HomeMy WebLinkAboutBUXTON RES.-LAYOUT0
0
N
a
LOT 283.11 x 160.03 457306 s.f. (1.04 AC,) SETBACKS BUILDING AREA CALCULATIONS Project Data
ZONING: AR-1 Front: 50' Living: 1182 Project: Buxton residence
Street Address: T.B.D.
Maximum Building Coverage Allowed: (20%) 9,058 s.f. Rear: 30' Carport: 314 City: Ft. Pierce
Existing Residence: 2,419 s.f. Sides: 20' Entry: 30 County: St. Lucie
Proposed Guesthouse: 1,526 s.f. Total: 1526 State: Florida
Total Building Coverage: 3,945 s.f. (11,4%) Scope of Work
Maximum Guesthouse Allowed: <27419 s.f.
1,526 s.f. Guesthouse Provided. (5.9% of max. building coverage)
35% of the max. building coverage allowed along as it does not exceed Main House square footage.
U
p
� �
25 s.h.
; wh
Egress
i
I
�—,
I
I C7jCCCX
II
Ref
w
,
_
-4"" '-4"�-
3
_"
13
"
51 I
-8"13'
00
\
ic) x
""
(
1
logxO�i�
8'-1
Cing. d
I
—I
dW
I
o
Master Bdrm
E
Kitchen
I
N
N
8'-1"" Ceiling
8'-1 Ceiling
(
N
Oin
,SprO
o
I
I
6'-10"" 3'-00" 3'-2""
0""
3'-4"
6
3'-0""
2'-6""
1
9'-0""
4' 6'-4""
I
25 s.h.
I Q
I
Egress
10ktOX L--- -- P.
N
O
I
-8
I
= �
t
—
Carport
Cing. from j
from F.F.E.
I
I2Y Y7
1 22" 361 0
M
IA` ass Living Room
Bedroom 2 Bedroom 3
�_ 8'-1" o iling
8'-1" Ceiling 8'-1" Ceiling c
o
t ®t
I
9'-10" 10'-0
"
2' "" 15'-8LL=
I
I
I
I
25 s.h.
25 s.h.
i
(2) 25
Egress
Egress
s.h.
CD
M
E.;
o
8'-1 "" Cing.
from F.F.E.
--
--
N
5'-7""
Floor Plan
10'-3""
6'-10"
6'-5""
New one level CBS single family
residence
R30 Batt
Insulation
Wind
Building Code
U
6th Edition Florida Building Code: Residential
2014 National Electric Code NFPA 70
Q
N
Design Loads o w
oo
M
Roof Live Load: 20.0 p.s.f. 0Z
Floor Live Load: N.A. LL LO
Wind Speed: 160 MPH b4A cn ai
Importance Factor: 1.0 - N W
Building Category: 11 0 it co
Wind Exposure: C
Internal Pressure Coefficent: '18 0 —I L
Structure Designed: Enclosed — Q a)
Soil bearing capacity: 2000 p.s_f. F- it o
C Z tr.
l'.l 0
MOON0 >
J X
O
W M
5V Roof Panels Q)
over 30# Felt on Mimi
19/32"c.d.x. plywood fastened ()
as per nailing schedule
Pre Engineered Wood
Roof Trusses 24""o.c.
Shop Drawings by
Others
See Connector
Schedule
12 Galy. Drip Edge
Q 5 � over 1 x 3 p.t.
1/2" d.w.
1 x 4 Firestop 2 x 6 Cedar
Fascia Board
Vented
Two Course Perimeter 2'-0"" Stucco Soffit Over
Beam with (1) #5 Rebar High Ribbed Wire
in each course, Filled Lath
with Grout Install one layer of 15#
felt to framing prior to
installing wire lath
1 x 2 p.t. furring
strips 24"o.c.
with R4.1 Foil
insulation 8 x 16 x 8
CMU Typ.
1 /2" d. .
Light Textured
#5 vert. rebar in Stucco Finish
grout filled cell O C:
See Floor Plan LL Q a
for Locations +J
w X SOW
O
U m li
z >;
2500# Fibermix Conc. #5 Vert. Rebar with W 4CJ:
on .006 Vapor Bearier on 10" Hook and 30" 0 :5
Clean, Compacted, Termite Lap. Tie to Vert. -- U O
U
Treated Fill Rebar In Cells fn CU
uJ N
J
@ � U
coCD
J
M E C4/j)
O samms
F.F.E.
L�7
v� f—
Grade =
\\ U
(2) #5
Rebar
Typical Wall Section
dravm
checked
sl.
date
5/1/2020
scale
as noted
job number
20025
sheet
A-1