Loading...
HomeMy WebLinkAboutConstruction PlansSETUP AND INSTALLATION OF DOUBLE WIDE SHED SETUP AND INSTALLATION OF SINGLE WIDE SHED 1. BUILDING IS PLACED IN REQUESTED LOCATION ON SCHEDULE 40 PVC TO ALLOW FOR MOVEMENT TO PLUM OR SQUARE UNIT TO HOUSE, FENCE, PROPERTY LINE, ETC. 2. ONCE UNIT IS SQUARE AND THE HIGH SPOT OF THE GROUND IS ESTABLISHED, THE BUILDING IS BLOCKED ON THE HIGH SPOT AND LEVELED. THE OTHER END OF THE BUILDING IS BROUGHT UP TO LEVEL AND BLOCKED. THEN THE CENTER OF THE BUILDING IS SUPPORTED TO LEVEL, BLOCKED, AND THEN SHIMMED. 3. AFTER THE BUILDING IS LEVEL, MORE BLOCKS ARE ADDED TO ACHIEVE THE CORRECT SPACING (SEE TABLE 3). 4. ANCHOR PLACEMENT IS ESTABLISHED BY THE WIDTH OF THE BUILDING. HOLES ARE DRILLED THRU THE 2"x4' BOTTOM PLATE WITH A 1/2" AUGER BIT. 1/2" EYEBOLT OR OPTIONAL 1/2" THREADED ROD (FOR A "HIGH SET") IS SECURED THRU THE HOLE. 5. ANCHORS ARE NOT REQUIRED IN THE BOTTOM PLATE FOR DOORS AND DOORWAYS WITH NO FOOTER (GARAGE DOORS FOR EXAMPLE). HEADER DESIGN TRANSFERS THESE LOADS. 6. IF THE UNIT HAS A FLOOR, EITHER A HOLE IS DUG FOR THE 30" AUGER ANCHOR AND BACKFILLED AND SECURED AS PER THE DETAIL OR A 1/2" HOLE IS DRILLED INTO THE CONCRETE 1-1/2" OFF OF RIM JOIST. THE EYEBOLT IS FASTENED THRU THE BOTTOM PLATE AND A SIMPSON A-24 (OR EQUAL) IS SECURED TO THE CONCRETE WITH A 1/2" WEDGE ANCHOR. 7. IF THE UNIT IS A 'NO FLOOR' OPTION, ANCHOR WITH 1/2"x5" WEDGE ANCHOR THRU THE 2"x4" BOTTOM PLATE. TABLE 1 ANCHORING TO CONCRETE SHED WIDTH UPLIFT (PLF) ANCHOR SPACING 20'-0" 400 S-" 13'-8" 280 3-4' I V-8" 240 10'-0" 200 81-0" 160 S-Er 6'-0' 120 S-6' TABLE 2 SKID RUNNER SPACING* SHED WIDTH x1 X2 X3 11'-8" 2'-8" 6'-4" - 10'-O" V-7" W-10' - 8'-0" 0'-9" 6'-6' - 6'-0" 0'-10' 51" - *VALUES ARE FROM END OF JOIST TO CENTERS OF (2) 4"a4" SKIDS ONLY. 13'-8' WIDE SHEDS HAVE (4) SETS OF SKIDS 1. BUILDING IS PLACED IN REQUESTED LOCATION. THE FIRST SECTION OF THE DOUBLE WIDE IS PLACED ON THE HIGHEST LOCATION OF GROUND AND IS LEVELED UP. 2. BLOCKS ARE THEN PLACED AT THE END, CENTER, AND OTHER END TO LEVEL ONCE THE BUILDING IS LEVEL, BLOCKS ARE ADDED TO ACHIEVE THE CORRECT SPACING (SEE TABLE 3). 3. THE NEXT SECTION OF THE SHED IS BACKED INTO PLACE AND UNLOADED PARALLEL WITH THE FIRST SECTION. THE TWO SECTIONS ARE CONNECTED AT THE LOWER CORNER WITH 0)1"1,44" BOLT AND NUT. THE SECOND SECTION IS THEN LEVELED AND THE OTHER BOLT HOLES ARE LINED UP AND BOLTED SECURE. THE REST OF THE BLOCKING IS THEN COMPLETED. THIS PROCEDURE IS REPEATED FOR MULTIPLE SECTION SHEDS UNTIL ALL SECTIONS ARE IN PLACE. 4. GROUND ANCHORS ARE THEN ADDED (SEE TABLE 413). 5. ONCE THE BUILDING IS PROPERLY BLOCKED AND BOLTED TOGETHER, THE SUPPORT BRACING IS REMOVED. 6, ANCHORS ARE NOT REQUIRED IN THE BOTTOM PLATE FOR DOORS AND DOORWAYS WITH NO FOOTER (GARAGE DOORS FOR EXAMPLE). HEADER DESIGN TRANSFERS THESE LOADS. TABLE 3A PAD TYPES TYPE PAD DIMENSIONS MAX. LOAD• MATERIAL I 2'x8'x16' 1776LB5 CO CREPE BLOCK QUWff CEMENT AND SAND MIX II 4"x8"x16" 3500LBS CONCRETE BLOCK QU CEMENT AND SAND MIX III 16"x16" 3950LBS ABS PLASTIC PADS IV B'x8'al 6' 1900IBS CONCRETE BLOCK QUALITY CEMENT AND SAND MIX • BASED ON 2000PSF SOIL BF NG CAPACITY (2000PSF IS TYPICAL) NOTES 1. HOLLOW OR SOLID CONCRETE BLOCKS (8'a8'x16`) MAY BE STACKED ON PADS FOR HIGH SETS UP TO 48' WITHOUT REINFORCING. 2. ABS PADS REQUIRED ON I1'-B' AND 13'-8' WIDE SHEDS ONLY. TABLE 3 SUPPORT FOOTING PAD SPACING FOR RUNNER BLOCKING FOR SINGLE & DOUBLE WIDE SHEDS SHED DESCRIPTION PAD MAXIMUM LOAD AND PAD TYPE SHED WIDTH TYPE LW(PLF) END PAD MAX. SPACING END PAD SIDE RUNNER PAD TYPE INTERIOR PAD SIDE RUNNER PAD TYPE 13'-8" SW/DW 4.15/332 0' TO 6' 6'-0" 1936LB I, II, III. OR IV 1879LB I, II, III, OR IV7 1 I.-8" SW/DW 6.00/480 O" TD 6' 6'-0. 2558LB I, II, III, OR IV 2558LB I, II. III, OR 10'-O" SW/DW 5.00/400 0' TO 6" 6'-0. 24COL13 I, II, III, OR N 2400LB I. II, III, OR N 8'-0" SW 4.00/320 0' TO 6' 6'-0. 2029LB I, U. III, OR IV 2133LB I, II, III, OR IV 600' SW 3.00/240 1 0" TO 6' 6'-0' 1658LB I, U. III, OR IV 1866LB I, II, III, OR N • LOAD WIDTH OF UPLIFT ON RUNNER 1�PAD �SPACING IS ENO TO CENTER OF PAD. 2. PADS OTHER THAN END PADS SPACING IS CENTER TO CENTER. 3. USE SAME MAXIMUM SPACING FOR INTERIOR SPACING. JUL 0 6 2020 S-r. Lucie GENERAL NOTES & SPECIFICATIONS FOR AUGER ANCHORS 1. BUILDING ANCHORS SHALL BE "MOBILE HOME" TYPE HP-1 SINGLE HELIX EYE AUGER ANCHOR BY HOME PRIDE OF BRISTOL, VA. OR EQUAL AVERAGE HOLDING STRENGTH IS NOT LESS THAN 4,900 LBS. 2. ANCHORING SYSTEM TO GROUND PER LOCAL BUILDING CODE (BY DEALER). LOCATE ANCHORS PER TABLE 4A OR 4B. 3. THREADED ROD WITH EYEBOLTS SHALL BE PLACED THRU THE BOTTOM PLATE (FLOOR SYSTEM) AND ATTACHED TO ANCHOR. THESE CAN BE EXTENDED WITH THREADED ROD (OR STRAPS WITH EQUAL OR GREATER STRENGTH) FOR ELEVATED PORTIONS OF SHEDS ON LEVELING BLOCKS. TABLE 4A 30" AUGER ANCHOR SPACING - SINGLE WIDE SHED WIDTHr4O UPUFT (PLF) END ANCHOR-- MAX. INTERIOR SPACING••• 13'-B" 243 0'--0' TO V-e 10'-0" I V-8" 208OQfL:&R 174 �;� A�ircr, ._C" 8'-0" 138 0-0' TOi-T 10'-0" 104 0'-0' TO 3,-w 10'-0" TABLE B 30" AUGER ANCHOR SPACING - DOUBLE WIDE SHED WIDTH LW I UPUFT (PLF) END ANCHOR -- MAX. INTERIOR SPACING••• 20'-0" 10.00 1 400 1 0-0' TO S-0' 1 5'-0' • LOAD YAM OF LOUR ON RUNNER •• LOCATION FROM ENO WALL OF AUGER ANCHOR ••• MAXIMUM SPACING BETWEEN ANCHORS NOTES 1. ANCHOR SPACING IS DESIGNED AS PER ASCE-7. 2. ALL MEASUREMENTS ARE CENTER -TO -CENTER. 3. THE MINIMUM NUMBER OF ANCHORS PER SHED IS (4). (1) ANCHOR PER EACH CORNER. ADDITIONAL INTERIOR ANCHORS ARE REQUIRED IF SPACING IS MORE THAN 10'-0- BETWETSN ANCHORS_ 4. ANCHORS SHALL BE ON SIDE WALLS EXCEPT WHEN THE SHED IS PLACED NEXT TO AN EOSTNG BUILDING; IN WHICH ANCHORS CAN BE PLACED ON THE ENO WALLS AS CLOSE TO THE SIDE AS POSSIBLE. 2'x2' GALVANIZED WASHER l '" 2"x2" GALVANIZED WASHER WITH 1/2" NUT 1/2" THREADED ROD . WITH 1/2' NUY! OPTIONAL FOR 'HIGH NOTCH OR COUNTERSINK BOLT 1/2' THREADED ROD OPTIONAL FOR 'HIGH SET. _ " -" EYES BOLTED TOGETHER WITH 1/2"a2" BOLT & NUT WITH (2)2'a2' GALVANIZED 1/2' COUPLER THRU 2'a4' BOTTOM PLATE 214' BOTTOM PLATE NAILED 1/2- COUPLER i:YEg0 WASHERS (2.000LB SHEAR CAPACITY) _ MIN. 1/2WEDGE ANCHOR CONCRETE INTO SLAB TO 2"a6' P.T. BASE _" .J MIN. 1/2.02' FORGED •• "OTHERS THRU 2'x4' P.T. BOTTOM PLATE-_, ]yl• "`- (SEE TABLE I FOR SPACING) U--------'------ EYES BOLTED TOGETHER WITHMll BOLT &`OR NP WITH WASHADREOUIflED (SEE TABLE 3). ERS OOOLB SHEARCAP)J (2, )� 1/2"x3" (400 LB.) CONCRETE WEDGE ANCHOR SIMPSON A-24 CONCRETE SLAB BY OTHERS THROUGH CUP OR EQUAL LOCAL CODES AND JURISDICTION AL. CONCRETE SLAB BY THROUGH LOCAL CODES AND JURISDICTION �BYOCKING 30" EARTH AUGER ANCHOR yp (SEE TABLE 1 FOR SPACING) (SEE TABLE 4 FOR SPACING), 1 SHED SKID / SHED SHED WITH SKID ANCHORED TO CONCRETE SHED ANCHORED WITH 'NO FLOOR' OPTION TO CONCRETE TO%PAQrQRWBLOGKING� TIE -DOWN DETAILS WOE VERSION FBC 2017 eM Fmlbn A=-> MANUFACTURER S1IPDOLR R®S BUILDING TYPE u STORAGE CONSTRUCTION TYPE V-B FIRE PROTECTION HORS FIRE SUPPFE59GN SYSTEM NONE OCCUPANCY STOPIGE ALLOWABLE NUMBER OF sToIam 1 BASIC WINO SPEED VtlemaW, OMSURE C ENCLOSURE FIIC1115FD INTERNAL PRLSSURE COEFROENT i/- MID IMPORTANCE FACTOR 1.15 ROOF DEAD LOAD Ims ROOF IJVE Lnm 2oP5F 0R Woft FLOOR DEAD LOAD BP¢ FLOOR DYE LOAD SR0. 70P3 - 128PS- mT. 'R' RATING OF WADS. FLOOR ROOF N/A MODULES Pit BUILDING I HUMCANE PROTECTION USAGE Na HURRICANE SH11TOt USAGE M SQUAT E FOOTAGE IL4 TUN Ao WO . REVISIONS REV DESCRIPTION DATE BY t 2017 Rx:111/12/171 MTe 2 1e/26/te I m (n MTB C) Data: LLi 4/26/16 = s NA (n e: Ld ALL GENERAL NOTES } 1. FOUNDATION PLANS ARE NOT PART OF THIS ? PLAN SET AND ARE GOVERNED BY LOCAL JURISDICTION. LJJ 2. THIS BUILDING is ExEMPr FROM THE FBC J NERGY CONSERVATION CODE PER SECTION 15. m 3. REFER TO TIE -DOWN DETAILS FOR PROPER INSTALLATION REQUIREMENTS TO MEET CODE. O 0 d LL1 J Z (n Ld Ilul1 CD 2/5/20 Qo J J Q MottheW T. BOIBWin Florida Uconse 6'', V) Sheet: AD-1 OF 2018-12:' TOP LINE ENGINEERING APPROV ''LAN #SS-B-180-C Side Wall Header Schedule 1180C) End Wan Header Schedule 180C r Max. S Fasteners w/o strap q R b - Building Width 'I Pan NJNI each entl. � tt D4 ALUMINUM ROOF SHEATHING Fasteners w/ strap 1 Y • S¢e Up to 74'Witle each entl 1-2'x4' G� 0 4-3'z 0.131'nails -------_--..,._:_ •_0• �, Max. Span NJ(b) ( )-Wbula- sa Wdl 6-3'z0.131•nails 1-0"x4" U-U 0 3-3'x 0131•nails a. abulatetl values are for No. 2lpto spruce-Pmerirhanbee I m\,-1x4 I M O f NERS m v� END INA.. TRUSS 2'%4' TRUSS 0 224' O.C. MAX 4k4' w2k4' 8'-0" 1 8 - 3' x 0.131' nails b' W - Number ofjack Studs required to support each end. a. Tabulated values ere for No. 2 grade Spmce ine lr lumber. - b. NJ - Number of jack studs required to support each end. tl. No Jack studs. but 2Y6 studs laid Oat.ANN C. Window header for window openings that hate more than 50%combinetl stud wall above •� r_ and below, otherwise use door header schedule. 1. SE FASnMn Si]aDga rA IWmr/NS d. See header details for aRemate layouts, i.e. 2-2k4" or 4'x4" P.T. z, ae evook sa�ms{Ep nma1uW. ? x IIVLV6 wrs Lq@MD fair OR�mNNs Aaoye e. The header can be attached to the top plate and thus hale the combined strength +o �E. onn¢� rerw ro ooaa xama'� CODE INFORMATION equhelent and use the maximum span stated. CODE VmsoN ss zba an ,al.. na-7, mO lef WILL 511� _ II I I 1 II � Y.a' I Dnaam 1 1 I I 11 9EAIRfIf i I 11 11 q l 1 wm 1/T FLYAma ce ass m O5NFA m (lµb• IY.Iz- m rvw Do" Msr�mlolc SI 12' NAIL SIDE WALL WINDOWS nROVENT DETAIL OPTIO A END WALLS WINDOWS & I DOOR 6' WIDE OR LE5S & DOORS YM Mk' ./- a1f MaNUFacmwn s,T{Iaoa sms BUILDING TYPE U G m5�t1l111 $mFME WNS1fiUC110N TYPE V-0 FOIE FROTECnox NaE FIRE s1PPRFS9ON SYSTEM NaNC occuP.WCY smu¢ ANDR48tE NUMBER OF maim 1 BWO N1ND man wr,mamf OPOSURE G MOLDSURE Naasm N70ZNA PRESSURE c0EIT1aEN IMPORTANCE FACTOR 1.15 ROOF DEAD LOAD IDPg G.F.I. - + NOTES -OPTION EI FCmI ROOF WE LOAD lovSF oR fo® pa%r Ipb OUTLET TnP FLODR DEAD Loan 10W ALL WIRWG SHALL BE 14 CAGE 3-WIRE MC GnLE. �rNs'¢uam N -EHC SE IN ALL MErA BO%E6 wdliiim E. Newry, Ill F.Cca LIVE LOAD son. asps- UWSF M. DESIGN PRESSURES SOURCE L ,I SMP-51, S141-79, I!Y Sill W���n 'R MT[w OF WALLr, FLOOR, ROOF N/A ROOF ROOF FRAMING PLAN WIRING DIAGRAM 30&9 vakview Panv Terta[a MODULES PER BUDDING , +27.8 -94.7 (OPTIONAL) GfMa Flotltla 3f)34 HURRICANE FRUTEwuN USk0E ALLs/ODDRs NDOWs +32.6 -292 HURRICANE GHELTER USAGE No W Di m NPff: zr Lrm wnx •Dom a wTmaN 1a1w1LMs wAaY SOUARE FOOTAGE 171. sal,. OR uss m Doll & REVISIONS AuaE r Ijan,mm, 1�0 a� REV DESCRIFTON DATE BY r � % 04 NDMNN Ka,L i i sE/uleNo a•Ilalf i 9F NF/LFR 12- Ih% A u•ac oeAa i 1M WMNFT ox Nmc W DrfNa Br. ldTB i Z 12�12�17 - ViaM11L 0 �` Scala: r N/A b4 SnDS O b4 mIF PWE to afcl . =a- o< wx T DOR FROMIC 3 Cn SS—B-I8OC z,l me DUB z,a sae nuE L>_I a ~ 1. DANs ARE Nor PIRr or TRa rvl, ssr Alm ARE "aim �E�u Ram PAWm SROS sEa1Rm ro axE PUOE W J aaDa TIE ma E%DdY mN n D w I Arf Rmt ra,66ic N11R oaTf- Q. s ssm� TE LIVEPm bftPm NsatunaN E I:A Lg I 2a h �,a.aplz smw R/f-1of Nan! STANDARD WALL DEfA L N01E Nlw` °sae ro�Ra� e i r,mRe A F s. RVTE1 L,a ws z a Aa sw,, axax war. s'-0• ro Ir-0- s•-0• ro lrc rLooR slWnm,c WDH - !/s. DODR &WINDOW OPFIONS aNnmlws 1rvn Pux. m¢ Ir1lsaTa uE Nm mNlwlgyq sxsrr a 1�5, w ans O E/1 O /s Nmm. a wTn ,00 so, r,. R¢L luvs u, m• WmMN ELEVATION CROSS-SECTION END ELEVATION %ts• P.T. pram Fm xxa auwu,Y ns rtyypm - !/4• P.T. Rl'AO.D _ r/�• T� S,WL aE CONED OF U' LVa® STEEL 61Wr IF55 THw ILob• Noyfaa Yuaoms W DOWL a amsla m Ee fmN1m aN-sne BY means 71Pu Lwu TYPICAL ARCH FRAME WITH DOOR E Tae z Con awmrc Nm - r/a• F.T. Te< W C) 7. tut M»uaws AM ocaa ro IAa YIE M10/W aEmlrAras Av1n: 0 ]a' i'-0 31! UD MT Mile U RN veO9C R�� =4f' UD nuaIT 6!'v4E RAft Rom nauxa Ivil F---�.VUS e'-0'ro Ir-e' �--yRaEs r-a•ro 1r-e' -0 wn Mmx n n a 11•b- Yr raj - ,o'-a• ,•-r r-Iv - r-0• a-r a'!• - 'j b 1 I 1 m %C nW ,bv�vmmevyM tlr%,r�nR Y®M, LO ma 6DA e 1 D 9 I I Lf P.T. 24• a.0 aPnaN4 ,zWs 0 IY as I TP. {jml !/4' Tao 0.YBONa1 !•M' P.T. ATYYMD HN m EWN4E11L S£ 1 FaR swam ANO I I 1 1 v LL a PER na mA DRUM oaa. a gqnFFArppµµMLLE»ssLlmossxRVs HN or. BEM ImIND sibnluPK Itl�a+s LEv®s; PnoYloEnixAT TIcInED � Doskar wfF� aslAs m Tlc smuP. T. of LLJ V! CL • �i STATEOF :ice /� CAS,'•'........... • • • • ♦ ` Q ' O I `- `♦♦ 0 Matthew T. Baldwin P.E Florida License #64608 END ELEVATION END ELEVATION Z WITHOUT DOOR W0H GAR4GE GIX1R r�'�' sE 5aE>tie Fm seF t01" ak DmYxu FLOOR FRAMING PLAN I � m I Sheet: SS B-1 OF 1