Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Certificate of Termite Treatment
St Lucie County Inspe_-_-)ns 2300 Virginia Avenue Ft Pierce, FL 34982� '000R1(772)462-2172 i1ir, t 1 2006 CERTIFICATE OF TERMITE TREA / 3_CONSTRUCTION SOIL TREATMENT PERMIT #70 IJ ! JOB ADDRESS �'0 Z NA [-Lis I4wv BUILDERSJ-s L 1 PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC. PEST CONTROL LICENSE# JB 94495 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: ZOO Percentage of solution: . 2< i CEO Date of treatment: U t'00 L7 1st Treatment ❑ Re -treat ❑Slab ❑ 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ lst'Treatment Chemicals used: P'j. Total gallons used: Time of Treatment: �'i = /.S' FBC104.2.6 Certificate of Protective Treatmentforpreventionoftermites. ri weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates. as.each required protective treatment is . completed providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment .If the soil chemical barrier method for termite prevention is used, fusal exterior treatment shall be completed prior to final building approval St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. ❑ Re -treat ❑ Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6113102 dmg .� St Lucie County Inspec �,)ns 2300 Virginia Avenue Ft Pierce, FL' 34982 (772) 462-21 2 CERTIFICATE OF TERMITE TREATMENT 1 CONSTRUCTION SOIL TREATMENT 0605033,5 JOB ADDRESS KkrC s PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC. PEST CONTROL LICENSE# JB 94495 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: Chemicals used: Percentage of solution: t i S Date of treatment: 'FIFO g 1st Treatment ❑ Re -treat __ : ❑Slab ❑ 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools . ❑ 1st Treatment . Total gallons used: 66 Time of Treatment: FBC104.2.6 Certificate of Protective Treatment forprevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates.as.each required protective treatment is . completed, providing a copy for the person the permit is issued to and another copy forthe building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel boa cover, listing all the treatments and dates of applications.. ❑ Re -trot k' jl � Other (� uw.v" �d�01S 14 1sfTreatment ❑. Re -treat ❑ Perimeter for Final Inspection glsla 6 trMsc-i N Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this forth must be. on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6/I3/02 dmg CpGy� St Lucie County Inspections 2300 Virginia Avenue Ft Fierce, FL 34982 O(772)462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT PEST CONTROL PEST CONTROL LICENSE JOB Soul yes We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 5 rd Percentage of solution: 25 Date of treatment: l0-3a—o6 _Footing a1st Treatment ❑ Re -treat &Slab el-4st Treatment Q Re -treat 0 DriN�eway ❑ 1st Treatment ❑ Re -treat ❑ Pools 0 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment ❑ Re -treat Chemicals used: P,6. d l Total gallons used: Time of Treatment: FUC1.04.2.6 Certificate of Protective Treatment forprevention of termites. A weather resistant jobsiteposting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used identity of the applicator, time and date of the treatment, site location, area treated, chemical used. percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite prevention is used, final cznerior treatment shall be completed prior to fmal building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, fisting all the treatments and dates of applications. ® Perimeter for Final Inspection NOTE: There must be a cdinpleted form for each required treatment or re -treatment and this form must be on the job site to be picked tip by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6113102 dmg PERMIT k St Lucie County Inspect=_ ,!s 2300 Virginia Avenue Ft Pierce, FL 34982 RECEIVES AUG 2 5 2006 i TREAT - — (772) 462.2172 CERTIFICATE OF TERMITE CONSTRUCTION SOIL TREATMENT [� 1 JOB ADDRESS At�1us �E PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC- PEST CONTROL LICENSE # JB 94495 We,. the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National PesControl Association. Square feet of area treated: 2�ol 0-06 Chemicals used: pfO x ac' Percentage of solution: ' S Date of treatment: O -4- ab Footing 1st Treatment ❑ Re -treat C Slab 54 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment ❑ Re -treat Total gallons used: � 3 5 U Time of Treatment: FBC104.2.6 Certificate of Protective Treatment forprevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certfficates.as each required protective treatment is . completed, providing a copy for the person the permit is issued to and another copy forthe building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite prevention is used final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. ❑ Perimeter for Final Inspection Signature of exterminator NOTE. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6113102 dmg St Lucie County Inspec .: its 2300 Virginia Avenue Ft Pierce, FL 34982 (772)462-2172 CERTIFICATE OF TERMITE rX7 CEIV1 2 5 7nn5 TREATMENCONSTRUCTION SOIL TREATMENT iB: BUILDER PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC. PEST CONTROL LICENSE# JB 94495 We,. the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: a o'ao Percentage of solution: . '2-5"! Date of treatment: k-I-r ❑ Footi g Lu 1st Treatment Re -treat L 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment ❑ Re -treat Chemicals used: ?'e- Total gallons used: %GOO Time of Treatment: 2= Je7 FBC104.2.6 Certificate of Protective Treatmentforprevention of termites. ,4 weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certffacates.as each required protective treatment is . completed, providing a copy for the person the permit is issued to and another copy forthe building permitfiles. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. , ❑ Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6113102 dmg W St Lucie County Inspect c�ds 2300 Virginia Avenue Ft Pierce, FL 34982 (772) 462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PEST CONTROL CUN'1'KAGIUK DILIGENT ENVIRUNMENT6s1 a�tcvi�r o, i.. PEST CONTROL LICENSE# JB 94495 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: Percentage of solution: Date of treatment: Atinst lst Treatment ❑ Re-treat Slab A 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ lst'Treatment ❑. Re -treat Chemicals used: -i Total gallons used: 2 lhh-J� Time of Treatment: t©1 FBC1042.6 Certificate of Protective Treatmentforprevendon of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Cert cates.as.each required protective treatment is . completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall be completed prior to ftnal building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. , ❑ Perimeter for Final Inspection NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6113102 dmg . St Lucie County Inspecc'.:.:rs 2300 Virginia Avenue Ft Pierce, FL' 34982 (772)462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERNIIT# JOB PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC. PEST CONTROL LICENSE# JB 94495 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: ) Sl� Chemicals used: -%W'_e Percentage of solution: 'G,Z�`°� Total gallons used: Date of treatment: / Time of Treatment: A"FOOtlno, 1st Treatment 0 Re -treat _. - alit' du 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment . FBC104.2.6 Cerzykate ofProtective Treatmentforprevention of termites. ri weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates,as.each required protective treatment is completed providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Cemficate shall provide the product used identity of the applicator, time and date of the treatment site location, area treated, chemical used, percent concentration and number ofgallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite prevention is used final exterior treatment shall be completed prior to final building approvaL St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. ❑ Re -treat M9ther Z(k�5 ❑ 1st Treatment ❑ Re -treat ❑ Perimeter for Final Inspection NOTE: There must be a completed form for each required treatment or re-trea t and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6/13102 dmg St Lucie County In .FeWons 2300 Virginia Avenue Ft Pierce, FL' 34982 (772)462-2172 CERTIFICATE OF TERMITE TREA' CONSTRUCTION SOIL TREATMENT PERMIT # MD 5 -7d JOB ADDRESS 8'o I DEC.1 2 2006 BUILDER PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC- PEST CONTROL LICENSE# JB 94495 We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: a, 3, 000 Percentage of solution: , ZS' A� Date of treatment: 12- -oG ❑ Footing ❑ 1st Treatment ❑ Re -treat -- ❑Slab ❑ 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment Chemicals used: lot-oSk; a -1-6 Total gallons used: G7o0 Time of Treatment: 1..30 FBC104.2.6 Certificate of Protective Treatmentforprevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate T-eatment Certificates.as.each required protective treatment is . completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used final exterior treatment shall be completed prior to final building approval St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. , �❑ Re -treat U'Perimeter for Final Inspection Signature of exterminator NOTE. There must be a completed farm for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6113102 dmg PERMIT St Lucie County Inspections 2300 Virginia Avenue Ft Pierce, FL34982 (772)462-2172 'A CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT JOB ADDRESS 8-61 k1 Z,=j, s �,,, BUILDER PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC. PEST CONTROL LICENSE #. JB 94495 We,the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 7-50 Chemicals used: l�� , su .loe -7 C Percentage of solution: Total gallons used: Date of treatment: t 2. i -ol Time of Treatment: ❑ Footing ❑ 1st Treatment 0 Re -treat -- O S ab LIB 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment FBC104.2.6 CerttficateofProtectiveTreatmentforpreventionoftermites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certifrcates.as.each required protective treatment is . completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment site location, area treated, chemical used, percent concentration and number ofgallons used to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite prevention is used final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. ❑ Re -treat ❑ Perimeter for Final Inspection - Signature of exterminator NOTE. There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6/13102 dmg PERMIT #. St Lucie County Insp'=,_ ions 2300 Virginia Avenue Ft Pierce, FL 34982 (772) 462-2172 _'44 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT JOB ADDRESS B-0 t 1 1),51, BUILDER PEST CONTROL CONTRACTOR DILIGENT ENVIRONMENTAL SERVICES, INC. PEST CONTROL LICENSE # JB 94495 We,the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 0000 Percentage of solution: . 7 I Date of treatment: tz-G-aC ❑ Footing ❑ 1st Treatment Q Re -treat L 1st Treatment ❑ Re -treat ❑ Driveway ❑ 1st Treatment ❑ Re -treat ❑ Pools ❑ 1st Treatment ❑ Re -treat ❑ Other ❑ 1st Treatment ❑ Re -treat Chemicals used: ID Total gallons used: 600 Time of Treatment: ?;W FBC104.2.6 CerhficateofProtective Treatmentforpreventionoftermites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates.as.each required protective treatment is . completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record ofprotective treatment. If the soil chemical barrier method for termite prevention is used final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications.. ❑ Perimeter for Final Inspection Signature of exterminator NOTE: There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged. Revised 6113102 dmg