Loading...
HomeMy WebLinkAboutFiberglass Step Anchoring Guidelinesf i=iberglass Step ;Anchoring Guidelines l:oncrete Installation Ust of Components (P=17h sed Locally) i i c i4'1^.}i ]//F'�.•/-0k?3/4"F3C1CS 2t;Xh I/4"x20n I3/4''WN I 2exh 20)Cb 1/4.1 i 4ffd 11-V' Nies 14� L.Qmac 2 llF'Wasl Ao9ns Concrete Installation Guidefines I) Drill''/d' hole through step and bracket at desired position through lower wooden frame member. , 2) Install L-bracket's using %_" x 20 x 2'/<" Bolts, washers, and nuts. 3) Mark location o'J'hole in L bracket on the concrete. 4) Move the step away from the house. Drill holes in concrete at the desired locations. Tap in''/<" cone ete anchors. 5) Replace step so i hat. the tops of the concrete :anchors protrude through the L-brackets. Secure with the:iiuts and washers: Ground Installation. List of Components (2) 484154 Anchor Assemblies Each assembly Includes: (1) 15 inch Anchor (1) 3/8" x 1 '/a" lag screw (1) 7116" X 1 ''W' washer Ground Installation Guidelines I) Set step in desired position and mark the anchor placements on the ground, Remove step. 2) Screw the anchors in the ground so that the eye of the anchor will be in the position as. shown. 3) Replace step and mark the place where the hole in the eye of the anchor meets the side of the step at the height of the lower frame member. 4) Fasten screw into lower frame member thotlgh eye of the anchor and washer. WARNING: ]?allure to anchor the step properly can result in injury. Place the step against the hose. Make sure the surfaoe on which the step rests is level. Style Crest,•Ine. Drawer A Fremont, Ohio 43420 cow Deck and Rail Assembly Teat 92 - Setup REVIEWED FOR COIDE COMPLIANCE ST. lLUCIE COUNI'y BOCCC O1-37911.04 Page 6 of 6 Test Summary: Test 1- Dimension Verbcation: The deck structure met all of the listed code requirements for dimensional acceptance. Test 2 - Vertical Load (300 lb treadload over 4 sq. 110 The stair tread achieved the 2x design load as required by code agencies with a recovery of 93%. The stair tread also achieved the 2.5x design load as required by BOCA without structural failure. Photographs of the systems tested, and a copy of this report will be retained by An for a period of four -years, This report is the exclusive property of the client so named herein and is applicable only to the sample tested. Results obtained are tested values and do not constitute an opinion or endorsement by this laboratory or any of its representatives. This report may not be reproduced, except in full, without the approval of Architectural Testing, For ARCHITECTURAL TESTING, INC. ela�By SIgmO bc.bsoDh 6t Bdc'ma Joseph M. Brickner Technician B3�tlSrsaadrY•l�+drrCI:4 Joseph A. Reed, P.E. Director - Engineering and Product Testing JM .iadalb 01-379J1.04 t88R�r Sfamd hr• 6trrvea M Ih1eh Steven M. Urich, P.E. Senior Project Engineer