Loading...
HomeMy WebLinkAboutTermite Cert• Termite Inspection 5,j • Termite Pretreatment • Pest Control • Rodent Service • Fire Ant Lawn Service • Whitefly Treatment rist is Lard 772-323,-7921 f -A -Bug tell Frio: 1-811 315-9999 Pest ite & Fax: 712-348-5990 Control, Email: Evictabug@gmail.com Inc. 4293 SW High Meadows Ave. • Licensed & Insured Lic. JB175775 Palm City, FL 34990 Notice of Preventative Treatment for Termites (as required by Florida Building Code (FBC) 104.2.6, 105.10 & R318.1 and Broward County Chapter FBC 105.2.2) PEST PREVENTION I FIRE ANT SERVICE I TERMITE SERVICE I RODENT EXCLUSION & REMOVAL I WHITEFLY TREATMENT DATE OF SERVICE �) (J --c I �' TIME ! DEVELOPMENT NAME (PROJECT) �'' `� CONTRACTOR'S NAME CONTACT PERSON r j J 'I �`. (11 STRUCTURE ADDRESS (LOT/BLOCK) CITY, STATE COUNTY NOTES zIF UOtiE TREATMENT TYPE/AREA r-0 _ELqATING ❑ MONOLITHIC ❑ PATIO ❑ BORA CARE TREATMENT ❑ POOL DECK ❑ CUTOUTS ❑ FOOTER ❑ FRONT ENTRY ❑ TAMP & TREAT �U YREAT ONLY ❑ FINAL PRODUCTS ❑ BASELINE DOMINION 2LACTIVE INGREDIENT ❑ OTHER ACTIVE INGREDIENT CONCENTRATION ❑ GARAGE ❑ DRIVEWAY ❑ RETREAT ❑ BORA CARE TREATMENT ❑ POOL DECK ❑ OTHER ❑ STEM WALL/FOOTERS ❑ ADDITION ❑ PLUMBING CUTOUTS ❑ SIDEWALKS ❑ TERMIDOR SC ❑ BORACARE ❑ PREMISE ❑ TALSTAR (P-IMIDACLAPRID ❑ BIFENTHRIN ❑ DISODIUM OCTABORATE TETRAHYDRATE L3.06% ❑ .1% ❑ .12% ❑ .25% 9405% ❑ 23% ❑ 9% ❑ OTHER SQUARE FOOTAGE 6) 61, LINEAR FOOTAGE SQUARE FOOTAGE VERIFIED ES ❑ NO �I-MEASURED OR VERIFIED PER PLANS GALLONSAPPLIED u JOB READY CONDITIONS MET e ❑ia ES_ ❑ NO DETAILS "Certificate of Compliance" As per 104.2.6, 105.10 & R318.1 FBC -If soil chemical barrier method for termite prevention is used. Final exterior treatment shall be completed prior to final building approval. Certificate of Compliance: The building has received a complete treatment for the prevention of subterranean termites. Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and Consumer Services. (Per the Florida Building Code.) If this notice is for the final exterior treatment, initial and date this line _. �.� FINAL STICKER ❑ ELECTRICAL PANEL ❑ WATER HEATER 0 OTHER Payment Terms: Payment due at time of service. Date Appiicator: (Evict ABug Termlteand Pest Control, Inc.) Date Customer (Property Owner or Agent) (rrly+ilutll{11y1U www.evictabugpestcontrol.com Planning & Development Services Building &Code Regulation Division 2300 Virginia Ave IF - Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT #: 2,203 6IVJOB ADDRESS: I w , BUILDER/CONTRACTOR: PEST CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PEST CONTROL LICENSE #: JB175775 We, the undersigned, hereby certify that we have pretreated the above described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet if area treated: Percentage of solution: .05% Date of Treatment: C.2� t/Footing lir Treatment Re -Treat Driveway 1St Treatment Re -Treat Other 1St Treatment Re -Treat Chemicals used: DOMINION 2L Total gallons used: Time of Trea t: Slab St Treatment Re -Treat Pools 1St Treatment Re -Treat P ri�meter f r Fin spection p .M�� of Wrminator Date Note: There must be a completed form for each required"treatmentidr re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. FBC 104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment if the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. Revised 7/24/2014