Loading...
HomeMy WebLinkAboutREVISION, Specification-TPOS SystemsMechanically attached, 09-04-2019OFFICE USE ONLY: DATE FILED: REVISION FEE: LOCATION/SITE PERMIT # RECEIPT # PLANNING & DEVELOPMENT SERVICES BUILDING & CODE REGULATION DIVISION 2300 VIRGINIA AVENUE FORT PIERCE, FL 34982-5652 (772) 462.1553 APPLICATION FOR BUILDING PERMIT REVISIONS PROJECT INFORMATION ADDRESS: 1.31 ar►�I�n '�\ i-��� �%-ercc r L 3�AR $2. DETAILED DESCRIPTION OF PROJECT REVISIONS: CONTRACTOR INFORMATION: STATE of FL REG./CERT. #: CLC_J7 -4_ ST. LUCIE CO CERT. #: BUSINESS NAME: QUALIFIERS NAME: 'T`ir� Sz,. ADDRESS: Lane_ CITY: I br> STATE:1= (_ ZIP: -�Hcj S :j PHONE (DAYTIME): Z - ?,moi A:) �: l FAX: OWNER/BUILDER INFORMATION: NAME: `fes ADDRESS: CITY: -ef c e- STATE: FC- PHONE LPHONE (DAYTIME: FAX: ARCHITECT/ENGINEER INFORMATION: NAME: ADDRESS: CITY: STATE: PHONE (DAYTIME): SLCCC: 9/23/09 Revised 06/30/17 FAX: ZIP: 3t -IG k 2 ZIP: MULE-HIDE PRODUCTS CO., INC Page 24 05-1111 System Specifications MECHANICALLY ATTACHED TPO Revision Date: September 2018 insulation manufacturers guidelines for the appropriate type, size and thickness of the insulation needed for use over the respective substrate and under the Mule-Hide Mechanically Attached Roofing System. K. Mule-Hide's minimum attachment rates shall be as follows: 2' by 4' boards shall be 2 per board 4' by 4' boards shall be 4 per board 4' by 8' boards shall be 6 per board (for boards up to 2" thick) 4' by 8' boards shall be 5 per board (for boards 2” thick or greater) Contact Mule-Hide’s Technical Department for FM approvals and required attachment rates that are determined by deck type, insulation brand, type and thickness. When using multiple layers of insulation or more than one type of insulation, the number of fasteners required per board is determined by the top layer of insulation. L. If a slipsheet is to be installed, the roof membrane shall be installed immediately after the slipsheet to prevent any displacement. The slipsheet should be overlapped a minimum of 4 inches on each edge. Plates and fasteners may be necessary to anchor the slipsheet when installing in windy conditions. Sufficient fasteners should be used to ensure the slipsheets lay flat under the roof membrane. 3.07 Membrane Installation A. General - Unroll the Mule-Hide TPO Membrane and position without stretching. Allow the membrane to relax at least 15 minutes when the temperature is above 60°F, or 30 minutes when the temperature is below 60°F, prior to installation. Inspect and remove any damaged membrane. B. Membrane must run perpendicular to the direction of steel deck flutes and orientation of wood decks where possible. C. All membrane overlaps shall be installed to facilitate the flow of water. Seams shall be shingled or run parallel to the flow of water. Backwater seams are not permitted. D. Lap sheets a minimum of 5-1/2 inches for In-Lap Fastening, leaving space for a continuous, minimum 2” weld beyond the outside edge of the fasteners and discs. Membrane overlaps shall be shingled