Loading...
HomeMy WebLinkAboutEstimate & Invoice4• ESTIMATE ® Best Western Port St. Lucie �"1 Precision Control MR1 ,- 6rellence in Water Quality Control w® Order # 167955 since 1993 Date 02/20/20 Consultant Adrienne Cooper WQA Alex W Branning Fax # Billing Terms Credit Card Proposed To Ship To Steve Rodriguez Best Western Port St Lucie Best Western Port St. Lucie 7900 US1 7900 USt Port Saint Lucie, FL 34952 Port Saint Lucie, FL 34952 Phone: (772) 878-7600 Fax: Courier Service FedEx Ground Order Line Item Code Description Quantity Unit Price Item Total ... .... ------ —_ _.._........_ ........ ---'.------ ._..:1.__ - ......... 1. ...-----__ .. -. __. ............... _.:.. -- CJ MR1 CES Precision Control, MR1, ORP/pH Package 1 2,314.30 2,314.30 CES Precision Control, MR1, ORP/pH Package High Resolution Control of Oxidant and pH levels Demand Based Proportional Feed and Failsafe Circuits PH Interlock of Oxidant Feed for Failsafe and Protection Auxilary 3rd relay for probe clean, dual pH, or DSBM booster mode, or alarm Probe Cell Assembly with acrylic mounting plate In -line Reed Flowswitch for added safety 1 Factory 2-year Factory Electronics Warranty JB 736-2633 Enclosure Hinged, pear Cover, 19 x 15 x 7 (Hodzontal 1 Mount) Enclosure Hinged, Clear Cover, 19 x 15 x 7 For Horizontally Mounted Control Systems such as CES Precision Control MR1, MR2, BECSys2, or BECSys3. Required on outdoor installations, optional on indoor pump rooms. DRILL Enclosure Venting 1 CB Start -Up Manual CES Treatment Package Start Up Manual 1 CES Treatment Package Start Up Manual Includes: Equipment Manuals, Start up & Warranty Paperwork, MSDS sheets for all major chemicals & test kit reagents, Laminated instruction charts, Chemical Dosage Chart, Personalized log sheets, Operations & maintenance sheet and Pool Chemistry Dosing Calculator. Delivered to and mvlewed with owner's rep by CES Start-up Technician. CB ISU Installation, kss electric 1 Installation and Factory Start-up of treatment equipment Includes parts and labor for installation. Electrical work permits (if applicable) by others Includes final review, CES training manual, full system and maintenance training per CES Operator Training Checklist and cn-she Warranty Administration. One year warranty on all installation workmanship. Building Department Permits are Not Included and, if specified as being provided, will be charged as an additional cost go le) ® ®It Commercial Energy Specialists - 952 Jupiter Park Lane • Suite 1 - Jupiter, FL 33458. PH 800-940-1557 - F 561-746-5898 - www.CESWaterQuality.com Page 1 of 2 owe Excellence m Waler(luatltyCoMrol Since IM Bill To Best Western Port St. Lucie 7900 S US Hwy 1 Port Saint Lucie, FL 34952 Items Line Item Code Description INVOICE Best Western Port SL Lucie Pmclsion Control MR1 Invoice # 149869 Date 03/03/20 Billing Terms Credit Card Date Due 03/03/20 Order# 167955 Ordered By Steve Rodriguez Customer PO # Signed Omer Ship To Best Western Port St Lucie 7900 S US Hwy 1 Port Saint Lucie, FL 34952 CJ MR1 CES Precision Control, MR1, ORP/pH Package JB 736-2633 Enclosure Hinged, Clear Cover, 19 x 15 x 7 (Horizontal Mount) ❑RILL Enclosure Venting CB Start -lip CES Treatment Package Start Up Manual CB ISU Installation, less electric , Additional Information Shipping is Estimated Electric is not included Site to use existing feeders FedEx Ground Tracking Number. 119073415354409 3/5/2020 Visa ...9699 (01123) 063155 City Unit Price t 1,998.00 1 224.63 - 1 91.67 1 0.00 1 0.00 2,520.59 Total _.._-1,998.00 224.63 -----91.67 0.00 0.00 Subtotal 2,314.30 Adjustment 0.00 Total 2,314.30 Shipping 44.28 Tax 162.01 Grand Total 2,520.59 Balance 0.00 ®� Commercial Energy Specialists • 952 Jupiter Park Lane • Suite 1 •Jupiter, FL 33458 • PH 800-940-1557 -F 561-746-5898 • www.CESWaterQuaihycom Page 1 of 1