Loading...
HomeMy WebLinkAboutEnergy CodeFORM R405-2017 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method ProjectName: WYNNET\HE GRAND CARLTON IMPACT BullderName: WYNNE BUILDING COPR. Street: �`\ V'P-Q 4_ N Permit Office: ST. LUCIECOUNTY City, State, Zip: FT. PIERCE, FL, PermitNumber: Owner: WYNNE BUILDING CROP Jurisdiction: ST. LUCIE COUNTY DesignLocation: FL, Fort Pierce County: St. Lucie (Florida Climate Zone 2 ) 1. New construction or existing. New (From Plans) 9. Wall Types (1442.0 sgft.) Insulation Area 2. Single family or multiple family Single-family a. Concrete Block- Int lnsul, Extedor R=4.1 1250.00 ft2 b. Frame -Wood, Adjacent R=11.0 192.00 ft2 3. Number of units, if multiple family 1 c. N/A R= fN 4. Number of Bedrooms 2 d•N/A R= ft2 5. Is this a worst case? Yes " 10. Ceiling Types (1476.0 sqft.) Insulation Area a. UnderA6lc(Vented) R=30.0 1446.00 ft2 6. Conditioned fiocrarea above grade (ft2) 1446 b. Knee Wall (Vented) R=19.0 30.00 ft2 Conditionedfioorarea belowgrade(ft2) 0 c. N/A R= ft2 11. Ducts R ft2 7. Windows(441.3 sqft.) Description Area a. Sup: Attic, Ret: Attic, AH: Attic 6 175 a. U-Factor. SgI, U=1.04 101.25 ft2 SHGC: SHGC=0.29 ' b. U-Factor: SgI, U=1.11 40.00 f2 12. Cooling systems kBtulhr Efficiency .SHGC: SHGC=0.27 a. Central Unit 34.8 SEER:15:00 c. U-Factor N/A ft2 SHGC: 13. Heating systems kBtuBv. Efficiency d. U-Factor: N/A ft2 a. Electric Heat Pump 34.8 HSPF:8.50 SHGC: Area Welghted,AverageOverhang Depth: 3.832 ft. Area Weighted Average SHGC: 0.284 14.Hotwatersystems _ 8. Floor Types (1445.5 sgft.) Insulation Area a: Electric Cap:40.gallons a. Slab -On -Grade Edge Insulation R=0.0 1445.50 ft2 b. Conservation features EF: 0.9701 b. N/A R= ft2 None c. N/A R= ft2 15.Credits.. Pstat Glass/Floor Area: 0.098 Total Proposed Modified Loads: 47.50 PASS Total Baseline Loads: 48.09 1 hereby certify that the plans and specifications covered by Review of the plans and fllES �� thiscalculation are in compliance with the Florida Energy specifications covered by this 2 p Cade. calculation Indicates compliance$� AC with the Florida Energy Code. -/'� PREPARED BY: 4� Before construction is completed c DATE: 1-9 2D this building will be inspected for compliance with Section553.908 >_ hereby certify that this building, as designed, is in ompliance Florida Statutes. lj,. with the Florida Energy Code. �''O�,i} S OWNER/AG Nip. BUILDING OFFICIAL: DATE: DATE: - Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as certified factory -sealed in accordance with R403.3.2.1. - Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2). REVIEWED FOR CODE COMPLIANCE 118/20204:18 PM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017 F13C 6th Ediliorn(R617)/Cprr/Wlarltet4lo UNTY Pagel of5 BOCC FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT PROJECT . Title: WYNNE THE GRAND CARLT -Bedrooms: 2 Address Type: StreetAddress Building Type: User ConditionedArea: 1446 Lot# OwnerName: WYNNE BUILDING CROP Total Stodes: 1 Block/Subdivision: #of Units: 1 Worst Case: Yes PlatBook: BuilderName: WYNNE BUILDING COPR. RotateAngle: 180 Street: Permit Office: ST. LUCIE COUNTY CrossVentilation: No County: St. Lucie Jurisdiction: ST. LUCIE COUNTY Whole House Fan: No City, State,2ip: FT. PIERCE, FamilyType: Single-family FL, New/Fxdsgng: New (From Plans) Comment: CLIMATE / Design Temp Int Design Temp Heating Design DaliyTemp V DesignLocaflon TMYSite 97.5% 2.5% Winter Summer Degree Days Moisture Range FL, Fort Pierce FL VERO BEACH MUNI 39 90 70 75 299 62 Low BLOCKS Number Name Area Volume 1 Entire House 1446 11568 SPACES Number Name Area Volume Kitchen Occupants Bedrooms Infil ID Finished Cooled Heated 1 BEDROOM 301 2408 No 0 1 1 Yes Yes Yes 2 WIC 63 -504 No 0 1 No Yes Yes 3 M. BATH 56 448 No 0 1 Yes Yes Yes 4 KITCHEN 192 1536 Yes 0 1 No Yes Yes 5 BATH. 45 360 No 0 1 Yes Yes Yes 6 BEDROOM 204 1632 No 0 .1 1 Yes Yes Yes 7 ENTRY 55 440 No 0 1 Yes Yes Yes 8 LAUNDRY 42 336 No 0 1 Yes Yes Yes 9 GREAT/DINING 488 3904 No 0 1 Yes Yes Yes FLOORS # FloorType Space Perimeter PerimeterR-Value Area JoistR-Value Tile Wood Carpet 1 Slab-On-GradeEdgelnsulation BEDROOM 52 It 0 301 ft- ____ 0 1 0 2 Slab -On -Grade Edge Insulation WIC 1ft 0 63 ft' ____ 0 1 0 3 Slab-On-GmdeEdgelnsulation M.BATH 8ft 0 56 ft' ____ 0 1 0 4 Slab -On -Grade Edge Insulation KITCHEN 1ft 0 192 ft' ___ 0 1 0 5 Slab-On-GradeEdgelnsulation BATH 5ft 0 45 ft' ____ 0 1 0 6 Slab -On -Grade Edge Insulation -BEDROOM 32.2ft 0 203.5 ft', ____ 0 1 0 7 Slab -On -Grade Edge Insulation ENTRY 7ft 0 55ft _-__ 0 1 0 1/8/20204:18 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC6th Edition(2017) Compliant Software Page 2of5 FORM R405-2017 INPUT. SUMMARY CHECKLIST REPORT FLOORS # FloorType Space Perimeter PerimeterR-Value Area JoistR-Value Tile Wood Carpet 8 Slab-On-GradeEdgelnsulation LAUNDRY 6 ft 0 42 ft' ---- 0 1 0 9 Slab-On-GradeEdge Insulation GREAT/DINING 46ft 0 488 ft' ---- 0 1 0 ROOF / Roof Gable Roof Red Solar SA Emitt Emitt Deck Pitch V # Type Materials Area Area Color Barr Absor. Tested Tested Insul. (deg) 1 GableorShed Metal 1524 ft' 240 ft' Light N 0.6 No 0.9 No 0 18.4 ATTIC / V # Type Ventilation Vent Ratio (1 in) Area RBS IRCC 1 Full attic Vented 150 1446 ft' N N CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 UnderAttic(Vented) BEDROOM 30 Blown 301 ft' 0.1 Wood _ 2 UnderAtfic(Vented) WIC 30 Blown 63 R' 0.1 Wood _ 3 UnderAttic(Vented) M.BATH 30 Blown 56 ft' 0.1 Wood 4 UnderAtOc(Vented) KITCHEN 30 Blown 192f- 0.1 Wood 5 UnderAttic(Vented) BATH 30 Blown 45 ft' 0.1 Wood _ 6 UnderAttic(Vented) BEDROOM 30 Blown 204ft 0.1 Wood 7 UnderAttic(Vented) ENTRY 30 Blown 55 ft' 0.1 Wood _ 8 UnderAttie(Vented) LAUNDRY 30 Blown 42 rP 0.1 Wood _ 9 UnderAtGc(Vented) GREATIDINING 30 Blown 488ft' 0.1 Wood 10 Knee Wall (Vented) GREAT/DINING 19 Blown 30 f' 0.11 Wood WALLS Adjacent Space Cavity Width Height Sheathing Framing, SolarAh"r Below _ 1 NE=>SW Exterior Concrete Block- Int lnsul BEDROOM 4.1 10 0 8 0 80.0 ft' 0 0 0.4 0 _ 2 SW=>NE Extedor Concrete Block- IntlnsulBEDROOM 4.1 28 0 8 0 224.0 ft' 0 0 0.4 0 _ 3 NW=>SE Exterior Concrete Block- Int lnsul BEDROOM 4.1 14 0 8 0 112.0111' 0 0 0.4 0 _4. SW=>NE Exterior Concrete Block-Intlnsul M.BATH 4.1 8 0 8 0 64.0 ft' 0 0 0.4 0 _ 5 NE=>SW Exterior Concrete Block - Intlnsul BATH 4.1 5 0 8 0 40.0 ft' 0 0 0.4 0 _ 6 NE=>SW Exterior Concrete Block- Int lnsuBEDROOM2 4.1 16 0 8 0 128.0 ft' 0 0 0.4 0 _ 7 SE=>NW Exterior Concrete Block- Int lnsuBEDROOM 2 4.1 10 0 8 0 80.0 ft' 0 0 0.4 0 8 S=>N Exterior Concrete Block- Int lnsuBEDROOM 2 4.1 4 3 8 0 34.0 ft' 0 0 0.4 0 9 SW=>NE Exterior Concrete Block- Int InsuBEDROOM 2 4.1 2 0 8 0 16.0 fN 0 0 0.4 0 10 SE=>NW Exterior Concrete Block- Intlnsul ENTRY 4.1 6 0 8 0 48.0 ft' 0 0 0.4 0 11 SW=>NE Exterior Concrete Block-Intlnsul ENTRY 4.1 1 0 8 0 8.0 ft' 0 0 0.4 0 12 SW=>NE Exterior Concrete Block - Intlnsul LAUNDRY 4.1 6 0 8 0 48.0 fF 0 0 0.4 0 13 NE=>SW Exterior Concrete Block- IntlnsuGREAT/DINI 4.1 26 0 8 0 208.0 ft' 0 0 0.4 0 14 NW=>SE Exterior Concrete Block-Int lnsuGREAT/DINT 4.1 20 0 8 0 160.0 ft' 0 0 0.4 0 1/8/2020 4:18 PM EnergyGaugeO USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 3 of 5 FORM R405-2017 INPUT SUMMARY'CFIECKLIST REPART WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Below 0 _15 N=>S Garage Frame -Wood KITCHEN 11 24 8 192.0 ft2 0.23 0.4 0 DOORS # Orm DoorType Space Storms U-Value Ft Width Height In Ft In Area 1 SE=>NW Insulated ENTRY None .39 3 1 6 8 20.6 ft' WINDOWS Orientation shown is the entered orientation.(=>) changed to Worst Case. / Wall V # Ornt ID Frame Panes NFRC U-Factor SHGC Imp Overhang Area Depth Separation IntShade Screening 1 NW=>SE 3 Metal 2 SW=>NE 4 Metal 3 SE=>NW 7 Metal 4 NE=>SW13 Metal 5 NW=>SE14 Metal Low-ESingle Low-ESingle Low-ESingle Low-ESingle Low-ESingle Yes 1.04 0.29 Y Yes 1.04 0.29 Y Yes 1.04 0.29 Y Yes 1.04 0.29 Y Yes 1.11 0.27 Y 32.9 ft2 1 ft 0 in 6.9 ft' 1 ft 0 in 24.0 ft2 6 ft0ln 37.5 ft2 1 ft 0 in 40.0 112 8 ft 0 in 1 ft 5 in Drapesiblinds 1 ft 5 in None 1 ft 6 in None 1 ft 5 in None 1 ft5 in Drapes/blinds Extedor5 None None None EMedor5 GARAGE # FloorArea CeilingArea Exposed Wall Perimeter Avg.WaIIHeight ExposedWalllnsulation 1 315 ft2 315ft2 4ft 8ft 11 INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 1 Wholehouse ProposedACH(50) .000356 1349.6 74.09 139.34 .1233 7 HEATING SYSTEM # System Type Subtype Speed Efficiency Capacity Block Ducts 1 Electric Heat Pump/ Split Single HSPF:8.5 34.8 kBtu/hr 1 sys#1 COOLING SYSTEM # System Type Subtype Subtype Efficiency Capacity Air Flow SHR Block Ducts _ 1 Central Unit/ Split Single SEER:15 34.8 k8tu1hr cfm 0.8 1 sys#1 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Electric None Garage 0.97 40 gal 60.9gal 120deg None 118/2020 4:18 PM EnergyGauge®USA 6.0.02(Rev.1)-FlaRes2017FBC6thEdition (2017)Compliant Software .Page'4of5 FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT SOLAR HOT WATER SYSTEM FSEC Collector Storage Carl# CompanyName System Model# CollectorModel# Area Volume FEF None None ( ft2 DUCTS / —Supply— —Return— Air CFM 25 CFM25 HVAC# V # Location R-Value Area Location Area LeakageType Handler TOT OUT QN RLF Heat Cool 1 Attic 6 175 ft2 Attic 65 ft2 Defaul2Leakage Attic .(Default) c(Default) c 1 1 TEMPERATURES ProgramableThermostat: Y Ceiling Fans: Cooling Jan Feb Venting HJan Mar Mar �Aprrrrr Apr May rr ([J0] So rOct (r7�'( v Dee HDec [ ]Feb X [x�Jun [x�Jul [ ]Aug ' Sep Oct [X]Nov ThermostalSchedule: HERS 2006 Reference Hours ScheduleType 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 COOling(WEH) PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM. 68 68 68 68 68 68 68 68 68 68 66 66 MASS Mass Type Area Thickness FumilureFracticn Space Default(8 lbs/sq.ft. 0 ft2 Oft 0.3 BEDROOM Default(81bs/sq.ft ft2 ft 0.3 WIC Default(8lbs/sq.ft. ft2 ft 0.3 M. BATH Default(8lbs1sq.fL ft2 ft 0.3 KITCHEN Defaull(81bs/sqft ft2 ft 0.3. BATH Default(8lbs/sq.ft ft2 it 0.3 BEDROOM 2 Default(81bs/sq.ft. ft2 ft 0.3 ENTRY Default(8lbs/sq.ft. ft2 ft 0.3 LAUNDRY Default 81bs/s .ft. ft2 ft 0.3 GREAT/DINING 118/2020 4:18 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5 2017 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: WYNNE THE GRAND CARLTON IMPACT Builder Name: WYNNE BUILDING COPR. Street: Permit Office: ST. LUCIE COUNTY City, State, Zip: FT. PIERCE, FL, Permit Number: U Owner. WYNNE BUILDING CROP Jurisdiction: ST. LUCIE COUNTY = Design Location: FL, Fort Pierce U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building.envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The Insulation in any dropped ceiling/soft the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within comers and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be Insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per Inch minimum. Exterior thermal envelope. Insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/door Jambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim Joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be Installed at any exposed edge of Floor framing cavity insulation shall be installed to (including Insulation. maintain permanent contact with the underside of above -garage subfioor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous Insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided Instead of floor insulation, Insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut tofit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Alr sealing shall be provided between the garage and conditioned spac Bs. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and'plumbing in exteriorwalls, or Insulation that on Installation readily conforms to available space shall extend behind ninina and wirina. Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showersand tubs. be Insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air -sealed boxes shall be Installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be sealed to the sub -floor or drywall. Concealed When required to be sealed, concealed fire sprinklersshall only be J sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids fire nrfnki QQXff_UIa1U and wall orcpilina I a. In addition, inspection of log:walls shall be in accaMance with the provisionsof [CC-400: -1/8/2020 4:19 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1 2017 EPL DISPLAY CARD ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 99 The lower the Energy Performance Index, the more efficient the home. 1. New home or, addition 1. New (From Plans) 12. Ducts, location & insulation level a) Supply ducts R 6.0 2. Single-family or multiple -family 2. Single-family b) Return ducts R 6.0 c) AMU location Attic 3. No. of units (if multiple -family) 3. 1 4. Number of bedrooms 4. 2 13. Cooling system: Capacity 34.8 a) Split system SEER 15.0 5. is this a worst case? (yes/no) 5. Yes b) Single.package .SEER c) Ground/water source SEER/COP 6. Conditioned floor area (sq. ft.) 6. 1446 d) Room unitIPTAC EER e) Other 7. Windows, type and area a) U-factor:(weighted average) 7a. 1.060 b) Solar Heat Gain Coefficient (SHGC) 7b. 0.284 14. Heating system: Capacity 34.8 c) Area 7c. 141.3 a) Split system heat pump HSPF 8.5 b) Single package heat pump HSPF 8. Skylights - c) Electric resistance COP ' a) U-factor:(vreighted average) 8a. NA d) Gas furnace, natural gas AFUE b) Solar Heat Gain Coefficient (SHGC) 8b. NA e) Gas furnace, LPG AFUE f) Other 9. Floor type, Insulation level: a) Slab -on -grade (R-value) 9a.- 0.0 b) Wood, raised (R-value) 9b. 15. Water heating system c) Concrete, raised (R-value) 9c. a) Electric resistance EF 0.97 b) Gas fired, natural gas EF 10. Wall, type and insulation: c) Gas fired, LPG . EF A. Exterior: , d) Solar system with tank EF 1. Wood frame -(insulation R-value) 10A1. e) Dedicated heat pump with tank EF_ 2. Masonry (Insulation R-value) 10A2. 4.1 f) Heat recovery unit HeatRec% B. Adjacent: g) Other 1. Wood frame (Insulation R-value) 1081. 11.0 2. Masonry (Insulation R-value) 1062. 16. HVAC credits claimed (Performance Method) 11. Ceiling type and insulation level a) Ceiling fans a) Under attic 11a. 30.0 b) Cross ventilation No b) Single assembly 11b. c) Whole house fan No c) Knee walls/skylight walls 11c. 19.0 d) Multizone cooling credit d) Radiant barrier installed 11d. No e) Multizone heating credit f) Programmable thermostat Yes *Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, If not DEFAULT 1 certify that this home has complied with the Florida Building Code; Energy Conservation, through the above energy saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL display card will be completed based on installed code compliant features. Builder Signature: Date: Address of New Home: V Q I v City/FL Zip: FT. PIERCE; FL-Im q 1/8/2020 4:19:34 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1