Loading...
HomeMy WebLinkAboutblow doorPlanning & DeveloPment Services Bulldlng & Code Regulation Division 23fi)Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone: 772'462-2L65 Fax: 772'462'6443 BLOWER DOOR TEST FORM House tnfiltration Test Certification Prescriptive and Performance Method Job Address: Construction: Date:Permit #:l7n ,t6 Contractor: (f nfew Construction - ComPlete ( l Existing - After Addition House lnfiltration Test Results CFM (50| = Volume =4)o Mechanical Ventilatioa required less than 3 ACH |QPass { )Fait AcH {5ol = CFM {50} x 50/ Volume Passing resutts must be & ACH {50} or less FBC, Energy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceedingT atr changes per hour in climate zone L,2 and 3 air changes per hour in climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 pascals). Testing shall be conducted by either individuals as defined in Section 553"993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3xfl, (S) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided ta the code officiat. Testing shall be performed at any time after creation of all penetrat,ons of lhe building thermol envelope. FBC, Residential Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R4A2-4.7.2 af the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole-house mechanical ventilation in accordance with Section M1507.3. Testins Companv company Name: Florida Energy Testing Address: I hereby certify that the above House lnfiltration results demonstrate compliance with FBC Energy Conservation requirements in accordance with Section R402.4.L.2 Climate Zone 2. Signature Frinted Name: LicenselCertification #;B l&tG Se.t. ?n-uq;AuF ?SL SLC Climate Zonel -l t \ rest Date: 5 / JC /JOXI