Loading...
HomeMy WebLinkAboutWind Load Calculation\�INIIY J ERD Table Deck Application Type Description Page 1A Wood New, Reroof (Tear -Off), Recover C Mechanically Attached Insulation, Bonded Roof Cover 5 1B Wood New, Reroof (Tear -Off), Recover C-2 Mechanically Attached Insulation, Plate -Bonded or Strip -Bonded Roof Cover 6 113 Wood New, Reroof (Tear -Off), Recover D Insulated, Mechanically Attached Roof Cover 6 2A Steel or Structural Concrete New, Reroof (Tear -Off), Recover B-1 Mechanically Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover 7-9 2B Steel or Structural Concrete New, Reroof (Tear -Off), Recover B-1 Mechanically Attached Base Insulation, Bonded Top Insulation, Hybrid System SO 2C Steel or Structural Concrete New, Reroof (Tear -Off) or Recover B-2 Mechanically Attached Thermal Barrier, Bonded Temp Roof, Bonded Insulation, Bonded Roof Cover 11-12 2D Steel or Structural Concrete New, Reroof (Tear -Off), Recover C-1 Mechanically Attached Insulation, Bonded Roof Cover 13-20 2E Steel or Structural Concrete New, Reroof (Tear -Off), Recover C-1 Mechanically Attached Insulation, Hybrid System 21 2F Steel or Structure[ Concrete New, Reroof (Tear -Oft), Recover C-2 Mechanically Attached Insulation, Plate-Bohded or Strip -Bonded Roof Cover 22 2G Steel or Structural Concrete New, Reroof (Tear -Off), Recover D Insulated, Mechanically Attached Roof Cover 23-24 3A Structural Concrete New, Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 25-31 3B Structural Concrete New, Reroof (Tear -Off) A-1 Bonded Insulation, Hybrid System 32 4A LWIC New, Reroof (Tear -Off) F LWC to Deck Bonded Roof Cover 33 4B LWIC New, Reroof (Tear -Off) F Vapor Barrier to Deck, LWC to Vapor Barrier, Bonded Roof Cover 33 SA Gypsum Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover 34 GA Various Recover A-1 Bonded Insulation, Bonded Roof Cover 35-36 6B Various Recover Over Existing Metal Roof C-2 Mech. Attached Insulation, Plate -Bonded Roof Cover 37 6C Various Recover Over Existing Metal Roof D Insulated, Mechanically Attached Roof Cover 38 6D Various Recover F Non -Insulated, Bonded Roof Cover 38 The following notes apply to the systems outlined herein: 1. The evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be In accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. 2. Unless otherwise noted, fasteners and stress plates for Insulation attachment shall be as follows. Fasteners shall be of sufficient length for the following engagements: D Wood Deck: UltraFast Fasteners or All Purpose Fasteners with UltraFast Metal Plates. Minimum'/. -Inch plywood penetration or minimum 1-Inch wood plank embedment. D Steel Deck: Ultral ast Fasteners or All Purpose Fasteners with UltmFast Metal Plates. Minimum is -Inch steel penetration, engage the top flute of the steel deck. D Structural Concrete: All Purpose Fasteners with UltraFast Metal Plates or Structural Concrete Fasteners with UltmFast Metal Plates (flat bottom only). Minimum 1-inch embedment. Fasteners Installed with a pilot hole in accordance with the fastener manufacturers published installation instructions. 3. Unless otherwise noted, insulation may be any one layer or combination of po[yisocyanurate, polystyrene, wood fiberboard, perlite or gypsum -based coverboard that meets the QA requirements of F.A.C. Rule 61G20- 3 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when installed with the roof cover. 4. Minimum 200 psi, minimum 2-Inch thick lightweight insulating concrete may be substituted for rigid insulation board for System Type D (mechanically attached membrane), whereby the membrane fasteners are Installed through the LWIC to engage the structural steel or concrete deck. The structural deck shall be of equal or greater configuration to the steel and concrete deck listings. Roof decks and structural members shall be In accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation. S. Preliminary Insulation attachment for5ystem Type D= Minimum fourfasteners per 4 x 8 ft board or minimum two fasteners per4 x4 ft board. Exterior Research and Design, U.C. d/b/a Trinity l ERD Evaluation Report J9340.30.08-R8 for FU1475-RB Certificate of Authorization #9503 61M EDITION (2017) FBC NON-HVHZ EVALUATION Revision 8: 10/14/2017 Prepared by: Robert Nieminen, PE-59166 JM TPO Single Ply Roof Systems; (303) 978-4879 Appendix 1, Page 1 of 38 `,,�TRINITY I ERD 6. Unless otherwise noted, insulation adhesive application rates are as follows. Ribbon or bead width is at the time of application; the ribbons/beads shall expand as noted in the manufacturer's published instructions: ➢ Hot asphalt [HA]: .Full coverage at 25 Ibs/sq. D JM MBR Bonding Adhesive [MBR-BA] Continuous 0.75-Inch ribbons,12-inch o.c. D JM One -Step Foamable Adhesive [JM-OSFA]: Continuous 0.75-Inch ribbons,12-inch o.c. D 1M Roofing System Urethane Adhesive (JM-RSUA): Continuous 0.5 to 0.75-inch wide ribbons, 12-inch o.c. D 1M Two -Part Urethane Insulation Adhesive[UTA-TWO-PART]: Continuous 0.75-Inch ribbons, 12-inch o.c.JM Green Two -Part Urethane Insulation Adhesive maybe usedwhere UTA-TWO-PARTlsreferenced. D ICP Adhesives CR-20 [CR-20]: Continuous 2Y, to 3%-inch ribbons, 12-inch o.c. ➢ Note: When multiple layers(s) of insulation and/or coverboard are installed in ribbon-applfed adhesive, board Joints shall be staggered. ➢ Note: The maximum edge distoncefrom the adhesive ribbon to the edge of the insulation board shall be not less than one-half the specified ribbons spacing 7. Unless otherwise noted, all Insulations are Flat stock or taper board of the minimum thickness noted. Tapered polytsocyanurete at the following thickness limitations may be substituted with the following Maximum Design Pressure (MDP) limitations. In no case shall these values be used to 'increase' the MOP listings in the tables; rather if MOP listing below meets or exceeds that listed for a particular system in the tables, then the thinner board listed below may be used as a drop -in for the equivalent thicker material listed in the table: D JM One -Step Foamable Adhesive [JM-OSFA]: MDP: -157.5 psf (Min. 0.5-inch thick) D JM Roofing System Urethane Adhesive (1M RSUA): MOP -157.5 psf (Min. 0.5-Inch thick) D JM Two -Part Urethane Insulation Adhesive[UTA-TWO-PART]: MDP:-315.Opsf (MIn.0.5-Inch thick ENRGY 3 orJM ISO 3) ICP Adhesives CR-20 [CR-20]: MOP: -117.5 psi (Min. 1.G-Inch thick) 8. Bonded polyisocyanurete insulation boards shall be maximum 4 x4 ft. 9. For mechanically attached components or partially bonded insulation, the maximum design pressure for the selected assembly shall meet or exceed the Zone 1 design pressure determined In accordance with FBC Chapter 16, and Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WDl, FM Loss Prevention Data Sheet 1-29, Roofing Application Standard RAS 117 and RAS 137. Assemblies marked with an asterisk- carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29 (January 2016) for Zone 2/3 enhancements. 10. For assemblies with all components fully bonded in place, the maximum design pressure forthe selected assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16, and no rational analysts is permitted. 11. For mechanically attached components over existing decks, fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing shall be in accordance with ANSI/SPRI FX-1 orTesting Application Standard TAS 105. 12. For existing substrates in a bonded recover or re -roof installation, the existing roof surface or existing roof deck shall be examined for compatibility and bond performance with the selected adhesive, and the existing roof system (for recover) shall be capable of resisting project design pressures on Its own merit to the satisfaction of the Authority Having Jurisdiction, as documented through field uplift testing in amordance with ANSI/SPRI IA-1, ASTM E907, FM Loss Prevention Data Sheet 1-52 orTesting Application Standard TAS 124. 13. For System Type D, steel deck applications, the roof membrane shall be run with its length perpendicularto the steel deck Flutes. 14. For Recover Applications using System Type D, the Insulation is optional. Alternatively, Invinsa Roof Board, DensDeck, DensDeck Prime, DEXCell FA Glass Mat Roof Board or SECUROCK Gypsum -Fiber Roof Board may be used as a separator board, preliminarily attached prior to roof cover Installation. The existing roof system shall be suitable for a recover application. 15. LWIC shall be cast In accordance with FBC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWIC Is referenced, refer to current LWIC Product Approval for specific deck construction and limitations. For systems where specific LWIC is not referenced, the minimum design mix shall be 300 psi. In all cases, the minimum top -coat thickness Is 2-Inches. For LWIC over structural concrete, reference Is made to FBC Section 1917.4.1, Point 1. Exterior Research and Design, U.C. d/b/a Trinity I ERD Evaluation Report J9340.10.08-RB for FL31475-RS Certificate ofAuthoritation d9503 6'" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 8: 10/14/2017 Prepared by: Robert Nieminen, PE-59166 JM TPO Single Ply Roof Systems; (303) 978-4879 Appendix 1, Page 2 of 38 -,JTRINITY ERD 16. For adhered membrane systems, side laps shall be minimum 2-Inch wide sealed with min. 1.5-inch heat weld. Adhesive application rates areas follows: ... ,.... .. ADHESNEAPPNGTION RATES ,. Membrane Adhesive Method Rate JM TPO JM TPO Membrane Adhesive(Solvent Based)[1M TPO MA-SB] Contact (both sides) 1.67 gal/square(% applied to substrate and 35 applied to membrane) JM TPO JM TPO Membrane Adhesive (Low VOC)[1M TPO MA-LVOC] Contact (both sides) 1.67 gal/square(% applied to substrate and% applied to membrane) JM TPO JM TPO Low VOC Membrane Adhesive [JM TPO Low-VOC MA] Contact (both sides) 1.1 gal/square(% applied to substrate and% applied to membrane) 1M TPO JM TPO LVOC Membrane Adhesive [JM TPO LVOC MA] Contact (both sides) 1.1 gal/square(% applied to substrate and% applied to membrane) ENRGY 3 & other polyisocyanurate: 1.1 gal/square (%applied to substrate and %applied to JM TPO 1M Membrane Bonding Adhesive (TPO & EPDM) [JM MBA Contact (both sides) membrane) (TPO&EPDM)] Invinsa Roof Board, Dens Deck Prime &SECUROCK Gypsum Fiber Roof Board: 1.67 gal/square (% applied to substrate and %applied to membrane) JM TPO TACC FA-141 Contact (both sides) 1.67 gal/square(% applied to substrate and% applied to membrane) JM TPO JM TPO Membrane Adhesive (Water Based)[JM TPO MA-WB] Wet lay (substrate) 0.03 to 1gal/square Invinsa Roof Board: 0.56-0.71 gal/square 1M TPO JM TPO Water Based Membrane Adhesive[JM TPO WBMA] Contact (both sides) SECUROCK Gypsum -Fiber Roof Board: 0.59-0.77 gal/square ENRGY 3, ValuTherm: 0.63 —0.93 gal/square JM TPO FB 100, 115 or 135 JM TPO Membrane Adhesive (Water Based)[JM TPO MA-WB] Wet lay (substrate) 0.83 to Sgal/square Invinsa Roof Board: 0.56-0.71 gal/square JM TPO FB 100, 115 or 135 JM TPO Water Based Membrane Adhesive [JM TPO WBMA] Wet lay (substrate) SECUROCK Gypsum -Fiber Roof Board: 0.59-0.77 gal/square ENRGY 3, ValuTherm: 0.63 —0.83 gal/square JM TPO FB 100, 115 or 135 JM Roofing System Urethane Adhesive(1M-RSUA) Wet lay (substrate) 0.5 to 0.75-Inch wide ribbons spaced as noted in tables herein. JM TPO FB 100, 115 or 135 JM Single Ply Two Part Urethane Insulation Adhesive (JM-SP- UTA-TWO-PART) Wet lay (substrate) 0.5 to 0.75-Inch wide ribbons spaced as noted in tables herein. JM TPO FB 150 or 17S Hot asphalt Wet lay (substrate) Hot asphalt at 20 lbs/square. 17. For Hybrid Systems, consisting of JM TPO FB 150 or 175 applied In hot -asphalt full -mop over modified bitumen base ply(s), the following base ply references apply. JOHNSMANVILLEBASE/PLYSHEErsHffiusEim HYBRIDJMTP0FB1500R175APPIJGTI0N5 _- Reference Layer I Material Application BP -AA (Base and Ply sheets, Asphalt -Applied) Base Ply One armore GlasBase Plus, PermaPly 28 One or more GlasPly IV, GlasPly Premier, GlasBase Plus, PermaPly 28 Hot asphalt at 20-40lbs/square SBS-AA(SBS, Asphalt -Applied) Base/Ply: One or more DynaPIy TI,DynaBase, DynaBase XT, DynaBase PR, DynaLastic 180 S, DynaLastic 250 S, DynaLastic 250 Fit S Hot asphalt at 20-40lbs/s uare SBS-TA (SBS, Torch -Applied) Base / Ply: One or more DynaBase HW, DynaWeld Base, DynaWeld 180 S Torch -Applied Exterior Research and Design, U.C. d/b/a Trinity I ERD Evaluation Report J9340.30.08-RB for FU1475-RS Certificate ofAuthorization R9503 6r" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 8:10/14/2017 Prepared by: Robert Nieminen, PE-59166 JM TPO Single Ply Roof Systems, (303) 978-4879 Appendix 1, Page 3 of 38 \�INITY ERD 18. Modified bitumen vapor barrier options for use over structural concrete deck followed by adhered insulation applied as follows carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs. those in Table 3A applies: ... VAPOR BARRIM OPWNS;STRUCTURAIL CONCRETE DECK; FOLLOWED BYADHERED INSULATION PERTABLE 3J: •. . ., Option# Primer Vapor Barrier Insulation Adhesive MDP(psf) I ASTM D41 Two plies GlasPIy IV, GIasPly Premier In hot asphalt JM Roofing System Urethane Adhesive -I80.0 (RSUA), 12-inch o.c. 2 ASTM D41 Two plies GlasPIy IV, GIasPly Premier In hot asphalt JM One -Step Foamable Adhesive(OSFA), 12- -280.0 inch o.c. 3 ASTM D41 DynaPly TS, DynaBase, DynaBase)Cr, DynaBase PR, DynaLastic 180 S, DynaLastic 250 S, DynaLastic 250 FRS in hat asphalt JM One -Step Foamable Adhesive (OSFA),12- -160.0 or DynaBase HW, DynaWeld Base, DynaWeld 1805 torch -applied Inch o.c. 4 JM SA Primer Low JM Vapor Barrier SA, self -adhered JM Two -Part Urethane Insulation Adhesive _2775 V0C (UTA-2), 12-Inch o.c. 5 JM SA Primer Low JM Vapor Barrier SA, self -adhered JM Roofing System Urethane Adhesive 2775 VOC(RSUA), 12-Inch o.c. 6 ASTM D41 DynaPlyT1,DynaBase, DynaBase Xr, DynaBase PR, DynaLastic 180 S, DynaLastic 2505, Dynalastic 250 FR S in hot asphalt JM Two -Part Urethane Insulation Adhesive -277.5 or DynaBase HW, DynaVield Base, DynaWeld 1805 torch -applied (UTA-2),12-Inch o.c. 7 ASTM D41 DynaPlyT1,DynaBase, DynaBase XT, DynaBase PR, DynaLastIc 1805, DynaLastic 2505, DynaLastic 250 FIR Sin hot asphalt JM Roofing System Urethane Adhesive 2775 (RSUA), 12-inch a.c. 8 ASTM D41 DynaBase HW, DynaWeld Base, DynaWeld 180 S Larch -applied JM Roofing System Urethane Adhesive 7925 (RSUA), 12-inch o.c. 19. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads. Exterior Research and Design, U.C. d/b/a Trinity I ERD Evaluation Report J9340.10.08-RB for FL11475-RS Certificate of Authorization #9503 bra EDITION (2017) FBC NON-HVHZ EVALUATION Revision 8: 10/14/2017 Prepared by: Robert Nleminen, PE-59166 1M TPO Single Ply Roof Systems; (303) 978-4879 Appendix 1, Page 4 of 38 TABLE2E: STEELORSTRUCTURAL CONCRETE DECKS- NEWCONSTRUCIION, REROOF(TEAR-0FF)OR RECOVER y - - r SYSTEM TYPED: INSULATED, MECHANICALLY ATTACHED ROOF COVER ` System Deck 1) Insulation Roof Cover NI No. (Note Type Attach Membrane Fasteners Attach (Psf) - Sy6Tm OVE11MIN.GR E33ST DEa ORSTRUCNRILLCONLJIETE(ASNOTD]) Min. 22 ga., type B, Grade One or more Prelim. 1M TPO 45, 60, 72 of 80 High Load Fasteners (steel or concrete) or1M Structural 12-inch o.c. within 6-inch wide laps spaced SC-126 33 steel or min. 3,000 psi layers, any attached (8ftsheet) Concrete Deck Fasteners (concrete only) with High Load 90.inch o.c. Laps sealed with 1.5-inch heat -30.0 structural concrete combination Plates weld outside lap Min. 22 ga., type B, Grade One or more Prelim. T 60,72 or 80 High Load Fasteners (steel or concrete) or JM Structural 12-inch o.c, within 6-inch wide laps spaced SC-327 33 steel or min. 3,000 psi layers, any attached (10 ftsheetsheet) (1 Concrete Deck Fasteners (concrete only) with High Load 114-inch o.c, laps sealed with 1.5-inch heat -30.0 structural concrete combination Plates weld outside lap Min. 22 ga., type B, Grade One or more Prelim. JM TPO 45,60,72 or 80 Extra High Load Fasteners (steel only) or JM Structural 12-inch o.c. within 6-Inch wide laps spaced SC-128 33 steel or min. 3,000 psi layers, any attached (10 ft sheet) Concrete Deck Fasteners .(concrete only) with Extra High 114inch o.c. laps sealed with 1.54nch heat -37.5 structural concrete combination Load Plates weld outside lap Min. 22 ga., type B, Grade One or more prelim. JM TPO 456072 or80 Extra High Load Fasteners (steel only) or JM Structural 12-inch o.c. within 6-inch wide laps spaced SC-129 33 steel or min. 3,000 psi layers any attached , ,, (8ftsheet) Concrete Deck Fasteners (concrete only) with Extra High 90.inch o.c. Laps sealed with 1.5-inch heat A5.0 structural concrete combination Load Plates weld outside lap Min. 22 ga., type B, Grade One or more prelim. 1M TPO 45, 60, 72 or 80 High Load Fasteners (steel or concrete) or JM Structural 6-inch o.c. within 64nch wide laps spaced SC-130 33 steel or min. 3,000 psi layers, any attached (10ftsheet) Concrete Deck Fasteners (concrete only) with High Load 1144nch o.c. Laps sealed with 1.5-inch heat -45.0 structuralconcrete combination Plates weld outside lap Min. 22 ga, type B, Grade One or more prelim: JM TP0456072 or 80 Extra High Load Fasteners (steel only) or JM Structural 6-inch o.c within 6-Inch wide laps spaced SC-131 33 steel or min. 3,000 psi layers, any attached , , (10 It sheet) Concrete Deck Fasteners (concrete only) wlth Extra High 114-Inch o.c. Laps sealed with 1.5-inch heat -52.5 structural concrete combination Load Plates weld outside lap Min. 22 ga., type B, Grade One or more Prelim. 1M 60, 72 or 80 High Load Fasteners (steel or concrete) or JM Structural 6-Inch o.c. within 6-inch wide laps spaced SC-132 33 steel or min. 2,500 psi layers, any attached (8ftsheet) et) t sheet) Concrete Deck Fasteners (concrete only) with High Load 90.inch o.c. Laps sealed with 1.5-inch heat -60.0 structural concrete combination Plates weld outside lap Min. 22 ga., type B, Grade One or more Prelim. JM TPO 60,72 or 80 Extra High Load Fasteners (steel only) or JM Structural 6-inch o.c within 6-inch wide laps spaced SC-133 33 steel or min. 3,000 psi layers, any attached (B ft sheet) et) Concrete Deck Fasteners (concrete only) with Extra High 90-inch o.c. laps sealed with 1.5-inch heat -75.0 structural concrete combination Load Plates weld outside lap Min. 22 ga., type B, Grade One or more Prelim. JM TPO 45, 60, 72 or 80 High Load Fasteners (steel or concrete) or JM Structural 6-lnch o.c. within 6-inch wide laps spaced SC-134 33 steel or min. 3,000 psi layers, any attached (5 ft sheet) Concrete Deck Fasteners (concrete only) with High Load 54inch o.c. Laps sealed with 1.5-Inch heat -97.5 structural concrete combination Plates weld outside lap SrsiEMS OVER MIN. GRwE605TEELDECKORSTiiUCNR1ILWXOIEfE (AS NOTE)) Min. 22 ga., type B, Grade One or more Prelim. JMTP045,72or8060, High Load Fasteners (steel or concrete) or JM Structural 12-inch o.c. within &inch wide laps spaced SC-135 60 steel or min. 3,000 psi layers, any attached (10 ft sheet) Concrete Deck Fasteners (concrete only) with OMG 2- 1141nch o.c. Laps sealed with 1.5-Inch heat -weld -30.0 structural concrete combination 3/4" Super XHD Barbed Plates outside lap Min. 22 ga., type B, Grade One or more Prelim. 72 or 80 60 JM TPO 45, High Load Fasteners (steel or concrete) or JM Structural 12-inch o.c. within 64nch wide laps spaced SC-136 60 steel or min. 3,000 psi layers, any attached , (8ftsheet) Concrete Deck Fasteners (concrete only) with OMG 2- 90.inch o.c. Laps sealed with 1.5-inch heat -37.5 structural concrete combination 3/4" Super XHD Barbed Plates weld outside lap Min. 22 ga, type B, Grade One or more Prelim. TPO 45, 60,72 or 80 High Load Fasteners (steel or concrete) or 1M Structural &inch o.c within 6-Inch wide laps spaced SC-137 60 steel or min. 3,000 psi layers, any attached (SOftsheet) (1 Concrete Deck Fasteners (concrete only) with High Load 114Inch o.c. Laps sealed with 1.5-inch heat -60.0 structural concrete combination Plates weld outside lap Exterior Research and Design, U.C. d/b/a Trinity H ERD Evaluation Report 19340.10.08-R8 for FL11475-118 Certificate of Authorization M03 bra EDITION (2017) FBC NON-HVHZ EVALUATION Revision 8: 10/14/2017 Prepared by: Robert Nieminen, PE-59166 JM TPO Single Ply Roof Systems; (303) 978-4879 Appendix 1, Page 23 of 38