HomeMy WebLinkAboutDrawingEXISTING BOND BEAM. THIS IS
AN ILLUSTRATION. SIZE AND
LOCATION MAY BE
DIFFERENENT.
ENSURE EXISTING LINTEL IS
PRESENT SHORE AND PROTECT ANY
EXISTING STRUCTURE
ABOVE OPENING DURING
DEMOLITION AND
CONSTRUCTION, INCLUDING
CMU ABOVE OPENING.
EXISTING OPENINGEXISTING OPENINGPROPOSED OPENINGENSURE EXISTING GROUTED
CELLS ARE PRESENT ON BOTH
SIDES OF OPENING
REMOVE BLOCKS BELOW
WINDOW. SAWCUT SILL AND
BLOCKS AS NECESSARY.
PROTECT ADJACENT
VERTICAL GROUTED CELLS
Edward Roske, PE
PE # 72228
Date:
SHEET
REVISIONS
SCALESEASIDE ENGINEERSCertificate of Authorization 320484265 60th CourtVero Beach, Florida 32967 www.seasideengineers.com - (772) 202-8008 - info@seasideengineers.comA-1Farrow ConstructionSchmitt Residence9504 Poinciana CourtFort Pierce, FloridaN.T.S.
06/19/20