Loading...
HomeMy WebLinkAboutA-2 150 THOMPSON r1DRAWN CHECKED DATE SCALE JOB NO. SHEET OF 2 SHEETS5818 Lyda laneOrlando Fl. 32839407-816-9000General ContractorQualifer: Mark CrossLicense #: CGC1514240Electrical ContractorQualifer: Mark CrossLicense #: EC13001174REVISIONS BY ELECTRICALPLANINSTALL STANDBY GENERATORFORQUALIFER: MARK CROSS LICENSE # EC13001174 MC A-2 CONTRACTOR: CODE INFORMATION CONSTRUCTION TYPE: TYPE OCCUPANCY: SINGLE FAMILY RESIDENCE JURISDICTION: ST. LUCIE COUNTY APPLICABLE BUILDING CODES: •FLORIDA BUILDING CODE, SIXTH EDITION (2017) •FLORIDA ENERGY CODE, SIXTH EDITION (2017) •FLORIDA MECHANICAL CODE, SIXTH EDITION (2017) •FLORIDA PLUMBING CODE, SIXTH EDITION (2017) •EXISTING BLDG. FLORIDA BUILDING CODE, SIXTH EDITION (2017) •FLORIDA ACCESSIBILITY CODE, SIXTH EDITION (2017) •FLORIDA FIRE PREVENTION CODE, SIXTH EDITION •2014 NATIONAL ELECTRIC CODE •NFPA 101 LIFE SAFETY CODE, 2015 EDITION •2013 NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS NOTES: IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISH AND INSTALL ALL NECESSARY COMPONENTS FOR THE PROPER OPERATION OF ALL SPECIFIED SYSTEMS, REGARDLESS OF WHITHER THOSE COMPONENTS ARE SHOWN ON THE DRAWINGS OR NOT. CONTRACTOR SHALL ALSO VERIFY THAT SPECIFIED COMPONENTS ARE COMPATIBLE WITH OTHERS WITHIN THE SAME SYSTEM ANO WITH THE SYSTEM ITSELF. LEGAL DESCRIPTION: PORTOFINO SHORES-PHASE TWO- (PB 43-33) LOT 193 PARCEL ID #: 1312-502-0094-000-7 PROJECT NO.: G200108 DATE: 6-17-2020 MARCOPE, LLC 5818 LYDA LANE ORLANDO, FL. 32839 CGC1514240 EC13001174 GENERAL ELECIRICAL NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND OTHER APPLICABLE CODES AND STANDARDS. 2. THE CONTRACTOR SHALL SATISFACTORLIY REPAIR/REPLACE EQUIPMENT OR PART OF STRUCTURE DAMAGED AS A RESULT OF HIS WORK. 3. APPROVAL SHALL BE OBTAINED FROM THE ENGINEER PRIOR TO CUTTING OR DRILLING ANY STRUCTURAL SUPPORT MEMBER . 4. MINIMUM WIRE SIZE SHALL BE #12 THWN UNLESS OTHERWISE NOTED ON PLANS . 5. ALL CONDUCTORS SMALLER THAN #8 SHALL BE COPPER UNLESS OTHERWISE NOTED ON PLANS . 6. ALL EXPOSED CONDUCTORS SHALL BE RUN IN CONDUIT. 7. ALL MATERIALS SHALL BE U.L. APPROVED. 8. CONTRACTOR SHALL SEAL ALL FIRE RATED PENETRATIONS WITH A FIRE SEALANT EQUAL TO THE RATINGS OF THE PENETRATION. 9. RISERS ARE DIAGRAMATIC ONLY. THEY DO NOT SHOW EVERY BEND REQUIRED FOR THE INSTALLATION 10. THESE DRAWINGS ARE A GUIDE FOR THE INSTALLATION OF ELECTRICAL SERVICE. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE A FUNCTIONING SYSTEM. 11. ALL CABLES SHALL BE RUN WITHOUT SPLICES. EXCEPT AS OTHERWISE INDICATED. 12. ALL PULL AND JUNCTION BOXES SHALL BE ACCESSIBLE AT ALL TIMES. 13. EXACT POINT AND METHODS OF CONNECTIONS TO EQUIPMENT'S SHALL BE DETERMINED IN FIELD. 14. ALL WORK SHALL BE DONE IN A NEAT ANO WORKMANLIKE MANNER. ALL ELECTRICAL / PLUMBING / MECHANICAL EQUIPMENT SHALL BE ABOVE REQUIRED ELEVATI ON AS PER CHAPTER 11C-5(F)(4) GAS SHALL BE INSTALLED AT LEAST 1 0 FT FROM ANY EXTERNAL SOURCE OF IGNITION (e.g. ELECTRICAL EQUIPMENTS, A/C COMPRESSORS, ETC.) GENERATOR EXHAUST TERMINATION POINT SHALL FBC-R-M1602.2 GENERATOR PACKAGE UNIT OUTLINE SPECIFICATIONS THIS GENERATOR PACKAGE SHALL CONSIST OF A 120/240V, 22 KW, SINGLE PHASE, SOUND ATTENUATED, FULLY PACKAGED, GUARDIAN AIR-COOLED GAS ENGINE GENERATOR SET INCLUDE: BATTERY CHARGING ALTERNATOR MICROPROCESSOR CONTROL FACTORY LOADBANK TESTED 100A MAINLINE CIRCUIT BREAKER SOUND ATTENUATED, WEATHERPROOF ENCLOSURE, 59db @ 23 FEET COMPOSITE MOUNTING PAD UL 2200 LISTED NATURAL GAS OR LP GAS FUEL ELECTRONIC GOVERNOR ENCLOSED CRITICAL GRADE MUFFLER OUTLINE SPECIFICATIONS AUTOMATIC TRANSFER SWITCH 150A, TWO (2) POLES, 120/240 VOLTS, SINGLE PHASE, 22 KAIC. IN A NEMA 3R ENCLOSURE W/ 150A M.C.B, SERVICE ENTRANCE EQUIPMENT RATED A PERMANENT SIGN SHALL BE PLACED AT THE ELECTRICAL SERVICE ENTRANCE EQUIPMENT THAT INDICATES THE LOCATION OF ON-SITE OPTIONAL STANDBY POWER SOURCE. A PERMANENT SIGN SHALL BE PLACED AT THE TRANSFER SWITCH LOCATION INDICATING THE SEQUENCE OF OPERATION TO START THE GENERATOR AND TRANSFER THE ELECTRICAL LOADS. BOND GENERATOR FRAME TO BE GROUNDED PER NEC 250GI FUEL PIPE SHALL BE BONDED AS PER NEC 250.104(B) I I TRANSFER SWITCH IS NON-SEPARATELY DERIVED SYSTEM.ENERATOR FRAME AND GAS PIPE ONLY ALL ELECTRICAL / PLUMBING / MECHANICAL EQUIPMENT SHALL BE ABOVE REQUIRED ELEVATION AS PER CHAPTER 11C-5(F)(4) ( 3) 3/8 DIA. X 3" EXP. ANCHORS DAVID THOMPSON5411 LAKE PLACE DRIVEFORT PIERCE, FL. 34951NORTH EXISTING METER 150 AMP 120/240 VOLT SINGLE PHASE EXISTING PANEL 150 AMP 120/240 VOLT SINGLE PHASE NEW SERVICE RATED TRANSFER SWITCH 150 AMP 120/240 VOLT SINGLE PHASE 1'-6" 8'-2" 34'-0" NEW 22 KW AIR COOLED GENERATOR 100 AMP 120/240 VOLT 2 POLE SINGLE PHASE BREAKER MOUNTED ON A 4" APPROVED PRECAST PAD 12'-0" 12'-0" 500 Gallon underground propane tank