HomeMy WebLinkAboutKHOV-WS-L4-BLOWERDOOREnvelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2017 Florida Building Code, Energy Conservation, 6th Edition
Jurisdiction: Permit #: C SS>
,job Information
Builder: Lot: L
t`% - % Community: (� AA_
Address: 5a ��i n>UIUnit:
city: r�' �rCr�� Stater
Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ERI Method
.0PRESCRIPTIVE METHOD=;The bul`lding or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air,
changes per our at a pressure'of 0 2.inch w.g. (50 pascals) in Climate Zones 1 and 2.
oPERFORMANCE or "ERI METHOD. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding
the selected ACH(50) value, assIhown on FORM R405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH.
ACH(50) specified on Form R405-2017-Energy Calc (Performance) or R406-2017 (ERI):
O X 60 = I �l = Vf Method for calculating building volume:
CFM(50) Building Volume ACH(50) O Retrieved from architectural plans
QPASS ❑FAIL mode software calculated
❑ When ACH(50) is less than 3, Mechanical Ventilation O Field measured and calculated
installation must be verified by building department.
Testing. Testing shall be conducted in accordance with ANSI/RESNETACC 380 and reported at a pressure or 0.2 inche w.g. (50 Pascals). Testing
shall be conducted by,either individuals as defined in Section 553.993(5) or (7), Florida Statues, or Individuals licensed as set forth in Section
489.105(3)(0, (g), or (i),or an approved third party. A written report of the results of the test shall be signed by the parry conducting the test and
provided to the code official.; Testing shall be performed at any time after creation of all penetrations of the building thermal envelope:
During testing:;
1.Exterior windows'and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures. ,
2,Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3.Interlor doors, if, installed at the time of thetest, shall be open.
4.Exferior doors for continuous ventilation systems and heat recovery ventilators` shall be closed and sealed. ,
5.Heating and: Cooling systems, if installed at the time of the test, shall be turned off.
6.5upplyand retain registers; if installed at the time of the test, shall be fully open.
Testing Company
Company Name: �cdb� Phone:��
I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy
Conservation requirements accordi No the wmplia5ce method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester:
a� 36u Issuing Authority:
License/Certification #: g_A_
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
FORM R405 DUCT LEAKAGE TEST REPORT
PERFORMANCE METHOD
Project Name: 1
Lot or Unit: LI
Street:
d)� &
Conditioned Floor Area:
16 li
Builder Name: K Hovnanian Homes
Permit Number:
City,?atP�V` e-
q,
liar, Vital
5 g� Oout�
2
3
E4
5
Sum of lines 1-6
r
Conditioned floor area
Total house duct leakage to outdoors expressed as
(Qn,out). divide sum of lines 1-6 by conditioned
area to arrive at (Qn,out)
OOL-
-Qnfloor
(Out) _
Name Printed: Place Signatur Below:
Frank Costagliola
Company:
Sustainabase
Certification Number:
FSEC - 1514
Test Date: t/`
Page 1 of 1