HomeMy WebLinkAbout10603 PINE NEEDLEAPPLICATION #:AP1432154
STATE OF FLORIDA PERMIT #:56 -SF -1988105
DEPARTMENT OF HEALTH DOCUMENT #: FI 1434292
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM
CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID:09/06/2019
FEE PAID:660.00
RECEIPT #:56 -PID -4115743
APPLICANT: Charles Timmons
AGENT: Mike DiFrancesio (DiFrancesio Construction Inc.)
PROPERTY ADDRESS: 10603 Pine Needle Dr Fort Pierce, FL 34945
LOT: 26
BLOCK:
SUBDIVISION:
Pine Hollow ID#:
2321-802-0028-000-6
CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED.
TANK INSTALLATION
SETBACKS
[ ] [01]
TANK SIZE [1] 1090.00 [2]
[ ] [27]
SURFACE WATER
FT
[ ] [02]
TANK MATERIAL Polypropylene
L ] [28]
DITCHES
FT
[ ] [03]
OUTLET DEVICE
[ ] [29]
PRIVATE WELLS 100
FT
[ ] [04]
MULTI-CHAMBERED ( L_jj N ]
( ] [30]
PUBLIC WELLS
FT
[ ] [05]
OUTLET FILTER Polylok PL -68
[ ] [31]
IRRIGATION WELLS
FT
[ ) [06]
LEGEND 1. 70-143-11DC4 2.
[ ] [32]
POTABLE WATER 78
FT
[ ] [07]
WATERTIGHT
[ ) [33]
BUILDING FOUNDATIONS 7
FT
[ ] [08]
LEVEL
[ ] [34]
PROPERTY LINES 18
FT
[ ] [09]
DEPTH TO LID
[ ] [35]
OTHER
FT
DRAINFIELD INSTALLATION
FILLED / MOUND SYSTEM
[ ] [10]
AREA [1] 679.2 [2]
SQFT [ ] [36]
DRAINFIELD COVER
[ ] [11]
DISTRIBUTION BOX HEADER
X [ ] [37]
SHOULDERS
[ ] [12]
NUMBER OF DRAINLINES 1. 6.00 2.
[ ] [38]
SLOPES
[ ] [13]
DRAINLINE SEPARATION
[ ] [39]
STABILIZATION 06/22/2020
[ ] [14]
DRAINLINE SLOPE
[ ] [15)
DEPTH OF COVER
ADDITIONAL INFORMATION
[ ] [16]
ELEVATION [ ABOVE / BELOW ]BM
1.00 [ ] [40]
UNOBSTRUCTED AREA
[ ] [17]
SYSTEM LOCATION
[ ] [41]
STORMWATER RUNOFF
[ ] [18]
DOSING PUMPS
[ ] [42]
ALARMS
[ ] [19]
AGGREGATE SIZE
[ ] [43]
MAINTENANCE AGREEMENT
L 1 [20]
AGGREGATE EXCESSIVE FINES
[ ] [44]
BUILDING AREA
[ ] [21]
AGGREGATE DEPTH
[ ] [45]
LOCATION CONFORMS WITH SITE PLAN
[ ] [46]
FINAL SITE GRADING
FILL
/ EXCAVATION MATERIAL
[ ] [47]
CONTRACTOR MICHAEL W STUHR (ASHTO
[ ) [22]
FILL AMOUNT
[ ] [48]
OTHER INFILTRATOR Quick4 Plus EQ36 LP
[ ) [23]
FILL TEXTURE
( ] [24]
EXCAVATION DEPTH
ABANDONMENT
[ ] [25]
AREA REPLACED
[ ] [49]
TANK PUMPED
[ ] [26]
REPLACEMENT MATERIAL
[ ] [50]
TANK CRUSHED & FILLED
Comments: Comments
are on page 2.
Z7
CONSTRUCTION L APPROVED / St. Lucie CHD
DISAPPROVED ] ' Enviro ental Speciali an J Ingram (ENVIRONMENTAL HEALTH)
FINAL SYSTEM [ APPROVED / DISAPPROVED ]: �- St. Lucie CHD
ErMir6rimental Speciali Brian J Ingram (ENVIRONMENTAL HEALTH)
(Explanation of Violations on following page)
DH 4016, 08/09 (Obsoletes all previous editions which may not be used)
Incorporated: 64E-6.003, FAC
EH Database v 1.0.1 AP1432154 EID1988105
DATE: 04/24/2020
DATE: 06/22/2020
Page 2 of 3
� rt�
;`'• yR ��y STATE OF FLORIDA
DEPARTMENT OF HEALTH
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM
CONSTRUCTION INSPECTION AND FINAL APPROVAL
we
Violation Number Comment
Comments
APPLICATION #:AP1432154
PERMIT #:56 -SF -1988105
DOCUMENT #:F11434292
DATE PAID:09/06/2019
FEE PAID: 660.00
RECEIPT #:56 -PID -4115743
The system is sized for 3 bedrooms with a maximum occupancy of 6 persons (2 per bedroom), for a total estimated flow of 400
gpd.
New ST, filter, and 6x10 long BED DF installed. No violations, system ok to cover. Contractor notified by phone. Needs final
inspection for mound system, gutters, and final site grading.
Final system approved. Contractor and building department emailed final approval.
DH 4016, 08/09 (Obsoletes all previous editions which may not be used)
Incorporated: 64E-6.003, FAC Page 2 of 3
EH Database v 1.0.1 AP1432154 EID1988105