re: Emailing - Report_FL_Review_Comments_Noncompliantjrf.pdf, 1607-0412 Attachments: Exception Request - Notarized.pdf Hi Lydia, As per your request I have attached the Request for Relief of Code Letter that is addressed to Leslie Olsen. The signed and notarized letter was also mailed to your office, along with the $50 check. Please let me know if there is anything else required for this Request for Relief of Code issue. Thanks for your assistance. Regards, Mark Speccia 954-548-7781 C E I !is E JAN 12 2017 From: Lydia Galbraith <galbraithl@stlucieco.org> To: 'Mark Speccia' <hytechpowerllc@yahoo.com> Sent: Tuesday, January 10, 2017 4:19 PM Subject: RE: Emailing - Report_FL_Review_Comments_Noncompliant_jrf.pdf, 1607-0412 Hi Mark, I have discussed Page S-3 with Ed and he is ok with it. So I will adjust the job description to add this to the permit and the only thing you will need to do is initial the change for approval at time of pick up. To update the contractor license please contact Monica Barrios at (772) 462-1542. The forms for notice of commencement, sub agreement and filled lands affidavit you will find at: http://www stlucieco oov/departments-services/a-z/planning-and-development-services/permitting- zonino/permit-applications Please address your request for relief of the code to: Leslie Olson, AICP, Director, Planning and Development Services Department. The request is based on St Lucie County Land Development Code chapter 7.04.01 ( c) (4) htti)s://www.municode.com/library/fl/st. Iucie county/codes/land development code?nodeld=CHVIIDEDEIMS T 7.04.00ARYAHEOPSPRE . Please indicate in your letter the permit number, the elevation of the center line of the road (18.84'), the proposed elevation and the reason why you are not able to meet the Code. Please use company paper with a notarized signature and send the letter to my email address. I will prepare the documents for review for the Planning Director. The cost will be $ 50.00 and will added to the permit. Please let me know if you have any questions. Thank you, Lydia Galbraith Planning & Development Services (772) 462-1555 Sr. LUCIE COUNTY 30ARD OF COUNTY COMMISSIONERS CHRIS DZADOVSKY CHAIRMAN DISTRICT 1 TOD MOWERY VICE-CHAIRMAN DISTRICT 2 LINDA BARTZ DISTRICT 3 FRANNIE HUTCHINSON DISTRICT 4 CATHY TOWNSEND DISTRICT 5 HOWARD TIFTON COUNTY ADMINISTRATOR DAN MCINTYRE COUNTY ATTORNEY MAILING ADDRESS 2300 VIRGINIA AVENUE =ORT PIERCE, FL 34982 PHONE (772) 462-2822 TDD (772) 462-1428 FAX (772) 462-1581 E-MAIL )LSONL@STLU CIECO.O RG WEBSITE W W W.STLUCIECO.GO V PLANNING AND DEVELOPMENT SERVICES DEPARTMENT Planning Division January 11,2017 Opis Energy LLC Arm. Jeff Greene 1058 Bluewood Terr. Weston, FL 33327 RE: Finished floor waiver Dear Mr. Greene: Please accept this letter in response to your written request received January 12, 2017 to waive the finished floor elevation of 18" above the crown of the road. The waiver request is for a proposed concrete utility building at 121 N. Jenkins Rd, Ft Pierce. Pursuant to Section 7.04.01(C-4) of the St Lucie County Land Development Code, the Planning and Development Services Director has the authority to grant administrative relief, when.topographical conditions are such that compliance with this subsection would be impracticable or cause grade level' conditions detrimental to adjacent or nearby property, consistent with the intent of the Flood Protection regulations and any other applicable portion of this Code. The Planning and Development Services Director has granted your request for administrative relief of the finished floor elevation based on the following determinations: 1 The property is located in a Flood Zone X. 2 The proposed utility building will be 18.84' NAVD which will be at the same elevation as the concrete slab for the Refueling station. 3 The center line of the adjacent road is 19.61'NAVD. 4 The manufacturers' recommended installation procedure for the concrete utility building is to be located in line with the Compressed Natural Gas (CNG) Compressors in order to provide electrical power to the equipment. Increasing the height of the utility building would impede the effective routing of electrical power. This approval does not in any way constitute authorization to begin construction. Prior to the commencement of any construction on this property, an application for specific building permit must be obtained from this department. Please feel free to contact me at (772) 462-2822 if you have any questions. mce ly, L s ie Olson, CP Planning and evelopment Services Director cc: Monica Graziani, Building and Code Compliance Manager Carl Peterson, Building Official Debra Zampetti, Zoning Supervisor Bonnie C Landry, AICP, Planning Manager Opis Energy, LLC Terrace Bluon, ECEIV� Floridad Weston, Floi33327 Wes 954304-0791 JAN 11 Olson 1011 St.Leslie St. Lucie County BOCC 2300 Virginia Avenue Fort Pierce, FL 34982 772-0e2-1100 BY. A Re: Request for Relief of the Code for installation of the Concrete Utility Building as per St Lurie County Land Development Code Chapter 7.04.01 (c) (4) Project: Compressed Natural Gas (CNG) Refueling Station 121 N. Jenkins Rd Ft. Pierce, FL 34947 Parcel M. 2312-144-0001-00014 Parmit#: 1607-0412 Dear Leslie Olson, This letter is a request for Relief of Code, to elevate the Concrete Utility Building, 18 Inches above the center line of the mad, with an elevation of 18.84'. As per the engineering plans, that have been submitted, there is a Concrete Utility Building thatwlll be Installed as part of our Compressed Natural Gas Refueling Station projecL The current plans show the Concrete Utility Bulking at the same elevation as the Compressed Natural Gas Refueling Station Compressors and Storage Tanks concrete slab. The manufacturers' recommended installation procedure for the Concrete Utility Building is to be located in line with the CNG Compressors, in order to effectively provide electrical power to the equipment Our conram Is that if the Concrete Utility Building were to be raised, the proposed 18 inches, It would impede the effective routing of electrical power to the CNG Compressors and may also effect the engineering specifications of the Concrete Utility Building that have been cerl8ied by the manufacturer. Your assistance in this matter is greatly appreciated. Opts Energy, LLC Signature Print Name and Provide Signatory's TAB State of Florida Countyof c/!/60U/raav The foreg ping Instrument was acknowledged before me this ay of i11LI/) . 1 le e.vae (Name of person) (Type of —authority ... e.g. Owner, officer, trustee, attorney in fad) For_cyc1 J 4 (Name of party on behalf of whom inst mLnt a executed) Personally Known_ or produced the following type of ID: NC TA P.•.•apTA )t :My Comm. OF Under penalties of perjury, I declare that 1 have read the foregoing and that the facts in It are true to the best of my knowledge and belief (section 92.525, Florida Statutes). Signature of Owner who sig d above: By: /0117 G ��