Loading...
HomeMy WebLinkAboutCompaction TestANDERSEN ANDRE CONSULTING ENGINEERS; INC. 834 SW Swan Avenue Port St. Lucie, Florida 34983 Phone: 772-807-9191 Fax: 772-807-9192 www.aaceinc.com FIELD DENSITY TEST REPORT PROJECT: FPL Solar Interstate Education/Operation Center FILE NO: 20-148 St. Lucie County, FIL REPORT NO: 15 REPORTED TO: Curington Contracting CC: DATE OF TEST(S): 06/25/2020 PAGE NO.: 1 OF 1 TEST NO. Building Foundations, Column Footings MDR MOISTURE DRY DENSITY PERCENT DEPTH NO. CONTENT (%) (PCF) COMPACTION LOCATION 1 Gridline A-2 3065 8.8 107.2 96 0 to -12" F 2 Gridline A-3 3065 8.2 106.5 95 0 to -12" F 3 Gridline A-4 3065 9.0 107.4 96 0 to -12" F 4 Gridline A-5 3065 8.3 107.0 96 0 to -12" F 5 Gridline G-2 3065. 8.7 106.7 96 0 to -12" F 6 Gridline G-3 3065 9.2 107.3 96 0 to -12" F 7 Gridline G-4 3065 8.9 107.9 97 0 to -12" F 8 Gridline G-5 3065 9.5 107.5 96 0 to -12" F * DENOTES IN -PLACE DENSITY TEST DOES NOT MEET MINIMUM COMPACTION REQUIREMENT OF 95 PERCENT. ** RETEST INDICATED DENSITY MEETS OR EXCEEDS MIN. DENSITY REQUIREMENTS PER SPECIFICATIONS FIELD TEST: r` ASTM D-2937 ��, ASTM D-2922 F,_ ASTM D-2167 ASTM D-1556 TECHNICIAN: SM REMARKS: LABORATORY MOISTURE -DENSITY RELATIONSHIP F = SOIL DIRECTLY BELOW FOOTING FS = FLOOR SLAB SUBGRADE OPTIMUM ASTM MAX. GA = SOIL IN GENERAL COMPACTED AREA PAV = SOIL BELOW STABILIZED SECTION MDR NO. MOISTURE TEST METHOD DENSITY PSSG = STABILIZED SUBGRADE PB = PAVEMENT BASE CONTENT RS = ROADWAY NSSG = NON STABILIZED SUBGRADE 3065 D1557 111.7 PCF 10.1 % SBP= SOIL BELOW PAVEMENT TOP = TOP OF PIPE BOP = BOTTOM OF PIPE BOS = BOTTOM OF STRUCTURE OTHER: -Lev. /i�� ,F s rG. Andersen, P.E. a J`la. RtWN(5i9W AS A MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMITTED AS THE CO1Et DUWIIL PROPERTY OFCLIENTS AND A�01C RWATION FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS.RE �D PENLLCICDyA�/� prEN APPAf ,Lr a�f, IF�� C V1• o co 0 oNA�.� vireo ANDERSEN ANDRE CONSULTING ENGINEERS, INC. 834 SW Swan Avenue Port St. Lucie, Florida 34983 Phone: 772-807-9191 Fax: 772-807-9192 www.aaceinc.com FIELD DENSITY TEST REPORT PROJECT: FPL Solar Interstate Education/Operation Center FILE NO: 20-148 St. Lucie County, FL REPORT NO: 16 REPORTED TO: Curington Contracting CC: DATE OF TEST(S): 06/25/2020 PAGE NO.: 1 OF 1 TEST NO. Elevator Pit Footing MDR NO. MOISTURE CONTENT (%) DRY DENSITY (PCF) PERCENT COMPACTION DEPTH LOCATION 1 Center of Pit Footing 3065 9.5 108.1 97 0 to -12" F * DENOTES IN -PLACE DENSITY TEST DOES NOT MEET MINIMUM COMPACTION REQUIREMENT OF 95 PERCENT. ** RETEST INDICATED DENSITY MEETS OR EXCEEDS MIN. DENSITY REQUIREMENTS PER SPECIFICATIONS FIELD TEST: ASTM D-2937 Cv ASTM D-2922 r ASTM D-2167 ' ASTM D-1556 TECHNICIAN: SM REMARKS: LABORATORY MOISTURE -DENSITY RELATIONSHIP F = SOIL DIRECTLY BELOW FOOTING FS = FLOOR SLAB SUBGRADE ASTM MAX. OPTIMUM GA = SOIL IN GENERAL COMPACTED AREA PAV = SOIL BELOW STABILIZED SECTION MDR NO. TEST METHOD DENSITY MOISTURE PSSG = STABILIZED SUBGRADE PB = PAVEMENT BASE CONTENT RS = ROADWAY NSSG = NON STABILIZED SUBGRADE 3065 D1557 111.7 PCF 10.1 % SBP= SOIL BELOW PAVEMENT TOP = TOP OF PIPE BOP = BOTTOM OF PIPE BOS = BOTTOM OF STRUCTURE OTHER: ANX1111(�I1 GE � r •�kP i •m —Pe r ^. Andersen, P. ; Z _ �. }Reg. No. 57W//''��CC AS A MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMITTED AS THE CONFIDENI'� � RTYsrC�L.11EFhSATID AUTFjyif TI4 FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESEF�iCP 13V R WRITTEN APPRjYt/Yt/(�(/ tPS,ORID P-•C�.���1ie�