Loading...
HomeMy WebLinkAboutCompaction Test11345 U.S. Highway 1 •Sebastian, FL. 329580 Orlando • 723 Progress Way *Sanford, FI.3277110 90�1•t ENGINEERING f A NDJESTING ASOIL COMPACTION REPORT STM D 1557 and ASTM D 6938 Mai ing �PO Box 78-1377 Sebastian, FL. 329780 hone: 772-589-07120 40C.A.# 5693 KSMengineering.net DATE TESTED: June 26 2020 KSM JOB #: PERMIT #: 2004-0447 NUC # CONTRACTOR: Carol Duygo Nuc Model: 411OVOCATI04: 5310 5uL� 0�rial� F ro t Pierc , FI rich ITEM TESTED: • Compacted Foundation Fill - 5' x 19' Addition off Lani TEST LOCATION *OF SAMPLE 1. South End ,2. North End • • • Ak S6 DescripTion: • B o�iu Gray Sa d 4 4 In Place Moisture: 5.6 Proctor Optimum 0 sture: 11.0% DEPTH PEN DRY _MAX. DRY _ READ DENSITY PROCTOR VALUE (P.C.F) 0" - 12" 50 106.4 110.2 • "• 50 105.9 1'* Proctor Max. Dry Density: P.C.F. 110.2 W@ Test Locations the ensity & • Penetromet(readings indicatei�ie • Degre of Co paction Meets Minimm ReTjirement *for Staked Foundation Respectfully Submitted: 202869-1d MH jo 630 MC-IDR-P 030630 PERCENT• COMPACTION 96.6% 96.1% 112.0 - I I• I •I• •W• • 1 • E I •I• I •I• I 1 •I••I••I• 1• T I 9 I *1• 1 Ole 1 110.0 �..-.�-..—.1.— -.. J..-..1.. P C j• 1 •.• 1 1 109.01..—..-4..�+..—... F i • • j•�, I, • I • •. •!• D 108.0 - R Y I I• I •I 107.0..-.;_.._.�.-..-r.-..�..-..T..--- • 80 •9 10 0110 12 •13• 14 • `````•�illre 10 �. . • '�' i. Disc a'-1aimer: Con rac or isY responsi e o main ain the tested area in the condition that KSM .n completed the indicated passed compaction test. OF j KSM is not responsible if the tested area has been altered from the approved inspected condition V.P. of Engineering • _ •PE # 81439 6/29/2020 *Email to: StTucie Bui ing epartment; c uygo ya oo.com Proudly Serving Florida since 1990