HomeMy WebLinkAboutEnergy CodeFORM R405-2017
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
Florida Department of Business and Professional Regulation - Residential Performance Method
ProjectName: WYNNE THE GRAND CARLTON IMPACT
BuilderName: WYNNE BUILDING COPR.
Street: 11;t 71 cl� q� n Ci
Permit Office: ST. LUCIE.000NTY
City, Slate, Zip: FT. PIERCE, FL,
PennitNumber:
Owner: WYNNE BUILDING CROP
Jurisdiction: ST. LUCIE COUNTY
DesignLocalion: FL, Fort Pierce.
County: SL Lucie (Florida Climate Zone 2)
1. New construction or existing, New (From Plans)
9. Wall Types(1442.0 sgft.)
Insulation Area
2. Single family or multiple family Single-family
a. Concrete Block- Int lnsul, Extedor
R=4.1 1250.00 ft'
b. Frame -Wood, Adjacent
R=11.0 192.00 ft2
3. Number of units, if multiple family 1
c.N/A
R= 112
4. Number of Bedrooms, 2
d•N/A
R= ft2
IO.Ceiling Types (1476.0 sgft.)
Insulation Area
5. Is lhisaworsl case? Yes
a. UnderAttic(Vented)
R=30.0 1446.00 ft2
6. Conditioned Ooorarea above grade (ft2) 1446
b. Knee Wall (Vented)
R=19.0 30.00 ft2
Conditioned 9oorarea below grade (ft') 0
c.N/A
R= ft2
11. Ducts
R ft2
7. Wmdows(141.3 sqft.) Description Area
a. Sup: Attic, Ret: Attic, AH: Attic
6 175
a. U-Factor: Sgl, U=1.04 101.25 ft2
SHGC: SHGC=0.29
b. U-Factor: Sgl, U=1.11 40.00 ft2
12. Cooling systems
kBtu/hr Efficiency
SHGC: SHGC=0.27
a. Central Unit
34.8 SEER:15.00
C. U-Factor: N/A ft'
SHGC:
13. Heating systems
kBtu/hr Efficiency
d. U-Factor: NIA ft2
a. Electric Heat Pump
34.8 HSPF:8.50
SHGC:
Area Weighted Average Overhang Depth: 3.832 ft.
Area Weighted Average SHGC: 0284
14. Hotwalersystems
A. Electric
Cap:40gallons
8. FloorT es (1445.5 sqft.) Insulation Area
YP
EF: 0.970
a. Slab -On -Grade Edge Insulation R=0.0 1445.50 ft'
b. Conservation features
b. NIA R= ft'
None
c. NIA R= ft2
15. Credits
Patel
Glass/Floor Area: 0.098 Total Proposed Modified Loads: 47.50
PASS
Total Baseline Loads: 48.09
I hereby certify that the plans and specifications covered by
Review of the plans and
4T STg7
this calculation are incompliance with the Florida Energy
specifications covered by this
,y� 0 leoA
Code.
calculation indicates compliance
1. �O
��1i
with the Florida Energy Code.
rnd(�. %-° f
PREPARED BY:.
Before construction is completed
r�
Ts'"�Y
DATE: I q-2f)
this building will be inspected for
compliance with Section 553.908
9sr
4)li-
• ' o
I hereby certify that this building, as designed, is in compliance
Florida Statutes.
!�
COD
with the Florida Energy Co
W£1�
OWNER/AGEN5:
BUILDING OFFICIAL:
DATE: � \ rid
DATE:
Compliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
- Compliance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires
an envelope leakage test report with envelope leakage no greater than 7.00 ACH50 (R402.4.1.2).
1AEVIEWpE�® FyOpp"�CE
1/8/20204:18 PM EnergyGauge@ USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th F,dgior�(0 C9r I�' gCBolW4N Pagel of
L JSVVTe. LU LUNTY
OCO
FORM R405-2017 INFO I SUMMAKT UHt:t:KLIJ I KCI'UKI
PROJECT
- Title: WYNNE THE GRAND CARLT Bedrooms: 2
Address Type:
StreetAddress
Building Type: Usei - CondibonedArea: 1446
Lot#
OwnerName: WYNNE BUILDING CROP Total Stones: 1
Block/Subdivision:
#of Units: 1 Worst Case: Yes
PlatBook:
BuilderName: WYNNE BUILDING COPR. RotateAngle: 180
Street:
Permit Office: ST. LUCIE COUNTY CrossVentilation: No
County:
St. Lucie
Jurisdiction: ST. LUCIE COUNTY Whole House Fan: No
City, State, Zip:
F.T. PIERCE,
'
Family Type: Single-family
FL,
New/Fxisting: New (From Plans)
Comment:
CLIMATE
/ Design Temp
Int Design Temp Heating
.Design DailyTemp
DesignLocation TMYSite 97.5% 2.5%
Winter
Summer Degree Days Moisture
Range
FL, Fort Pierce FL_VERCIBEACH MUNI 39 90
70
75 299
62
'Low
BLOCKS
Number Name Area Volume
1 Entire House 1446 11568
"
SPACES'
Number Name Area Volume Kitchen Occupants
Bedrooms
Infil ID Finished Cooled
Heated
1 BEDROOM 301 2408 No 0
1
1 Yes
Yes
Yes
2 WIC 63 504 No 0
1 No
Yes
Yes
3 M.BATH 56 448 No 0
1 Yes
Yes
Yes
4 KITCHEN 192 •1536 Yes 0
1 No
Yes
Yes
5 BATH 45 360 No 0
1 Yes
Yes
Yes
6 BEDROOM 2 204 1632 No 0
1
1 Yes
Yes
Yes
7 ENTRY 55 440 No 0
1 Yes
'.Yes
Yes
8 LAUNDRY 42 336 No 0
1 Yes
Yes
Yes
9 GREAT/DINING 488 3904 No -. 0
1 Yes
Yes
Yes
FLOORS
# FloorType Space Perimeter, PenmeterR-Value
Area
JoistR-Value
Tile Wood
Carpet
' 1 Slab -On -Grade Edgelnsulation BEDROOM 52 ft 0
301 ft'
----
0 1
0
2SIab-On-GradeEdgeinsulallon WIC 1 ft 0
63 ft'
----
0 1
0
3 Slab -On -Grade Edge Insulation M•BATH 8ft 0
56 ft'
_---
0 -. 1
0
4 Slab -On -Grade Edge Insulation KITCHEN 1 ft 0
192,ft'
---
0 1
0
5 Slab -On -Grade Edgelnsulation BATH 5ft 0
45 ft'
___-
0 1
0
6 Slab -On -Grade Edge Insulation BEDROOM2 .32.2ft 0
203.5 ft'
- — -
0 1
0
7 Slab -On -Grade Edgelnsulation ENTRY 7ft 0
55 to
----
0 1
0
1/812020 4:18 PM . EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 2 of 5
.FORM R405-2017 INPUT SUMMARY CHEGKL15T REPORT
FLOORS
# FloorType Space Perimeter PedmeterR-Value
Area
Joist R-Value
Tile
Wood Carpet
8 Slab -On -Grade Edge Insulation LAUNDRY 6ft,
0
42 ft'
____
0
1
0
9 Slab -On -Grade Edge Insulation GREATIDINING 46ft
0
488 it'
_�_
0
1
0
ROOF
/ Roof
Gable
Roof
Red
Solar
SA Emil
Emitt Deck
Pitch
Type Materials Area
Area
Color
Barr
Absor.
Tested
Tested Insul.
(deg)
1 GableorShed Metal 1524 ft'
240 ft'
Light
N
0.6
No 0.9
No 0
18.4
ATTIC.
/
V
# Type Ventilation'
Vent Ratio (I in)
Area
RBS
IRCC.
1 Full attic Vented
150
1446 ft'
N
N
CEILING
# CeilingType Space
R-Value
Ins Type
Area
Framing Frac
Truss Type
_ 1 UnderAttic(Vented) BEDROOM
30
Blown
301 ft'
0.1
Wood
2 UnderAttic(Vented) WIC
30
Blown
63 ft'
0.1
Wood
3 UnderAttic(Vented) M. BATH
30
Blown
S6.ft'
0.1
Wood
4 UnderAtOc(Vented) KITCHEN
30
Blown
192 ft'
0.1
Wood
_ 5 UnderAttic(Vented) BATH
30
Blown
45 fP
0.1
Wood
.6 UnderAttic(Vented) BEDROOM
30
Blown
204 ft'
0.1
Wood
7 UnderAttic(Vented) ENTRY
30
Blown
55 ft'
0.1
Wood
_ 8 UnderAttic(Vented) LAUNDRY
30
Blown
42 fN
0.1
Wood
_ 9 UnderAttic(Venled) GREATIDINING
30
Blown
488 ft'
0.1
Wood
10 KneeWall(Vented) GREAT/DINING
19
Blown
30 ft'
0.11
Wood
WALLS
Adjacent Space Cavity Width
Height
Sheathing Framing. Solar
Below
_ 1 NE=>SW Exterior Concrete Block- Int lnsul BEDROOM
4.1 10
0 8
0
80.0 ft'
0
0
0.4
0
_ 2 SW=>NE Exterior Concrete Block- Int lnsul BEDROOM
4.1 28
0 8
0
224.0 ft'
0
0.
0.4
0
_ 3 NW=>SE Exterior Concrete Block- Int lnsul BEDROOM
4.1 14
0 8
0
112.0 fl'
0
0
0.4
0
_ 4 SW=>NE Exterior Concrete Block -Int lnsul M. BATH
4.1 8
0 8
0
64.0 fP
0
0
0.4.
0
_ 5 NE=>SW Exterior Concrete Block -Int lnsul BATH
4.1 5
0 8
0
40.0 ft'
0
0
0.4
0
6 NE=>SW Exterior Concrete Black- IntlnsuBEDROOM 2
4.1 16
0 8
0
128.0ft'
0
0
0.4
0
7 SE=>NW Exterior Concrete Block- IntlnsuBEDROOM 2
4.1 10
0 8
0
80.0 ft'.
0
0
0.4
0
8 S=>N Exterior Concrete Block= Int lnsuBEDRGOM 2
4.1 4
3 8
0
34.0 ft'
0
0
0.4
0
9 SW=>NE Exterior Concrete Block- Int lnsuBEDROOM 2
4.1 2
0 8
0
16.0 fN
0
0
0.4
0
10 SE=>NW Exterior Concrete Block -Int lnsul ENTRY
4.1 6
0 8
0
48.0 ft'
0
0
0.4
0
11 SW=>NE Exterior Concrete Block -Int lnsul ENTRY
4.1 1
0 8
0
8.0 ft'
0
0
0.4
0
12 SW=>NE Exterior Concrete Block- Int lnsul LAUNDRY
4.1 6
0 8
0
48.0 ft'
0
0
0.4
0
13 NE=>SW Exterior Concrete Block -Inl lnsuGREAT/DINT
4.1 26
0 8
0
208.0 ft'
0
0-
0.4
0
14 NW=>SE Exterior Concrete Block- Int lnsuGREATIDINI
4.1 20
0 8
0
160.0 ft'
0
0
0.4
0
1/8120204:18 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition(2017)Compliant Software . Page 3of5
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
WALLS
Adjacent
Space .Cavity WidthA. ' Height Sheathing Framing Solar Below
15 N=>S Garage Frame -Wood
KITCHEN 11 24 8 192:0 ft-
0.23 0.4
0
DOORS
# Ornt
DoorType
Space Storms U-Value Width
Ft In
Height
Ft In
Area
1 SE=>NW
Insulated
ENTRY None .39 3 1
6 8 _
20.6 ft'
WINDOWS
Odenlatiorshown is the entered orientation => changed to Worst Case.
Wall
# Omt ID Frame
Panes
I Overhang
NFRC U-Factor SHGC Imp Area Depth Separation
IntShade
Screening
1 NW=>SE 3 Metal
_ 2. SW=>NE:4 Metal
3 SE=>,NW 7 Metal
_ 4 NE=>SW13 Metal
5—NW=>SE14 Metal
Low-ESingle
Low-ESingle
Low-ESingle
Low-ESingle
Low-ESingle
Yes 1.04 0.29 Y 32.9 ft' 1 ft 0 in 1 ft 5 in
Yes 1.04 0.29 Y 6.9 ft' 1 ft 0 in 1 ft 5 in
Yes 1.04 8:29 Y 24.0 ft' 6 ft 0 in 1 It 5 in
Yes 1.04 0.29 Y 37.5 ft- 1ft0in 1ft51n
Yes 1.11 0.27 Y 40.0I 8ft01n 1ft5In
Drapes/blinds.
None
None
None
Drapes/blinds
Extedor5
None
None
None
Exledor5.
GARAGE
# FlcorArea
CeilingArea Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation
1 31511'
315.ft' 24ft 8ft
11
INFILTRATION,
# Scope Method
SLA CFM 50 ELA EgLA ACH ACH 50
1 ' Wholehouse ProposedACH(50)
.000356 1349.6 74.09 139.34 .1233
7
HEATING SYSTEM
# System Type
Subtype . Speed Efficiency Capacity
Block
Ducts
1 Electric Heat Pump/
Split Single HSPF:8.5 34.8 kBtu/hr
1
sys#1
COOLING SYSTEM
# System Type
Subtype Subtype Efficiency Capacity Alr Flow
SHR Block
Duds
1 CentralUnitt
Split Single SEER:15 34.8 kBtulhr , rim
0:8 1
sys#1
HOT'WATER SYSTEM
# System Type
SubTpe
Location EF _ Cap Use SetPnt
Conservation
1 Electric -None
Garage 0.97 40gal - 60.9gal 120deg
None
1/8/20204:18 PM EnergyGauge®USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition(2017) Compliant Software Page'4 of
FORM R405-2017 INPUT SUMMARY CHECKLIST REPORT
SOLAR HOT WATER SYSTEM
FSEC
Collector , Storage
Cart # CompanyName
System Model#
CollectorModel#
Area Volume
FEF
None None
ft2
DUCTS
/ —Supply--
—Return—
Air
CFM 25 CFM25
HVAC#
V # .Location R-Value Area
Location
Area
LeakageType
Handler
TOT OUT ON RLF
Heat Cool
1 Attic
6 175 ft2
Attic
66ft2
Defaulti-eakage
Attic
(Default) c(Default) c
1 1
TEMPERATURES
Programabl[er)TC')hermostat:Jan Y
Crlelling Fans:Cooling
ftFebrrXX''t1
rr
frfr
f`f`
ftX
Aug
t0(
r
Sep Oct HNov
Dec
Venting [ ]Jan [ ]ov
Feb
[X]ct
Mar
Apr
[
Maymay
[x�Jun
[X�JuI
[
[
Dec
ThermostatSchedule: HERS 2006 Reference
Hours
ScheduleType
1
2
3
4
5
6
7
8
9 10
11
12
Cooling IWO) AM
78
78
78
78
78
78
78
78
80 80
80
80
PM
80
80
78
78
78
78
78
78
78 78
78
78
Cooling(WEH) AM
78
78
78
78
78
78
78
78
78 78
78
78
PM
78
78
78
78
78
78
78
78
78 78
'78
78
Heating IWO) AM
66
66
66
66
66
68
68
68
68 68
68
68
PM
68
68
68
68
68
68
68
68
68 68
66
66
Heating(WEH) AM
66
66
66
66
66
68
68
68
68 68
68
68
PM
68
68
68
68
68
68
68
68
68 68
66
66
MASS
Mass Type
Area
Thickness
FumitureFraction
Space
Default(8lbs/sq.ft.
0 ft2
0 ft
0.3
BEDROOM
Default(8lbs/sq.ft.
112
ft
0.3-
WIC
Default(8lbs/sq.ft.
ft2
ft
0.3
M. BATH
Default(8lbs/sq.ft.
ft2
ft
0.3
KITCHEN
Default(8 lbs/sq.fL
ft2
ft
0.3.
BATH
Defaull(8lbs/sq.ft.
ft2
ft
0.3
BEDROOM 2
Default(8lbs/sq.ft.
ft2
ft
0.3
ENTRY
Oefault(8lbs/sq.fL
ft2
ft
0.3
LAUNDRY
Default 8lbs/s .fL
ft2
ft
0.3
GREATIDINING
1/8/2020 4:18 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 5 of 5
2017 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: WYNNE THE GRAND CARLTON IMPACT Builder Name: WYNNE BUILDING COPR.
Street: Permit Office: ST. LUCIE COUNTY
- City, State, Zip: FT. PIERCE, FL, Permit Number:
Y
U
Owner: WYNNE BUILDING CROP Jurisdiction: ST. LUCIE COUNTY
w
x
Design Location: FL, Fort Pierce
�
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
The exterior thermal envelope contains a continuous air barrier,
not be used as a sealing material.
requirements
Breaks or joints in the air barrier shall be sealed.,
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within comers and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum.
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
I
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be Installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity Insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth In unvenled crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to _the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
3s.
Recessed lighting
Recessed light fixtures Installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the drywall.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around wiring
and plumbing in exterior walls, or insulation that on
Installation readily conforms to available space shall
extend behind nin'na an wirina
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC register boots that penetrate building thermal envelope shall
be sealed to the sub -floor or drywall.
Concealed
When required to be sealed, concealed fire sprinklers shall only be
J
sprinklers
sealedin a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
between fire snrinklpr cover nlates and walls or ceilinas,
a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400.
1/8/2020 4:19 PM EnergyGauge® USA 6.0.02 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1
2017 EPL DISPLAY CARD
ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 99
The lower the Energy Performance Index, the more efficient the home.
1. New home or, addition
1. New (From Plans)
12. Ducts, location & insulation level
a) Supply ducts R
6.0
2. Single-family or multiple -family
2. Single-family
b) Return ducts R
6.0
c) AHU location
Attic
3. No. of units (if multiple -family) .
3.
1
4. Number of bedrooms
4.
2
13. Cooling system: Capacity
34.8
a) Split system SEER
15.0
5. Is this a worst case? (yes/no)
5.
Yes
b) Single package SEER
c) Ground/water source SEERICOP
6. Conditioned floor area (sq. ft.)
6.
1446
d) Room unitIPTAC EER
e) Other
7. Windows, type and area
a) U-factor.(weighted-average)
7a.
1.060
b) Solar Heat Gain Coefficient (SHGC)
7b.
0.284
14. Heating system: Capacity
34.8
c) Area
7c.
141.3
a) Split system heat pump HSPF
8.5
b) Single package heat pump HSPF
8. Skylights
c) Electric resistance COP
a) U-factor:(weighted average)
8a.
NA
d) Gas furnace, natural gas AFUE
b) Solar Heat Gain Coefficient (SHGC)
81b.
NA
e) Gas furnace, LPG AFUE
f) Other
9. Floor type, insulation level:
a) Slab -on -grade (R-value)
9a.
0.0
b) Wood, raised (R-value)
9b.
15. Water heating system
c) Concrete, raised (R-value)
9c.
a) Electric resistance EF
0.97
b) Gas fired, natural gas EF
10. Wall type and insulation:
c) Gas fired, LPG EF
A. Exterior:
d) Solar system with tank EF
1. Wood frame,(Insulation R-value)
10A1.
e) Dedicated heat pump with tank EF_
2. Masonry (Insulation R-value)
10A2.
4.1
f) Heat recovery unit HeatRec%*
B. Adjacent:
g) Other
1. Wood frame (Insulation R-value)
10131.
11.0
2. Masonry (Insulation R-value)
10B2.
16. HVAC credits claimed (Performance Method)
11. Ceiling type and insulation level a) Ceiling fans
a) Under attic 11 a. 30.0 b) Cross ventilation No
b) Single assembly 11b. c) Whole house fan No
c) Knee walls/skylight walls lid. 19.0 d) Multizone cooling credit
d) Radiant barrier installed 11d. No e) Multizone heating credit
f) Programmable thermostat Yes
*Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
I certify that this home has complied with the Florida Building Code, Energy Conservation, through the above energy
saving features which will be installed (or exceeded) in this home before final inspection. Otherwise, a new EPL
display card will be completed based on installed code compliant features.
Builder Signature: Date: Z-A
Address of New Home: �1.4�^nI City/FL Zip: FT. PIERCE, Fl-
1/8/2020 4:19:34 PM EnergyGauge® USA 6.0.04 (Rev. 1) - FlaRes2017 FBC 6th Edition (2017) Compliant Software Page 1 of 1