Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Blower Door Test
Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2017 Florida Building Code, Energy Conservation, 6th Edition jurisdiction: I Permit #: I G ja- b l 6 Fjob Information Builder: - 00 Community: � S�ne . Lot: Address: Unit: Citv: �r W I e/�C (L State: F—L Zip: 3 LI C, 5 Air Leakage_?est Results Passing results must meet either the Performance, Prescriptive, or ERI Method aPRESCRIPTIVE METHOD The buildingo I r dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 inch w.g. (501pascals) in Climate Zones 1 and 2. O PERFORMANCE or ERI METHOD- The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50) value, as shown on FORM R405-2017 (Performance) or R406-2017 (ERI), section labeled as Infiltration, sub -section ACH. ACH(50) specified on Form R405-2017-Energy Cafc (Performance) or R406-2017 (ERI): f0"7 I— x 60 _ 1111—[0 5 _ —1 • & t/ Method for calculating building volume: CFM(50) Building Volume ACH(50) Q Retrieved from architectural plans ©PASS ❑FAIL 4-'Co'de software calculated F-lWhenACH(50) is less than 3, Mechanical Ventilation O Field measured and calculated installation must be verified by building department. Testing.. Test ingshall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure or 0.2 inche w.g. (50 Pascals), Testing shall be conducted by either individuals as defined in Section 553.993(5) orn(7), Florida Statues, or individuals licensed as set forth In Section 489.105(3)(f),, (g),;or (I) or..an approved third parry. A written report of the results of the test shall be signed by the party conducting the test and provided to the;code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: ''.Exterior windows and doors, fireplace and stave doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2.1)ampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3.Interior doors; If installed at'the time of the test, shall be open. 4.EXterior"doors for. continuous, ventilation sy stems and heat recovery ventilators shall be closed and sealed. 5.Heating and cooling systems, if installed at the time of the test, shall be turned off. 6.Supply and return registers, if installed at the time of the test, shall be fully open. " TestingCompany" Company Name: S0,-c-t)nw,la, J.� Phone: 4;3r- ( 13(y , -) `-� I hereby verify that the above Air Leakage results are in accordance with the 2017 6th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: �aZ � Date of Test:41 1 a Printed Name of Tester: q Issuing Authority: License/Certification #. ��5� FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION FORM R405 DUCT LEAKAGE TEST REPORT PERFORMANCE METHOD Project Name: Builder Name: K Hovnanian Homes Lot or Unit: Permit Number: -o(aa Street: 5d. �� � ' City, ate} Zip: /�C' Ll (' S� Conditioned Floor Area: 16�b System # Toa1 age CFM (ta#alj _: Leakage Out• CFM (out) Ring Used 1 2 3 4 5 Sum of lines 1-6 �( Conditioned floor area 6 r Total house duct leakage to outdoors expressed as t (Qn,out). divide sum of lines 1-6 by conditioned floor area to arrive at (Qn,out) to Qn (Out) = Name Printed: Place Signatu Below: Frank Costagliola Company: Sustainabase Certification Number: FSEC - 1514 Test Date: Page 1 of 1